[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},909594,587,1,"单选题","下列对于投资方案现金流量表的各构成要素描述不正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","总投资是建设投资、建设期利息和流动资金之和",false,{"key":16,"text":17,"correct":14},"B","流动资金不包括运营中需要的临时性营运资金",{"key":19,"text":20,"correct":21},"C","在投资方案寿命期结束时，投入的流动资金不可回收",true,{"key":23,"text":24,"correct":14},"D","修理费允许直接在成本中列支","2020版教材P303 本题考查的是投资方案现金流量表。选项C错误，在投资方案寿命期结束时，投入的流动资金应予以回收。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]