[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910159":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},910159,587,1,"单选题","（2019年考题）根据《标准施工招标文件》，合同价格的准确数据只有在（）后才能确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","后续工程不再发生工程变更",false,{"key":16,"text":17,"correct":18},"B","承包人完成缺陷责任期工作",true,{"key":20,"text":21,"correct":14},"C","工程审计全部完成",{"key":23,"text":24,"correct":14},"D","竣工结算价款已支付完成","本题考查的是标准施工招标文件。合同价格是指承包人按合同约定完成包括缺陷责任期内的全部承包工作后，发包人应付给承包人的金额，包括在履行合同过程中按合同约定进行的变更、价款调整、通过索赔应予补偿的金额。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]