[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-587-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},587,"建设工程造价管理","建筑工程",0,10,50,2821,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,379,391,403,415,427,439,451,459,469,481,490,502,512,522,534,544,556,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},908479,1,"单选题","(2012年)工业项目财务评价中，估算营业收入的一项重要假设是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","当期商品产量等于当期销售量",true,{"key":24,"text":25,"correct":26},"B","当期商品销售量等于上期产量",false,{"key":28,"text":29,"correct":26},"C","当期商品销售量等于上期末库存量",{"key":31,"text":32,"correct":26},"D","当期商品销售量等于上期销售量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},908480,"(2014年)工程项目经济评价中，财务分析依据的基础数据是根据（ ）确定的。",[38,40,42,44],{"key":20,"text":39,"correct":26},"完全市场竞争下的价格体系",{"key":24,"text":41,"correct":26},"影子价格和影子工资",{"key":28,"text":43,"correct":26},"最优资源配置下的价格体系",{"key":31,"text":45,"correct":22},"现行价格体系",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},908481,"(2015年)工程项目构思策划需要完成的工作内容是( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"论证项目目标及其相互关系",{"key":24,"text":53,"correct":26},"比选项目融资方案",{"key":28,"text":55,"correct":22},"描述项目系统的总体功能",{"key":31,"text":57,"correct":26},"确定项目实施组织",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},908482,"(2015年)进行工程项目经济评价，应遵循( )权衡的基本原则。",[62,64,66,68],{"key":20,"text":63,"correct":26},"费用与效益",{"key":24,"text":65,"correct":22},"收益与风险",{"key":28,"text":67,"correct":26},"静态与动态",{"key":31,"text":69,"correct":26},"效率与公平",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},908483,"(2016年)下列策划内容中，属于工程项目实施策划的是()。",[74,76,78,80],{"key":20,"text":75,"correct":26},"项目规模策划",{"key":24,"text":77,"correct":26},"项目功能策划",{"key":28,"text":79,"correct":26},"项目定义策划",{"key":31,"text":81,"correct":22},"项目目标策划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},908484,"（2017年考题）对有营业收入的非经营性项目进行财务分析时,应以营业收入抵补下列支出；①生产经营耗费；②偿还借款利息；③缴纳流转税；④计提折旧和偿还借款本金，下列排序正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"①②③④",{"key":24,"text":89,"correct":22},"①③②④",{"key":28,"text":91,"correct":26},"③①②④",{"key":31,"text":93,"correct":26},"①③④②",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},908485,"（2017年考题）工程项目经济评价包括财务分析和经济分析,其中财务分析采用的标准和参数是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"市场利率和净收益",{"key":24,"text":101,"correct":26},"社会折现率和净收益",{"key":28,"text":103,"correct":22},"市场利率和净利润",{"key":31,"text":105,"correct":26},"社会折现率和净利润",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},908486,"(2016年)工程项目策划中，需要通过项目定位策划确定工程项目的是()。",[110,112,114,116],{"key":20,"text":111,"correct":26},"系统框架",{"key":24,"text":113,"correct":26},"系统组成",{"key":28,"text":115,"correct":22},"规格和档次",{"key":31,"text":117,"correct":26},"用途和性质",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},908487,"(2018年)针对政府投资的非经营性项目是否采用代建制的策划，属于工程项目的（ ）策划。",[122,124,126,128],{"key":20,"text":123,"correct":26},"目标",{"key":24,"text":125,"correct":26},"构思",{"key":28,"text":127,"correct":22},"组织",{"key":31,"text":129,"correct":26},"控制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},908488,"(2018年)工程项目经济分析中，属于社会与环境分析指标的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"就业结构",{"key":24,"text":137,"correct":22},"收益分配效果",{"key":28,"text":139,"correct":26},"财政收入",{"key":31,"text":141,"correct":26},"三次产业结构",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},908489,"(2018年)下列投资方案现金流量表中,用来计算累计盈余资金、分析投资方案财务生存能力的是（）",[146,148,150,152],{"key":20,"text":147,"correct":26},"投资现金流量表",{"key":24,"text":149,"correct":26},"资本金现金流量表",{"key":28,"text":151,"correct":26},"投资各方现金流里表。",{"key":31,"text":153,"correct":22},"财务计划现金流量表",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},908490,"(2018年)采用全寿命期费用法进行设计方案评价时，首选用的费用指标是（）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"正常生产年份总成本费用",{"key":24,"text":161,"correct":26},"项目累计净现金流量",{"key":28,"text":163,"correct":22},"年度等值费用",{"key":31,"text":165,"correct":26},"运营期费用现值",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},908491,"（2019年）下列工程项目经济评价标准和参数中，用于项目经济分析的是（ ）",[170,172,174,176],{"key":20,"text":171,"correct":22},"社会折现率",{"key":24,"text":173,"correct":26},"财务净现值",{"key":28,"text":175,"correct":26},"净利润",{"key":31,"text":177,"correct":26},"市场利率",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},908492,"（2019年）下列项目策划内容中，属于项目实施过程中策划内容的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"工程项目的定义",{"key":24,"text":185,"correct":26},"项目建设规模策划",{"key":28,"text":187,"correct":22},"项目合同结构策划",{"key":31,"text":189,"correct":26},"总体融资方案策划",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},908496,"(2011年)项目资本金是指()。",[194,196,198,200],{"key":20,"text":195,"correct":26},"项目建设单位的注册资金",{"key":24,"text":197,"correct":26},"项目总投资中的固定资产投资部分",{"key":28,"text":199,"correct":22},"项目总投资中由投资者认缴的出资额",{"key":31,"text":201,"correct":26},"项目开工时已经到位的资金",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},908497,"(2014年)审查工程设计概算时，总概算投资超过批准投资估算（ ）以上的，需重新上报审批。",[206,208,210,212],{"key":20,"text":207,"correct":26},"5%",{"key":24,"text":209,"correct":26},"8%",{"key":28,"text":211,"correct":22},"10%",{"key":31,"text":213,"correct":26},"15%",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},908498,"(2015年)采用分组计算审查法审查施工图预算的特点是( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"可加快审查进度，但审查精度较差",{"key":24,"text":221,"correct":26},"审查质量高，但审查时间较长",{"key":28,"text":223,"correct":26},"应用范围广，但审查工作量大",{"key":31,"text":225,"correct":26},"审查效果好，但应用范围有局限性",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},908499,"(2013年)审查施工图预算，应首先从审查()开始。",[230,232,234,236],{"key":20,"text":231,"correct":26},"定额使用",{"key":24,"text":233,"correct":22},"工程量",{"key":28,"text":235,"correct":26},"设备材料价格",{"key":31,"text":237,"correct":26},"人工、机械使用价格",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},908500,"(2014年)限额设计方式中，采用综合费用法评价设计方案的不足是没有考虑（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"投资方案全寿命期费用",{"key":24,"text":245,"correct":26},"建设周期对投资效益的影响",{"key":28,"text":247,"correct":26},"投资方案投产后的使用费",{"key":31,"text":249,"correct":22},"资金的时间价值",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},908501,"(2014年)工程设计中运用价值工程的目标是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"降低建设工程全寿命期成本",{"key":24,"text":257,"correct":22},"提高建设工程价值",{"key":28,"text":259,"correct":26},"增强建设工程功能",{"key":31,"text":261,"correct":26},"降低建设工程造价",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},908502,"(2016年)限额设计需要在投资额度不变的情况下，实现()的目标。",[266,268,270,272],{"key":20,"text":267,"correct":26},"设计方案和施工组织最优化",{"key":24,"text":269,"correct":26},"总体布局和设计方案最优化",{"key":28,"text":271,"correct":26},"建设规模和投资效益最大化",{"key":31,"text":273,"correct":22},"使用功能和建设规模最大化",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},908503,"(2016年)应用价值工程评价设计方案的首要步骤是进行()。",[278,280,282,284],{"key":20,"text":279,"correct":22},"功能分析",{"key":24,"text":281,"correct":26},"功能评价",{"key":28,"text":283,"correct":26},"成本分析",{"key":31,"text":285,"correct":26},"价值分析",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},908504,"（2019年）下列施工图预算审查方法中，应用范围相对较小的方法是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"全面审查法",{"key":24,"text":293,"correct":26},"重点抽查法",{"key":28,"text":295,"correct":26},"分解对比审查法",{"key":31,"text":297,"correct":22},"标准预算审查法",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},908505,"（2019年）造价控制目标分解的合理步骤（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"投资限额—各专业设计限额一各专业设计人员目标",{"key":24,"text":305,"correct":26},"投资限额—各专业设计人员目标一各专业设计限额",{"key":28,"text":307,"correct":26},"各专业设计限额一各专业设计人员目标一设计概算",{"key":31,"text":309,"correct":26},"各专业设计人员目标一各专业设计限额一设计概算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},908509,"(2013年)下列不同计价方式的合同中，施工承包单位承担风险相对较大的是()。",[314,316,318,320],{"key":20,"text":315,"correct":26},"成本加固定酬金合同",{"key":24,"text":317,"correct":26},"成本加浮动酬金合同",{"key":28,"text":319,"correct":26},"单价合同",{"key":31,"text":321,"correct":22},"总价合同",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},908510,"(2013年)根据《建设项目工程总承包合同（示范文本）》，下列关于预付款支付和抵扣的说法，正确的是()。",[326,328,330,332],{"key":20,"text":327,"correct":26},"合同约定预付款保函的，发包人应在合同生效后支付预付款",{"key":24,"text":329,"correct":22},"合同未约定预付款保函的，发包人应在合同生效后10日内支付预付款",{"key":28,"text":331,"correct":26},"预付款抵扣方式和比例，应在合同通用条款中规定",{"key":31,"text":333,"correct":26},"预付款抵扣完后，发包人无需向承包人退还预付款保函",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},908511,"(2012年)根据《政府采购法》，政府采购的主要方式应是()。",[338,340,342,344],{"key":20,"text":339,"correct":26},"邀请招标",{"key":24,"text":341,"correct":22},"公开招标",{"key":28,"text":343,"correct":26},"竞争性谈判",{"key":31,"text":345,"correct":26},"询价",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},908512,"(2014年)对施工承包单位而言，承担风险大的合同计价方式是（ ）方式。",[350,352,354,356],{"key":20,"text":351,"correct":22},"总价",{"key":24,"text":353,"correct":26},"单价",{"key":28,"text":355,"correct":26},"成本加百分比酬金",{"key":31,"text":357,"correct":26},"成本加固定酬金",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},908513,"(2015年)固定资产投资项目实行资本金制度，以工业产权，非专利技术作价出资的比例不得超过投资项目资本金总额的()。",[362,364,366,368],{"key":20,"text":363,"correct":22},"20%",{"key":24,"text":365,"correct":26},"25%",{"key":28,"text":367,"correct":26},"30%",{"key":31,"text":369,"correct":26},"35%",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},908514,"(2015年)下列合同计价方式中，建设单位最容易控制造价的是( )。",[374,375,376,378],{"key":20,"text":317,"correct":26},{"key":24,"text":319,"correct":26},{"key":28,"text":377,"correct":26},"成本加百分比酬金合同",{"key":31,"text":321,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},908515,"(2016年)根据《标准施工招标文件》，对于施工现场发掘的文物，发包人、监理人和承包人应按要求采取妥善保护措施，由此导致的费用增加应由()承担。",[383,385,387,389],{"key":20,"text":384,"correct":26},"承包人",{"key":24,"text":386,"correct":22},"发包人",{"key":28,"text":388,"correct":26},"承包人和发包人",{"key":31,"text":390,"correct":26},"发包人和监理人",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},908516,"(2016年)招标人在施工招标文件中规定了暂定金额的分项内容和暂定总价款时，投标人可采用的报价策略是()。",[395,397,399,401],{"key":20,"text":396,"correct":22},"适当提高暂定金额分项内容的单价",{"key":24,"text":398,"correct":26},"适当减少暂定金额中的分项T程量",{"key":28,"text":400,"correct":26},"适当降低暂定金额分项内容的单价",{"key":31,"text":402,"correct":26},"适当增加暂定金额中的分项工程量",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},908517,"(2013年)根据《标准施工招标文件》，由发包人提供的材料由于发包人原因发生交易地点变更的，发包人应承担的责任是()。",[407,409,411,413],{"key":20,"text":408,"correct":26},"由此增加的费用、工期延误",{"key":24,"text":410,"correct":26},"工期延误，但不考虑费用和利润的增加",{"key":28,"text":412,"correct":26},"由此增加的费用和合理利润，但不考虑工期延误",{"key":31,"text":414,"correct":22},"由此增加的费用、工期延误，以及承包商合理利润",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},908518,"(2013年)根据《建设项目工程总承包合同（示范文本）》，合同一方收到另一方关于合同价格调整的通知后，应当在收到通知后的()日内以确认或提出修改意见。",[419,421,423,425],{"key":20,"text":420,"correct":26},"10",{"key":24,"text":422,"correct":26},"14",{"key":28,"text":424,"correct":22},"15",{"key":31,"text":426,"correct":26},"18",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},908519,"(2014年)对于大型复杂工程项目，施工标段划分较多时，对建设单位的影响是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"有利于工地现场的布置与协调",{"key":24,"text":434,"correct":22},"有利于得到较为合理的报价",{"key":28,"text":436,"correct":26},"不利于选择有专长的承包单位",{"key":31,"text":438,"correct":26},"不利于设计图纸的分期供应",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},908520,"(2014年)根据《建设项目工程总承包合同（示范文本）》，合同约定由承包人向发包人提交履约保函时，发包人应向承包人提交（ ）保函。",[443,445,447,449],{"key":20,"text":444,"correct":26},"履约",{"key":24,"text":446,"correct":26},"预付款",{"key":28,"text":448,"correct":22},"支付",{"key":31,"text":450,"correct":26},"变更",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},908521,"(2015年)实际工程量与统计工程量可能有较大出入时，建设单位应采用的合同计价方式是( )。",[455,456,457,458],{"key":20,"text":319,"correct":22},{"key":24,"text":315,"correct":26},{"key":28,"text":321,"correct":26},{"key":31,"text":317,"correct":26},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},908522,"(2015年)根据《建设项目工程总承包合同（示范文本）》，发包人经查收到承包人递交的每月付款申请报告之日起的( )以内审查并支付。",[463,465,467,468],{"key":20,"text":464,"correct":26},"30",{"key":24,"text":466,"correct":22},"25",{"key":28,"text":424,"correct":26},{"key":31,"text":420,"correct":26},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":28,"analysis":33},908523,"（2017年考题）根据《标准施工招标文件》合同双方发生争议采用争议评审的,除专用合同条款另有约定外,争议评组应在( )內做出书面评审意见。",[473,475,477,479],{"key":20,"text":474,"correct":26},"收到争议评审申请请报告后28 天",{"key":24,"text":476,"correct":26},"收到被申请人答辩报告后28 天",{"key":28,"text":478,"correct":22},"争议调查会结束后14 天",{"key":31,"text":480,"correct":26},"收到合同双方报告后14 天",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},908524,"（2017年考题）根据《建设项目工程总承包合同（示范文本）》，发包人应在收到承包人按约定提交的最终竣工结算资料的（ ）天内，结清竣工结算款项。",[485,486,487,489],{"key":20,"text":422,"correct":26},{"key":24,"text":424,"correct":26},{"key":28,"text":488,"correct":26},"28",{"key":31,"text":464,"correct":22},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},908525,"（2017年考题）关于《标准施工招标文件》中用合同条款的说法,正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":26},"通用合同条款适用于设计和施工同属于一个承包商的施工招标",{"key":24,"text":497,"correct":22},"通用合同条款同时适用于单价合同和总价合同",{"key":28,"text":499,"correct":26},"通用合同条款只适用于单价合同",{"key":31,"text":501,"correct":26},"通用合同条款只适用于总价合同",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},908526,"（2017年考题）施工图预算审查方法中，审查速度快，但审查精度较差的是（ ）。",[506,507,509,511],{"key":20,"text":297,"correct":26},{"key":24,"text":508,"correct":26},"对比审查法",{"key":28,"text":510,"correct":22},"分组计算审查法",{"key":31,"text":291,"correct":26},{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},908527,"（2017年考题）下列不同计价方式的合同中,建设单位最难控制工程造价的是（ ）。",[516,517,519,521],{"key":20,"text":377,"correct":22},{"key":24,"text":518,"correct":26},"单价全同",{"key":28,"text":520,"correct":26},"目标成本加奖罚合同",{"key":31,"text":321,"correct":26},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},908528,"(2018年)根据《标准施工招标文件》施工合同文件包括下列内容:①已标价工程量清单，②技术标准和要求，③中标通知书，仅就上述三项内容而言，合同文件的优先解释顺序是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"①②③",{"key":24,"text":529,"correct":26},"③①②",{"key":28,"text":531,"correct":26},"②①③",{"key":31,"text":533,"correct":22},"③②①",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},908529,"（2019年）发包人最迟应当在监理人收到进度付款申请单的（ ）天内，将进度应付款支付给承包人。",[538,539,541,542],{"key":20,"text":422,"correct":26},{"key":24,"text":540,"correct":26},"21",{"key":28,"text":488,"correct":22},{"key":31,"text":543,"correct":26},"35",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},908530,"（2019年）合同价格的准确数据只有在（ ）后才能确定。",[548,550,552,554],{"key":20,"text":549,"correct":26},"后续工程不再发生工程变更",{"key":24,"text":551,"correct":22},"承包人完成缺陷责任期工作",{"key":28,"text":553,"correct":26},"工程审计全部完成",{"key":31,"text":555,"correct":26},"竣工结算价支付完成",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},908531,"（2019年）下列不同计价方式的合同中，施工承包单位承担造价控制风险最小的合同是（ ）。",[560,561,562,563],{"key":20,"text":317,"correct":26},{"key":24,"text":319,"correct":26},{"key":28,"text":315,"correct":22},{"key":31,"text":321,"correct":26},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},908532,"(2018年)根据《标准施工招标文件》合同价格是指（ ）",[568,570,572,574],{"key":20,"text":569,"correct":26},"合同协议书中写明的合同总金额",{"key":24,"text":571,"correct":26},"合同协议书中写明的不含暂估价的合同总金额",{"key":28,"text":573,"correct":26},"合同协议书中写明的不含暂列金额的合同总金额",{"key":31,"text":575,"correct":22},"承包人完成全部承包工作后的工程结算价格",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},908538,"(2009年)会计核算法是项目成本核算的一种重要方法，下列属于会计核算法特点的是()。",[580,582,584,586],{"key":20,"text":581,"correct":26},"人为调节的可能性较大",{"key":24,"text":583,"correct":22},"核算范围较大",{"key":28,"text":585,"correct":26},"对核算人员的专业要求不高",{"key":31,"text":587,"correct":26},"核算债权债务等较为困难",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},908539,"(2013年)关于施工成本管理各项工作之间关系的说法，正确的是()。",[592,594,596,598],{"key":20,"text":593,"correct":26},"本计划能对成本控制的实施进行监督",{"key":24,"text":595,"correct":26},"成本核算是成本计划的基础",{"key":28,"text":597,"correct":26},"成本预算是实现成本目标的保证",{"key":31,"text":599,"correct":22},"成本分析为成本考核提供依据",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]