[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910877":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910877,587,2,"多选题","施工单位工程索赔产生的原因包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","A：业主方违约",true,{"key":16,"text":17,"correct":18},"B","B：承包方违约",false,{"key":20,"text":21,"correct":14},"C","C：合同缺陷",{"key":23,"text":24,"correct":14},"D","D：工程环境变化",{"key":26,"text":27,"correct":14},"E","E：不可抗力","ACDE","2020版教材P354 本题考查的是工程变更与索赔管理。工程索赔产生的原因包括：业主方违约；合同缺陷；合同变更；工程环境的变化；不可抗力或不利的物质条件。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]