[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910891":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910891,587,2,"多选题","某工程施工至某月底，经偏差分析得到费用偏差(CV)",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","已完工程实际费用节约",false,{"key":16,"text":17,"correct":18},"B","已完工程实际费用>已完工程计划费用",true,{"key":20,"text":21,"correct":14},"C","拟完工程计划费用>已完工程实际费用",{"key":23,"text":24,"correct":14},"D","已完工程实际进度超前",{"key":26,"text":27,"correct":18},"E","拟完工程计划费用>已完工程计划费用","BE","本题考查的是工程费用的动态控制。费用偏差(CV)=已完工程计划费用(BCW2020教材P)-已完工程实际费用(ACW2020教材P)；当CV>0时，说明工程费用节约；当CV 0时，说明工程进度超前；当SV\u003C0时，说明工程进度拖后。2020教材P356-360",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]