[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909908":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},909908,587,1,"单选题","（2018年考题）某工程网络计划中，工作M有两项紧后工作，开始时间分别为12和13。工作M的开始时间为8，持续时间为3则工作M的自由时差为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",true,{"key":16,"text":17,"correct":18},"B","2",false,{"key":20,"text":21,"correct":18},"C","3",{"key":23,"text":24,"correct":18},"D","4","工作M的结束时间为8+3=11，由于开始时间分别为12和13，13-11=2、12-11=1，所以M工作的自由时差取最小值，即M的自由时差为1。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]