[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910185":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},910185,587,1,"单选题","（2018年考题）下列施工成本管理方法中,能预测在建工程尚需成本数额,为后续工程施工成本和进度控制指明方向的方法是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工期一成本同步分析法",false,{"key":16,"text":17,"correct":14},"B","价值工程法",{"key":19,"text":20,"correct":21},"C","挣值分析法",true,{"key":23,"text":24,"correct":14},"D","因素分析法","挣值分析法通过计算后续未完工程的计划成本余额，预测其尚需的成本数额，从而为后续工程施工的成本、进度控制及寻求降低成本挖潜途径指明方向。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]