[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909143":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},909143,587,1,"单选题","下列建设工程项目目标控制措施中，属于被动控制措施的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","调查分析外部环境条件",false,{"key":16,"text":17,"correct":14},"B","揭示目标实现和计划实施的影响因素",{"key":19,"text":20,"correct":21},"C","及时反馈计划执行的偏差程度",true,{"key":23,"text":24,"correct":14},"D","落实目标控制的任务和管理职能","2020版教材P99 本题考查的是工程项目目标控制的内容、措施和方法。被动控制可以采取以下措施：①应用现代化管理方法和手段跟踪、测试、检查工程实施过程，发现异常情况及时采取纠偏措施；②明确项目管理组织中过程控制人员的职责，发现情况及时采取措施进行处理；③建立有效的信息反馈系统，及时反馈偏离计划目标值的情况，以便及时采取措施予以纠正。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]