[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910603":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910603,587,2,"多选题","根据《建筑工程施工质量验收统一标准》GB 50300，建筑工程包括（ ）等分部工程。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","地基与基础",true,{"key":16,"text":17,"correct":14},"B","主体结构",{"key":19,"text":20,"correct":14},"C","装饰装修",{"key":22,"text":23,"correct":14},"D","屋面",{"key":25,"text":26,"correct":27},"E","土建工程",false,"ABCD","本题考查的是工程项目的组成和分类。根据《建筑工程施工质量验收统一标准》GB 50300，建筑工程包括：地基与基础、主体结构、装饰装修、屋面、给排水及采暖、通风与空调、建筑电气、智能建筑、建筑节能、电梯等分部工程。2020教材P60-62",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]