[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909911":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},909911,587,1,"单选题","（2013年考题）工程网络计划费用优化的目的是为了寻求（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程总成本最低时的最优工期安排",true,{"key":16,"text":17,"correct":18},"B","工期固定条件下的工程费用均衡安排",false,{"key":20,"text":21,"correct":18},"C","工程总成本固定条件下的最短工期安排",{"key":23,"text":24,"correct":18},"D","工期最短条件下的最低工程总成本安排","费用优化是指寻求工程总成本最低时的工期安排。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]