[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910256":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},910256,587,2,"多选题","(2015年)实行法人责任制的建设项目，项目总经理的职责有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","负责筹措建设资金",false,{"key":16,"text":17,"correct":14},"B","负责提出项目竣工验收申请报告",{"key":19,"text":20,"correct":21},"C","组织编制项目初步设计文件",true,{"key":23,"text":24,"correct":21},"D","组织工程设计招标工作",{"key":26,"text":27,"correct":21},"E","负责生产准备工作和培训有关人员","CDE","本题考查的是工程项目管理的类型、任务及相关制度。项目经理的职权有：组织编制项目初步设计文件......组织工程设计、施工监理、施工队伍和设备材料采购的招标工作......负责生产准备工作合培训有关人员......AB属于项目董事会的职权。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程造价管理","建筑工程",0]