[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-910143":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},910143,587,1,"单选题","（2020年真题）进行建设工程限额设计时，评价和优化设计方案采用的方法是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","技术经济分析法",true,{"key":16,"text":17,"correct":18},"B","工期成本分析法",false,{"key":20,"text":21,"correct":18},"C","全寿命周期成本分析法",{"key":23,"text":24,"correct":18},"D","价值指数分析法","P306-307 设计阶段工程造价管理的主要方法是通过多方案技术经济分析，优化设计方案，选用适宜方法审查工程概预算;同时，通过推行限额设计和标准化设计，有效控制工程造价。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]