[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909622":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},909622,587,1,"单选题","根据《标准施工招标文件》，由发包人提供的材料由于发包人原因发生交易地点变更的，发包人应承担的责任是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","由此增加的费用，工期延误",false,{"key":16,"text":17,"correct":14},"B","工期延误，但不考虑费用和利润的增加",{"key":19,"text":20,"correct":14},"C","由此增加的费用和合理利润，但不考虑工期延误",{"key":22,"text":23,"correct":24},"D","由此增加的费用，工期延误，以及承包商合理利润",true,"2020版教材P319 发包人提供的材料和工程设备的规格、数量或质量不符合合同要求，或由于发包人原因发生交货日期延误及交货地点变更等情况的，发包人应承担由此增加的费用和（或）工程延误，并向承包人支付合理利润。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]