[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909935":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},909935,587,1,"单选题","（2014年考题）某工程建设期2年，建设单位在建设期第1年初和第2年初分别从银行借入700万元和500万元，年利率8%，按年计息，建设单位在运营期前3年每年末等额偿还贷款本息，则每年应偿还（）万元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","452.16",false,{"key":16,"text":17,"correct":14},"B","487.37",{"key":19,"text":20,"correct":21},"C","526.36",true,{"key":23,"text":24,"correct":14},"D","760.67","本题考查的是资金等值计算。700+500×（P\u002FF，1，8%）=A×（P\u002FA，3，8%）×（P\u002FF，2，8%），则A=526.36。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]