[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909578":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},909578,587,1,"单选题","下列选项中关于财务基准收益率的描述不正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","财务基准收益率是衡量项目财务内部收益率的基准值",false,{"key":16,"text":17,"correct":14},"B","财务基准收益率是项目财务可行性的主要判据",{"key":19,"text":20,"correct":14},"C","财务基准收益率是方案比选的主要判据",{"key":22,"text":23,"correct":24},"D","财务基准收益率是投资者在相应项目上最高可接受的财务收益率",true,"2020版教材P291 本题考查的是工程项目经济评价。财务基准收益率系指工程项目财务评价中对可货币化的项目费用和效益采用折现方法计算财务净现值的基准折现率，是衡量项目财务内部收益率的基准值，是项目财务可行性和方案比选的主要判据。财务基准收益率反映投资者对相应项目占用资金的时间价值的判断，应是投资者在相应项目上最低可接受的财务收益率。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]