[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910666":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910666,587,2,"多选题","某工程双代号网络计划如下图所示，工作B的后续工作有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工作D",false,{"key":16,"text":17,"correct":18},"B","工作E",true,{"key":20,"text":21,"correct":18},"C","工作J",{"key":23,"text":24,"correct":18},"D","工作K",{"key":26,"text":27,"correct":18},"E","工作L","BCDE","2020版教材P117 本题考查的是网络图的绘制。工作B的紧后工作有E、G、H、I四项工作，在B工作后面的E、G、H、I、J、K、L工作都是后续工作。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]