[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909325":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},909325,587,1,"单选题","某项目各年净现金流量如下表。设基准收益率为10％，则该项目的财务净现值和静态投资回收期分别为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","32.02万元，3.2年",false,{"key":16,"text":17,"correct":14},"B","32.02万元，4.2年",{"key":19,"text":20,"correct":14},"C","29.54万元，4.2年",{"key":22,"text":23,"correct":24},"D","29.54万元，3.2年",true,"本题考查的是经济效果评价的内容及指标体系。财务净现值=-160+50(2020教材P／50，10％，5)=29.54(万元)。2020教材P176-185 静态回收期=（4-1）+10÷50=3.2(年)。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]