[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910837":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910837,587,2,"多选题","分析项目投资的经济效率，具体可以采用的经济费用效益分析指标包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","经济净现值",true,{"key":16,"text":17,"correct":14},"B","经济内部收益率",{"key":19,"text":20,"correct":21},"C","标准折现率",false,{"key":23,"text":24,"correct":14},"D","经济效益费用比",{"key":26,"text":27,"correct":21},"E","社会折现率","ABD","2020版教材P295 计算经济费用效益分析指标，分析项目投资的经济效率，具体可以采用经济净现值(EN2020教材PV)、经济内部收益率(EIRR)、经济效益费用比(RBC)等指标。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]