[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":584},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,12,50,2821,[13,34,46,58,67,79,91,103,115,127,139,151,163,175,187,198,210,222,234,246,258,270,282,293,305,317,329,338,346,357,369,378,388,396,408,416,428,436,444,452,464,476,488,500,512,524,536,548,560,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},908600,1,"单选题","根据《招标投标法实施条例》，关于评标委员会的描述正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","县级以上人民政府有关部门应当组建综合评标专家库",false,{"key":24,"text":25,"correct":26},"B","任何单位和个人不得以明示、暗示等任何方式指定或者变相指定参加评标委员会的专家成员",true,{"key":28,"text":29,"correct":22},"C","评标委员会成员与投标人有利害关系的，不需回避",{"key":31,"text":32,"correct":22},"D","所有的招标项目均采取随机抽取方式确定评标专家","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},908601,"下列关于联合体投标的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"联合体各方均应当具备承担招标项目的相应能力",{"key":24,"text":41,"correct":22},"由同一专业的单位组成的联合体，按照资质等级较低的单位确定资质等级",{"key":28,"text":43,"correct":26},"联合体内部各方应当订立共同投标协议，但该协议由于不属于投标文件，因此不必提交招标人",{"key":31,"text":45,"correct":22},"联合体中标的，联合体各方应当共同与招标人签订合同，就中标项目向招标人承担连带责任",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},908603,"根据《建筑法》在建的建筑工程因故中止施工的，建设单位应当自中止施工起（ ）个月内，向发证机关报告。",[50,52,54,56],{"key":20,"text":51,"correct":26},"1",{"key":24,"text":53,"correct":22},"2",{"key":28,"text":55,"correct":22},"3",{"key":31,"text":57,"correct":22},"6",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},908604,"根据《建设工程质量管理条例》，在正常使用条件，给排水管道工程的最低保修期限（ ）。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":66,"correct":22},"5",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":24,"analysis":33},908605,"根据《建筑工程质量管理条例》，对涉及（ ）的装修工程，建设单位应委托原设计单位或具有相应资质等级的设计单位提出设计方案。",[71,73,75,77],{"key":20,"text":72,"correct":22},"增加工程造价总额",{"key":24,"text":74,"correct":26},"建筑主体和承重结构变动",{"key":28,"text":76,"correct":22},"增加工程内部装修",{"key":31,"text":78,"correct":22},"改变建筑工程局部使用功能",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},908607,"根据《建设工程质量管理条例》，下列关于建设单位的质量责任和义务的说法，正确的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"建设单位报审的施工图设计文件未经审查批准的，不得使用",{"key":24,"text":86,"correct":22},"建设单位不得委托本工程的设计单位进行监理",{"key":28,"text":88,"correct":22},"建设单位在领取施工许可证后，应当按照国家有关规定办理工程质量监督手续",{"key":31,"text":90,"correct":22},"建设单位在工程竣工验收后，应委托施工单位向有关部门移交项目档案",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},908608,"根据《建设工程质量管理条例》，下列关于参建单位的质量责任和义务的说法，正确的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"建设单位在办理工程质量监督手续前，应当按照国家有关规定领取施工许可证",{"key":24,"text":98,"correct":22},"设计单位不应在设计文件中注明选用的建筑材料、建筑构配件和设备的规格、型号、性能等技术指标",{"key":28,"text":100,"correct":26},"施工单位不得转包或者违法分包工程",{"key":31,"text":102,"correct":22},"未经监理工程师签字，建设单位不拨付工程款，不进行竣工验收",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},908609,"根据《建设工程安全生产管理条例》,下列关于参建单位的安全责任的说法，正确的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":26},"建设单位应当自建设工程竣工验收合格之日起15 日内，将建设工程竣工验收报告和规划、公安消防、环保等部门出具的认可文件或者准许使用文件，报建设行政主管部门或者其他有关部门备案",{"key":24,"text":110,"correct":22},"涉及深基坑、地下暗挖工程、脚手架工程的专项施工方案，施工单位还应当组织专家进行论证、审查",{"key":28,"text":112,"correct":22},"施工单位应当建立健全安全生产教育培训制度，应当对管理人员和作业人员每半年至少进行一次安全生产教育培训",{"key":31,"text":114,"correct":22},"施工单位应当自施工起重机械和整体提升脚手架、模板等自升式架设设施验收合格之日起15 日内，向建设行政主管部门或者其他有关部门登记",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},908611,"根据《合同法》，关于要约和承诺的说法，正确的是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"撤回要约的通知应当在要约到达受要约人之后到达受要约人",{"key":24,"text":122,"correct":26},"承诺的内容应当与要约的内容一致",{"key":28,"text":124,"correct":22},"要约邀请是合同成立的必经过程",{"key":31,"text":126,"correct":22},"撤回承诺的通知应当在要约确定的承诺期限内到达要约人",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},908612,"根据《合同法》，执行政府定价或政府指导价的，政府价格调整时，仍按照原价格执行的情形是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":26},"逾期交付标的物的，遇价格上涨时",{"key":24,"text":134,"correct":22},"逾期交付标的物的，遇价格下降时",{"key":28,"text":136,"correct":22},"逾期提取标的物的，遇价格上涨时",{"key":31,"text":138,"correct":22},"无论价格上涨或下降",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},908613,"根据《合同法》，债务人转让合同债务应当（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"通知债权人",{"key":24,"text":146,"correct":22},"与债权人协商",{"key":28,"text":148,"correct":26},"经过债权人的同意",{"key":31,"text":150,"correct":22},"重新签订合同",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},908614,"关于合同争议的仲裁描述不正确的是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"仲裁裁决具有法律约束力",{"key":24,"text":158,"correct":22},"合同当事人应当自觉执行裁决。不执行的，另一方当事人可以申请有管辖权的人民法院强制执行",{"key":28,"text":160,"correct":26},"裁决作出后，当事人就同一争议再申请仲裁或者向人民法院起诉的，仲裁机构或者人民法院应当受理",{"key":31,"text":162,"correct":22},"当事人对仲裁协议的效力有异议的，可以请求仲裁机构作出决定或者请求人民法院作出裁定",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},908616,"根据《国务院关于投资体制改革的决定》，对于常用直接投资和资金注入方式的政府投资项目，政府需要审批其（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":26},"项目建议书和可行性研究报告",{"key":24,"text":170,"correct":22},"开工报告",{"key":28,"text":172,"correct":22},"资金申请报告",{"key":31,"text":174,"correct":22},"项目核准报告",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},908618,"根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的项目，区别不同情况实行（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"专家评议制或政府审批制",{"key":24,"text":182,"correct":26},"核准制或登记备案制",{"key":28,"text":184,"correct":22},"政府审核制或核准制",{"key":31,"text":186,"correct":22},"政府审批制或登记备案制",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},908619,"根据《国务院关于投资体制改革的决定》，对于采用投资补助、转贷和贷款贴息方式的政府投资项目，政府需要审批（ ）。",[191,192,194,196],{"key":20,"text":172,"correct":26},{"key":24,"text":193,"correct":22},"可行性研究报告",{"key":28,"text":195,"correct":22},"初步设计文件",{"key":31,"text":197,"correct":22},"工程总概算",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},908620,"根据《关于实行建设项目法人责任制的暂行规定》，建设项目董事会的基本职责是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"组织编制初步设计文件",{"key":24,"text":205,"correct":26},"负责筹措建设资金",{"key":28,"text":207,"correct":22},"负责控制建设投资、工期和质量",{"key":31,"text":209,"correct":22},"组织单项工程竣工验收",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},908622,"关于partnering 模式的说法，正确的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"partnering 协议是建设单位与承包单位之间的协议",{"key":24,"text":217,"correct":22},"partnering 模式是一种独立存在的承发包模式",{"key":28,"text":219,"correct":22},"partnering 模式特别强调工程参建方基层人员的参与",{"key":31,"text":221,"correct":26},"partnering 协议不是法律意义上的合同",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},908623,"非代理型CM 合同由建设单位与分包单位直接签订，一般采用（ ）的合同形式。",[226,228,230,232],{"key":20,"text":227,"correct":22},"固定单价",{"key":24,"text":229,"correct":22},"可调总价",{"key":28,"text":231,"correct":22},"简单的成本加酬金",{"key":31,"text":233,"correct":26},"保证最大工程费用加酬金的合同",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},908624,"香蕉曲线法的原理与S 曲线法的原理基本相同，其主要区别在于（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"香蕉曲线可以用来控制造价",{"key":24,"text":241,"correct":22},"香蕉曲线可以用来控制进度",{"key":28,"text":243,"correct":26},"香蕉曲线是以工程网络计划为基础绘制的",{"key":31,"text":245,"correct":22},"香蕉曲线可以用来控制质量",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},908627,"下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":26},"直方图法",{"key":24,"text":253,"correct":22},"鱼刺图法",{"key":28,"text":255,"correct":22},"控制图法",{"key":31,"text":257,"correct":22},"S 曲线法",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},908628,"有关“流水节拍”的概念，正确的解释是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"一个专业队的作业时间",{"key":24,"text":265,"correct":22},"一个施工段的持续时间",{"key":28,"text":267,"correct":22},"一个专业队的流水时间",{"key":31,"text":269,"correct":26},"一个专业队在某施工段上的作业时间",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},908629,"下列流水施工参数中，属于工艺参数的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"施工过程和流水强度",{"key":24,"text":277,"correct":22},"工作面和流水步距",{"key":28,"text":279,"correct":22},"施工段和工作面",{"key":31,"text":281,"correct":22},"流水强度和流水段",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":28,"analysis":33},908630,"某工程按全等节拍流水组织施工，共分4 道施工工序，3 个施工段，估计工期为72 天，则其流水节拍应为（ ）天。",[286,287,289,291],{"key":20,"text":57,"correct":22},{"key":24,"text":288,"correct":22},"9",{"key":28,"text":290,"correct":26},"12",{"key":31,"text":292,"correct":22},"18",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},908631,"某工程组织成倍节拍流水施工， 4 个施工段， 4 个施工过程的流水节拍分别为5 ，10，10，15，则该工程的流水工期为（ ）天。",[297,299,301,303],{"key":20,"text":298,"correct":22},"50",{"key":24,"text":300,"correct":26},"55",{"key":28,"text":302,"correct":22},"60",{"key":31,"text":304,"correct":22},"70",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},908635,"等节奏流水施工与非节奏流水施工的共同特点是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"相邻施工过程的流水步距相等",{"key":24,"text":312,"correct":22},"施工段之间可能有空闲时间",{"key":28,"text":314,"correct":26},"专业工作队数等于施工过程数",{"key":31,"text":316,"correct":22},"各施工过程在各施工段的流水节拍相等",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},908636,"某工程划分为3 个施工过程、4 个施工段组织固定节拍流水施工，流水节拍为5 天，累计间歇时间为2 天，累计提前插入时间为3 天，该工程流水施工工期为（ ）天。",[321,323,325,327],{"key":20,"text":322,"correct":26},"29",{"key":24,"text":324,"correct":22},"30",{"key":28,"text":326,"correct":22},"34",{"key":31,"text":328,"correct":22},"35",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},908637,"某分部工程划分为4 个施工过程、3 个施工段，组织加快的成倍节拍流水施工，如果流水节拍分别为6、4、4、2 天，则流水步距为（ ）天。",[333,334,335,337],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":336,"correct":22},"4",{"key":31,"text":57,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},908638,"某工程划分为3 个施工过程、4 个施工段，组织加快的成倍节拍流水施工，流水节拍分别为4 天、4 天和2天，则应派（ ）个专业工作队参与施工。",[342,343,344,345],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":28,"text":336,"correct":22},{"key":31,"text":66,"correct":26},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},908639,"某分部工程由4 个施工过程组成，分为3 个施工段组织流水施工，其流水节拍（天）见下表。则流水步距之和为（ ）天。",[350,351,353,355],{"key":20,"text":290,"correct":26},{"key":24,"text":352,"correct":22},"10",{"key":28,"text":354,"correct":22},"11",{"key":31,"text":356,"correct":22},"15",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},908640,"某分部工程划分为3 个施工过程、4 个施工段组织流水施工，流水节拍分别为3、5、4、4 天，4、4、3、4天和3、4、2、3 天，则其流水施工工期为（ ）天。",[361,363,365,367],{"key":20,"text":362,"correct":22},"19",{"key":24,"text":364,"correct":22},"20",{"key":28,"text":366,"correct":22},"21",{"key":31,"text":368,"correct":26},"23",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},908641,"某工程有3 个施工过程，分为3 个施工段组织流水施工。3 个施工过程的流水节拍以此为3、3、4 天，5、2、1 天和4、1、5 天，则流水施工工期为（ ）天。",[373,374,376,377],{"key":20,"text":57,"correct":22},{"key":24,"text":375,"correct":22},"17",{"key":28,"text":292,"correct":26},{"key":31,"text":362,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},908642,"已知某工作总时差为8 天，最迟完成时间为第16 天，最早开始时间为第7 天，则该工作的持续时间为（ ）天。",[382,384,386,387],{"key":20,"text":383,"correct":22},"8",{"key":24,"text":385,"correct":22},"7",{"key":28,"text":336,"correct":22},{"key":31,"text":51,"correct":26},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},908643,"某分部工程双代号网络计划如下图所示，节点中下方数字为该工作的持续时间（单位：天），其关键线路有（ ）条。",[392,393,394,395],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":22},{"key":31,"text":336,"correct":26},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},908644,"某工程双代号网络图如下图所示，存在的绘图错误是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":26},"多个起点节点",{"key":24,"text":403,"correct":22},"多个终点节点",{"key":28,"text":405,"correct":22},"节点编号有误",{"key":31,"text":407,"correct":22},"存在循环回路",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},908645,"工程网络计划中，工作D 有两项紧后工作，最早开始时间分别为17 和20，工作D 的最开始时间为12，持续时间为3，则工作D 的自由时差为（ ）。",[412,413,414,415],{"key":20,"text":66,"correct":22},{"key":24,"text":336,"correct":22},{"key":28,"text":55,"correct":22},{"key":31,"text":53,"correct":26},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},908646,"在某工程双代号网络计划中，工作M 的最早开始时间和最迟开始时间分别为第15 天和第18 天，其持续时间为7 天。该工作有两项紧后工作，它们的最早开始时间分别为第24 天和第26 天，则工作M 的总时差和自由时差分别为（ ）天。",[420,422,424,426],{"key":20,"text":421,"correct":22},"分别为4 和0",{"key":24,"text":423,"correct":22},"均为3",{"key":28,"text":425,"correct":26},"分别为3 和2",{"key":31,"text":427,"correct":22},"均为2",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},908647,"某工程双代号网络计划如下图所示，其中关键线路由（ ）条。",[432,433,434,435],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":22},{"key":31,"text":336,"correct":26},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":28,"analysis":33},908648,"某工程双代号网络计划如图所示，其中关键线路有（ ）条。",[440,441,442,443],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":26},{"key":31,"text":336,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},908649,"某工程双代号时标网络计划如下图所示(单位:周)，则在不影响总工期的前提下，工作E 可以利用的机动时间为（ ）周。",[448,449,450,451],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":336,"correct":22},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},908650,"某工程双代号时标网络计划如下图所示，其中工作B 的总时差和自由时差（ ）周。",[456,458,460,462],{"key":20,"text":457,"correct":22},"均为1",{"key":24,"text":459,"correct":26},"分别为2 和1",{"key":28,"text":461,"correct":22},"分别为4 和1",{"key":31,"text":463,"correct":22},"均为4",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},908651,"某人连续5 年，每年末存入银行20 万元，银行存款年利率6%，按年复利计算。则第5 年年末，可一次性地收回的金额为（ ）万元。",[468,470,472,474],{"key":20,"text":469,"correct":22},"104.80",{"key":24,"text":471,"correct":22},"106.00",{"key":28,"text":473,"correct":22},"107.49",{"key":31,"text":475,"correct":26},"112.74",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},908652,"某施工企业投资200 万元购入一台施工机械，计划从购买日起的未来6 年等额收回投资并获取收益，若基准收益率为10%，复利计息，则每年末应获得的净现金流入为（ ）万元。",[480,482,484,486],{"key":20,"text":481,"correct":26},"200×(A\u002FP,10%,6)",{"key":24,"text":483,"correct":22},"200×(F\u002FP,10%, 6)",{"key":28,"text":485,"correct":22},"200×(A\u002FF,10%, 7)",{"key":31,"text":487,"correct":22},"200×(F\u002FP,10%,7)",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},908653,"某借款年利率为8%，半年复利计息一次，则该借款年有效利率比名义利率高（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"0.16%",{"key":24,"text":495,"correct":22},"1.25%",{"key":28,"text":497,"correct":22},"4.16%",{"key":31,"text":499,"correct":22},"0.64%",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},908654,"某施工企业从银行借款100 万元，期限3 年，年利率8%，按年计息并于每年末付息，则第3 年末企业需偿还的本利和为（ ）万元。",[504,506,508,510],{"key":20,"text":505,"correct":22},"100",{"key":24,"text":507,"correct":22},"124",{"key":28,"text":509,"correct":26},"108",{"key":31,"text":511,"correct":22},"126",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},908655,"某企业借款1000 万元，期限2 年，年利率8%，按年复利计息，到期一次性还本付息，则第2 年应计的利息为（ ）万元。",[516,518,520,522],{"key":20,"text":517,"correct":22},"40.0",{"key":24,"text":519,"correct":22},"80.0",{"key":28,"text":521,"correct":22},"83.2",{"key":31,"text":523,"correct":26},"86.4",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":31,"analysis":33},908656,"某施工企业向银行借款250 万元，期限4 年，年利率3%，每年复利计息一次。第四年末还本付息，则到期企业需支付给银行的利息为（ ）万元。",[528,530,532,534],{"key":20,"text":529,"correct":22},"30.00",{"key":24,"text":531,"correct":22},"30.45",{"key":28,"text":533,"correct":22},"30.90",{"key":31,"text":535,"correct":26},"31.38",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":28,"analysis":33},908657,"某企业年初借款2000 万元，按年复利计息，年利率是8%。第三年末还款1200 万元，剩余本息在第五年末全部还清，则第五年末需还本付息（ ）万元。",[540,542,544,546],{"key":20,"text":541,"correct":22},"1388.80",{"key":24,"text":543,"correct":22},"1484.80",{"key":28,"text":545,"correct":26},"1538.98",{"key":31,"text":547,"correct":22},"1738.66",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},908658,"某项目建设期为2 年，运营期为5 年。建设期内每年年初贷款分别为300 万元和500 万元，年利率为10% 。若在运营期后3 年每年末等额偿还贷款，则每年应偿还的本利和为（ ）万元。",[552,554,556,558],{"key":20,"text":553,"correct":26},"444.22",{"key":24,"text":555,"correct":22},"413.52",{"key":28,"text":557,"correct":22},"560.49",{"key":31,"text":559,"correct":22},"601.34",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},908659,"已知年名利率为8%，每季度复利计息一次，则年有效利率为（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"8.8%",{"key":24,"text":567,"correct":26},"8.24%",{"key":28,"text":569,"correct":22},"8.16%",{"key":31,"text":571,"correct":22},"8.00%",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":28,"analysis":33},908660,"某企业向银行借贷一笔资金，按月计息，月利率为1.2% ，则年名义利率和年有效利率分别为（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"13.53%和14.40%",{"key":24,"text":579,"correct":22},"13.53%和15.39%",{"key":28,"text":581,"correct":26},"14.40%和15.39%",{"key":31,"text":583,"correct":22},"14.40%和15.62%",[585,588,591,594,597,600],{"id":15,"name":586,"category":7,"favorite":587},"领导干部任职前廉政法规知识测试题",92,{"id":589,"name":590,"category":7,"favorite":15},595,"建筑结构与设备",{"id":592,"name":593,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":595,"name":596,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":598,"name":599,"category":7,"favorite":8},534,"BIM工程师",{"id":601,"name":599,"category":7,"favorite":8},535]