[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909633":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},909633,587,1,"单选题","如果实际工程量与预计工程量可能有较大出入时，应优先选择（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总价合同",false,{"key":16,"text":17,"correct":18},"B","单价合同",true,{"key":20,"text":21,"correct":14},"C","百分比酬金合同",{"key":23,"text":24,"correct":14},"D","固定酬金合同","2020版教材P316 工程项目的设计深度是选择合同类型的重要因素。如果已完成工程项目的施工图设计，施工图纸和工程量清单详细而明确，则可选择总价合同；如果实际工程量与预计工程量可能有较大出入时，应优先选择单价合同；如果只完成工程项目的初步设计，工程量清单不够明确时，则可选择单价合同或成本加酬金合同。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]