[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909743":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},909743,587,1,"单选题","在建设工程竣工结算审查时，实行总承包的工程，由（ ）编制单位工程竣工结算，在总包单位审查的基础上由建设单位审查。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","总包单位",false,{"key":16,"text":17,"correct":14},"B","建设单位",{"key":19,"text":20,"correct":14},"C","监理单位",{"key":22,"text":23,"correct":24},"D","施工承包单位",true,"2020版教材P361 本题考查的是工程费用的动态监控。工程竣工结算是指施工承包单位按施工合同并经验收合格后，与建设单位进行的最终工程价款结算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]