[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,11,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,209,221,233,245,257,269,281,293,301,313,325,337,345,357,367,379,391,403,415,427,439,451,460,471,483,495,507,519,531,543,555,567,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},908540,1,"单选题","(2013年)在工程费用监控过程中，明确费用控制人员的任务和职责分工，改善费用控制工作流程等措施，属于费用偏差纠正的()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","合同措施",false,{"key":24,"text":25,"correct":22},"B","技术措施",{"key":27,"text":28,"correct":22},"C","经济措施",{"key":30,"text":31,"correct":32},"D","组织措施",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},908541,"(2012年)下列方法中，可用于编制工程项目成本计划的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"净值分析法",{"key":24,"text":41,"correct":32},"目标利润法",{"key":27,"text":43,"correct":22},"工期—成本同步分析法",{"key":30,"text":45,"correct":22},"成本分析表法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},908542,"(2011年)某公司2011年3月份新购入一项固定资产，4月份安装调试完成，5月份投入使用。该项固定资产应从当年()月份开始计提折旧。",[50,52,54,56],{"key":20,"text":51,"correct":22},"3",{"key":24,"text":53,"correct":22},"4",{"key":27,"text":55,"correct":22},"5",{"key":30,"text":57,"correct":32},"6",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},908543,"(2010年)在工程项目成本管理中，由进度偏差引起的累计成本偏差可以用()差值度量。",[62,64,66,68],{"key":20,"text":63,"correct":32},"已完工程预算成本与拟完工程预算成本",{"key":24,"text":65,"correct":22},"已完工程预算成本与已完工程实际成本",{"key":27,"text":67,"correct":22},"已完工程实际成本与拟完工程预算成本",{"key":30,"text":69,"correct":22},"已完工程实际成本与已完工程预算成本",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},908544,"(2014年)关于项目资本金的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目资本金是债务性资金",{"key":24,"text":77,"correct":22},"项目法人要承担项目资本金的利息",{"key":27,"text":79,"correct":32},"投资者可转让项目资本金",{"key":30,"text":81,"correct":22},"投资者可抽回项目资本金",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},908545,"(2014年)施工成本核算中，固定资产折旧的起算时间和计提方式分别是固定资产投入使用的（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"当月起，按月计提",{"key":24,"text":89,"correct":32},"次月起，按月计提",{"key":27,"text":91,"correct":22},"单月起，按年计提",{"key":30,"text":93,"correct":22},"次月起，按年计提",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},908546,"(2014年)某工程施工至2014年7月底，已完工程计划费用（BCWP）为600万元，已完工程实际费用（ACWP）为800万元，拟完工程计划费用（BCWS）为700万元，则该工程此时的偏差情况是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"费用节约，进度提前",{"key":24,"text":101,"correct":32},"费用超支，进度拖后",{"key":27,"text":103,"correct":22},"费用节约，进度拖后",{"key":30,"text":105,"correct":22},"费用超支，进度提前",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},908547,"(2015年)与传统贷款方式相比，项目融资的特点是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"贷款人有资金的实权",{"key":24,"text":113,"correct":32},"风险种类多",{"key":27,"text":115,"correct":22},"对投资人资信要求高",{"key":30,"text":117,"correct":22},"融资成本低",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},908548,"(2015年)为核算施工成本，施工项目经理部应建立和健全以()为对象的成本核算财务体系。",[122,124,126,128],{"key":20,"text":123,"correct":32},"单位工程",{"key":24,"text":125,"correct":22},"单项工程",{"key":27,"text":127,"correct":22},"分部工程",{"key":30,"text":129,"correct":22},"分项工程",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},908549,"(2015年)下列施工成本管理方法中，可用于施工成本分析的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"技术进步法",{"key":24,"text":137,"correct":32},"因素分析法",{"key":27,"text":139,"correct":22},"定率估算法",{"key":30,"text":141,"correct":22},"挣值分析法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},908550,"(2016年)采用目标利润法编制成本计划时，目标成本的计算方法是从()中扣除目标利润。",[146,148,150,152],{"key":20,"text":147,"correct":22},"概算价格",{"key":24,"text":149,"correct":22},"预算价格",{"key":27,"text":151,"correct":32},"合同价格",{"key":30,"text":153,"correct":22},"结算价格",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},908551,"(2016年)按工期一成本同步分析法，造成工程项目实施中出现虚盈现象的原因是()。",[158,160,162,164],{"key":20,"text":159,"correct":32},"实际成本开支小于计划，实际施工进度落后计划",{"key":24,"text":161,"correct":22},"实际成本开支等于计划，实际施工进度落后计划",{"key":27,"text":163,"correct":22},"实际成本开支大于计划，实际施工进度等于计划",{"key":30,"text":165,"correct":22},"实际成本开支小于计划，实际施工进度等于计划",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},908552,"(2016年)施工项目经理部应建立和健全以()为对象的成本核算账务体系。",[170,171,172,173],{"key":20,"text":129,"correct":22},{"key":24,"text":127,"correct":22},{"key":27,"text":123,"correct":32},{"key":30,"text":125,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},908553,"(2013年)按工程进度绘制的资金使用计划S曲线必然包括在&ldquo;香蕉图&rdquo;内，该&ldquo;香蕉图&rdquo;是由工程网络计划中全部工作分别按()绘制的两条S曲线组成。",[178,180,182,184],{"key":20,"text":179,"correct":22},"最早开始时间(ES)开始和最早完成时间(E F)完成",{"key":24,"text":181,"correct":32},"最早开始时间(ES)开始和最迟开始时间(LS)开始",{"key":27,"text":183,"correct":22},"最迟开始时间(LS)开始和最早完成时间(E完成",{"key":30,"text":185,"correct":22},"最迟开始时间(LS)开始和最迟完成时间(L完成",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},908554,"(2009年)某固定资产原值为20万元，现评估市值为25万元，预计使用年限为10年，净残值率5%。采用平均年限法折旧，则年折旧额为()万元。",[190,192,194,196],{"key":20,"text":191,"correct":32},"1.9",{"key":24,"text":193,"correct":22},"2",{"key":27,"text":195,"correct":22},"2.38",{"key":30,"text":197,"correct":22},"2.5",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},908555,"(2009年)下列成本分析方法中，主要用来确定目标成本、实际成本和降低成本的比例关系，从而为寻求降低成本的途径指明方向的是()。",[202,204,206,207],{"key":20,"text":203,"correct":32},"构成比率法",{"key":24,"text":205,"correct":22},"相关比率法",{"key":27,"text":137,"correct":22},{"key":30,"text":208,"correct":22},"差额计算法",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":27,"analysis":33},908556,"(2013年)根据《标准施工招标文件》，由施工承包单位提出的索赔按程序得到了处理，且施工单位接受索赔处理结果的，建设单位应在作出索赔处理答复后()天内完成赔付。",[213,215,217,219],{"key":20,"text":214,"correct":22},"14",{"key":24,"text":216,"correct":22},"21",{"key":27,"text":218,"correct":32},"28",{"key":30,"text":220,"correct":22},"42",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},908557,"(2010年)对于不同年份使用程度差别大的专业机械、设备，应采用()折旧。",[225,227,229,231],{"key":20,"text":226,"correct":32},"工作量法",{"key":24,"text":228,"correct":22},"平均年限法",{"key":27,"text":230,"correct":22},"年数总和法",{"key":30,"text":232,"correct":22},"双倍余额递减法",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":27,"analysis":33},908558,"(2014年)下列可导致承包商索赔的原因中，属于业主方违约的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"业主指令增加工程量",{"key":24,"text":240,"correct":22},"业主要求提高设计标准",{"key":27,"text":242,"correct":32},"监理人不按时组织验收",{"key":30,"text":244,"correct":22},"材料价格大幅度上涨",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},908559,"(2015年)根据《建设工程价款结算暂行办法》，对于施工承包单位超交的金额为6000万元的工程竣工结算报告，建设单位的审查时限是()天。",[249,251,253,255],{"key":20,"text":250,"correct":22},"30",{"key":24,"text":252,"correct":22},"45",{"key":27,"text":254,"correct":32},"60",{"key":30,"text":256,"correct":22},"90",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},908560,"(2016年)某工程施工至某月底，经统计分析得：已完工程计划费用1800万元，已完工程实际费用2200万元，拟完工程计划费用1900万元，则该工程此时的进度偏差是()万元。",[261,263,265,267],{"key":20,"text":262,"correct":32},"-100",{"key":24,"text":264,"correct":22},"-200",{"key":27,"text":266,"correct":22},"-300",{"key":30,"text":268,"correct":22},"-400",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":30,"analysis":33},908561,"（2017年考题）某固定资产原价为10000 元，预计净残值为1000 元，预计使用年限为4 年，采用年数总和法进行折旧，则第4 年的折旧额为（）元。",[273,275,277,279],{"key":20,"text":274,"correct":22},"2250",{"key":24,"text":276,"correct":22},"1800",{"key":27,"text":278,"correct":22},"1500",{"key":30,"text":280,"correct":32},"900",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},908562,"（2017年考题）其工程施工至2016 年12 月底,已完工程计划用2000 万元,拟完工程计划费用2500 万元,已完工程实际用为1800 万元,则此时该工程的费用绩效指数CPI 为（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"0.8",{"key":24,"text":288,"correct":22},"0.9",{"key":27,"text":290,"correct":32},"1.11",{"key":30,"text":292,"correct":22},"1.25",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":30,"analysis":33},908564,"(2012年)各年折旧基数不变但折旧率逐年递减的固定资产折旧方法是()。",[297,298,299,300],{"key":20,"text":228,"correct":22},{"key":24,"text":226,"correct":22},{"key":27,"text":232,"correct":22},{"key":30,"text":230,"correct":32},{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":27,"analysis":33},908565,"(2018年)某项固定资产原值为50000 元，预计使用年限为6 年。预计净残值为2000 元，采用年数总和法进行折旧时，第3 年的折旧额为（ ）元。",[305,307,309,311],{"key":20,"text":306,"correct":22},"6257",{"key":24,"text":308,"correct":22},"6000",{"key":27,"text":310,"correct":32},"9143",{"key":30,"text":312,"correct":22},"9520",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},908566,"(2018年)某工程施工至月底时的情况为:已完工程量120m.实际单价8000 元\u002F，计划工程量100,计划单价7500 \u002Fm,则工程量在月底的费用偏差为（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":32},"超支6 万元",{"key":24,"text":320,"correct":22},"节约6 万元",{"key":27,"text":322,"correct":22},"超支15 万元",{"key":30,"text":324,"correct":22},"节约15 万元",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":30,"analysis":33},908567,"（2019年）工程施工过程中，对于施工承包单位要求的工程变更。施工承包单位提出的程序是（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"向建设单位提出书面变更请求，阐明变更理由",{"key":24,"text":332,"correct":22},"向设计单位提出书面变更建议，并附变更图纸",{"key":27,"text":334,"correct":22},"向监理人提出书面变更通知，并附变更详情",{"key":30,"text":336,"correct":32},"向监理人提出书面变更建议，阐明变更依据",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},908568,"（2019年）施工项目经理部成本核算账务体系应以（ ）为对象。",[341,342,343,344],{"key":20,"text":125,"correct":22},{"key":24,"text":123,"correct":32},{"key":27,"text":127,"correct":22},{"key":30,"text":129,"correct":22},{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},908569,"（2019年）按工程进度编制施工阶段资金使用计划,首要进行的工作是（ ）",[349,351,353,355],{"key":20,"text":350,"correct":22},"计算单位时间的资金支出目标",{"key":24,"text":352,"correct":32},"编制工程施工进度计划",{"key":27,"text":354,"correct":22},"绘制资金使用时间进度计划S曲线",{"key":30,"text":356,"correct":22},"计算规定时间内累计资金支出额",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":27,"analysis":33},908570,"(2018年)下列施工成本管理方法中，能预测在建工程尚需成本数额，为后续工程施工成本和进度控制指明方向的方法是（ ）。",[361,363,365,366],{"key":20,"text":362,"correct":22},"工期一成本同步分析法",{"key":24,"text":364,"correct":22},"价值工程法",{"key":27,"text":141,"correct":32},{"key":30,"text":137,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},908573,"(2013年)关于质量保证金的使用及返还，下列说法正确的是()。",[371,373,375,377],{"key":20,"text":372,"correct":32},"不实行国库集中支付的政府投资项目，保证金可以预留在财政部门",{"key":24,"text":374,"correct":22},"采用工程质量保证担保的，发包人仍可预留2%的保证金",{"key":27,"text":376,"correct":22},"非承包人责任的缺陷，承包人仍有缺陷修复的义务",{"key":30,"text":378,"correct":22},"缺陷责任期终止后的28天内，发包人应将剩余的质量保证金连同利息返还给承包人",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},908574,"(2015年)关于缺陷责任期与保修期，下列说法中正确的是( )。",[383,385,387,389],{"key":20,"text":384,"correct":22},"缺陷责任期就是保修期",{"key":24,"text":386,"correct":32},"屋面防水工程的保修期为5年",{"key":27,"text":388,"correct":22},"结构工程的保修期为10年",{"key":30,"text":390,"correct":22},"给排水管道的保修期为5年",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":30,"analysis":33},908575,"(2016年)建设工程在缺陷责任期内，由第三方原因造成的缺陷()。",[395,397,399,401],{"key":20,"text":396,"correct":22},"应由承包人负责维修，费用从质量保证金中扣除",{"key":24,"text":398,"correct":22},"应由承包人负责维修，费用由发包人承担",{"key":27,"text":400,"correct":22},"发包人委托承包人维修的，费用由第三方支付",{"key":30,"text":402,"correct":32},"发包人委托承包人维修的，费用由发包人支付",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},908576,"（2017 年考题）关于工程质量保证金，下列说法中正确的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"质量保证金总预留比例不得高于签约合同价的5%",{"key":24,"text":410,"correct":32},"已经缴纳履约保证金的，不得同时预留质量保证金",{"key":27,"text":412,"correct":22},"采用工程质量保证担保的，预留质量保证金不得高于合同价的2%",{"key":30,"text":414,"correct":22},"质量保证金的返还期限一般为2 年",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},908577,"（2019年）某工程合同约定以银行保函替代预留工程质量保证金，合同签约价为800万元，工程价款结算总额为780万元，依据《建过程质量保证金管理办法》该保函金额最大为（ ）万元。",[419,421,423,425],{"key":20,"text":420,"correct":22},"15．6",{"key":24,"text":422,"correct":22},"16 . 0",{"key":27,"text":424,"correct":32},"23．4",{"key":30,"text":426,"correct":22},"24．0",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":30,"analysis":33},908578,"（2019年）工程竣工结算审查时，对变更签证凭据审查的主要内容是其真实性、合法性和（）",[431,433,435,437],{"key":20,"text":432,"correct":22},"严密性",{"key":24,"text":434,"correct":22},"包容性",{"key":27,"text":436,"correct":22},"可行性",{"key":30,"text":438,"correct":32},"有效性",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},908580,"根据我国的最新规定，取得造价工程师执业资格证书的人员，可自资格证书签发之日起（ ）内申请初始注册。",[443,445,447,449],{"key":20,"text":444,"correct":22},"3 个月",{"key":24,"text":446,"correct":22},"6 个月",{"key":27,"text":448,"correct":32},"1 年",{"key":30,"text":450,"correct":22},"2 年",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},908581,"根据《注册造价工程师管理办法》，注册造价工程师职业刚满1 年时变更注册单位，则该注册造价工程师在新单位的注册有效期为（ ）年。",[455,457,458,459],{"key":20,"text":456,"correct":22},"1",{"key":24,"text":193,"correct":22},{"key":27,"text":51,"correct":32},{"key":30,"text":53,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},908582,"根据《工程造价咨询企业管理办法》，乙级工程造价咨询企业中，注册造价工程师不少于（ ）人。",[464,465,467,469],{"key":20,"text":57,"correct":32},{"key":24,"text":466,"correct":22},"8",{"key":27,"text":468,"correct":22},"10",{"key":30,"text":470,"correct":22},"12",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},908583,"从投资者(业主)角度分析，工程造价是指建设一项工程预期或实际开支的（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"全部建筑安装工程费用",{"key":24,"text":478,"correct":22},"建设工程总费用",{"key":27,"text":480,"correct":32},"全部固定资产投资费用",{"key":30,"text":482,"correct":22},"建设工程动态投资费用",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},908584,"工程造价中一种重要的，也是较为典型的价格交易形式是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"建设项目总投资",{"key":24,"text":490,"correct":22},"建设项目固定资产投资",{"key":27,"text":492,"correct":32},"建设项目承发包价格",{"key":30,"text":494,"correct":22},"建设项目流动资产投资",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":30,"analysis":33},908586,"某项目中建筑安装工程费用为560 万元，设备和工、器具购置费工为330 万元，工程建设其他费用为133 万元，基本预备费为102 万元，涨价预备费55 万元，建设期贷款利息为59 万元，则动态投资为（ ）万元。",[499,501,503,505],{"key":20,"text":500,"correct":22},"1023",{"key":24,"text":502,"correct":22},"1125",{"key":27,"text":504,"correct":22},"1180",{"key":30,"text":506,"correct":32},"1239",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},908587,"根据《工程造价咨询企业管理办法》，下列关于工程造价咨询管理的说法，正确的有（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"工程造价咨询业务范围包括仲裁工程结算纠纷",{"key":24,"text":514,"correct":32},"分支机构备案时所持资料有拟在分支机构执业的不少于3 名注册造价工程师的注册证书复印件",{"key":27,"text":516,"correct":22},"分支机构可以以自己名义承接工程造价咨询业务、订立工程造价咨询合同、出具工程造价成果文件",{"key":30,"text":518,"correct":22},"工程造价咨询企业跨省、自治区、直辖市承接工程造价咨询业务的，应当自承接业务之日起20 日内到建设工程所在地的省、自治区、直辖市人民政府建设主管部门备案",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},908588,"下列各项中属于工程造价咨询企业业务范围的是（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":32},"项目经济评价报告的编制和审核",{"key":24,"text":526,"correct":22},"工程纠纷的仲裁",{"key":27,"text":528,"correct":22},"建设项目投资估算的编制和批准",{"key":30,"text":530,"correct":22},"设计方案的比选",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},908590,"政府部门、行业协会、建设单位、施工单位及咨询机构通过协同工作，共同完成工程造价控制任务，属于建设工程全面造价管理中的（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"全过程造价管理",{"key":24,"text":538,"correct":32},"全方位造价管理",{"key":27,"text":540,"correct":22},"全寿命期造价管理",{"key":30,"text":542,"correct":22},"全要素造价管理",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":30,"analysis":33},908592,"下列工作中，属于工程发承包阶段造价管理工作内容的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"处理工程变更",{"key":24,"text":550,"correct":22},"审核工程概算",{"key":27,"text":552,"correct":22},"进行工程计量",{"key":30,"text":554,"correct":32},"编制工程量清单",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},908593,"为了有效地控制建设工程造价，下列（ ）属于工程造价控制的经济措施。",[559,561,563,565],{"key":20,"text":560,"correct":22},"明确项目组织机构",{"key":24,"text":562,"correct":22},"重视设计多方案的比选",{"key":27,"text":564,"correct":32},"动态地比较造价的计划值和实际值",{"key":30,"text":566,"correct":22},"严格审查施工图设计",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},908595,"根据《招标投标法实施条例》，潜在投标人或者其他利害关系人对资格预审文件有异议，应当在提交资格预审申请文件截止时间（ ）日前提出。",[571,572,573,574],{"key":20,"text":193,"correct":32},{"key":24,"text":51,"correct":22},{"key":27,"text":55,"correct":22},{"key":30,"text":468,"correct":22},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":27,"analysis":33},908596,"根据《招标投标法实施条例》，招标文件要求中标人提交履约保证金的，履约保证金不得超过中标合同金额的（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"2%",{"key":24,"text":582,"correct":22},"5%",{"key":27,"text":584,"correct":32},"10%",{"key":30,"text":586,"correct":22},"20%",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},908598,"根据《招标投标实施条例》，对于采用阶段招标的项目。投标人在第一阶段向招标人提交的文件是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":32},"不带报价的技术建议",{"key":24,"text":594,"correct":22},"带报价的技术建议",{"key":27,"text":596,"correct":22},"不带报价的技术方案",{"key":30,"text":598,"correct":22},"带报价的技术方案",[600,603,606,609,612,615],{"id":15,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":15},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]