[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910295":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910295,587,2,"多选题","(2009年)在工程经济分析中，影响资金等值的因素有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","资金额度",true,{"key":16,"text":17,"correct":14},"B","资金发生的时间",{"key":19,"text":20,"correct":21},"C","资金支付方式",false,{"key":23,"text":24,"correct":21},"D","货币种类",{"key":26,"text":27,"correct":14},"E","利率的大小","ABE","影响资金等值的因素有三个：资金的多少、资金发生的时间、利率（或折现率） 的大小。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]