[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910784":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910784,587,2,"多选题","与传统的融资方式不同，项目融资主要是以（ ）来安排融资。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","项目资产",true,{"key":16,"text":17,"correct":14},"B","预期现金流",{"key":19,"text":20,"correct":21},"C","项目第三方担保",false,{"key":23,"text":24,"correct":21},"D","项目管理的能力",{"key":26,"text":27,"correct":14},"E","预期收益","ABE","2020版教材P246 本题考查的是项目融资的特点和程序。与其他融资过程相比，项目融资主要以项目的资产、预期收益、预期现金流等来安排融资，而不是以项目的投资者或发起人的资信为依据。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]