[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909624":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},909624,587,1,"单选题","针对不同计价方式的合同比较，建设单位造价控制最容易的方式是指（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总价合同",true,{"key":16,"text":17,"correct":18},"B","单价合同",false,{"key":20,"text":21,"correct":18},"C","百分比酬金合同",{"key":23,"text":24,"correct":18},"D","固定酬金合同","2020版教材P316 不同计价方式的合同比较。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]