[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910870":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910870,587,2,"多选题","根据《标准施工招标文件》，在招标方式中，邀请招标与公开招标比较，其缺点主要有（）等。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","有可能排除某些在技术上或报价上有竞争力的承包商参与投标",true,{"key":16,"text":17,"correct":14},"B","投标竞争的激烈程度较差",{"key":19,"text":20,"correct":21},"C","招标时间长",false,{"key":23,"text":24,"correct":21},"D","对投标申请者进行评标的工作量大",{"key":26,"text":27,"correct":21},"E","招标费用高","AB","邀请招标方式的缺点是，由于投标竞争的激烈程度较差，有可能会提高中标合同价；也有可能排除某些在技术上或报价上有竞争力的承包商参与投标。2020教材P313-314",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]