[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910365":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910365,587,2,"多选题","(2016年)施工图预算的审查内容有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程量计算的准确性",true,{"key":16,"text":17,"correct":14},"B","定额的准确性",{"key":19,"text":20,"correct":21},"C","施工图纸的准确性",false,{"key":23,"text":24,"correct":14},"D","材料价格确定的合理性",{"key":26,"text":27,"correct":14},"E","相关费用确定的准确性","ABDE","施工图预算的审查内容：工程量的计算;定额的使用;设备材料及人工、机械价格的确定;相关费用的选取和确定。@##",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]