[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909691":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},909691,587,1,"单选题","（ ）是工程项目成本管理的核心内容，也是工程项目成本管理中不确定因素最多、最复杂、最基础的管理内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","成本预测",false,{"key":16,"text":17,"correct":14},"B","成本核算",{"key":19,"text":20,"correct":14},"C","成本考查",{"key":22,"text":23,"correct":24},"D","成本控制",true,"2020版教材P343 成本控制是工程项目成本管理的核心内容，也是工程项目成本管理中不确定因素最多、最复杂、最基础的管理内容。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]