[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909552":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},909552,587,1,"单选题","对于市场化运作的经营性项目，其财务效益主要是指（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","营业收入",true,{"key":16,"text":17,"correct":18},"B","成本支出",false,{"key":20,"text":21,"correct":18},"C","政府补贴",{"key":23,"text":24,"correct":18},"D","可供分配利润","2020版教材P291 本题考查的是工程项目经济评价。项目的财务效益是指项目实施后所获得的营业收入。市场化运作的经营性项目，项目目标是通过销售产品或提供服务实现盈利，其财务效益主要是指所获取的营业收入。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]