[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910468":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910468,587,2,"多选题","在价值工程活动中，常用于方案综合评价的定量方法包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","优缺点列举法",false,{"key":16,"text":17,"correct":18},"B","直接评分法",true,{"key":20,"text":21,"correct":18},"C","加权评分法",{"key":23,"text":24,"correct":18},"D","比较价值评分法",{"key":26,"text":27,"correct":18},"E","几何平均值评分法","BCDE","2020版教材页码：P218。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]