[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909131":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},909131,587,1,"单选题","下列工程项目目标控制方法中，可用来找出工程质量主要影响因素的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","直方图法",false,{"key":16,"text":17,"correct":14},"B","鱼刺图法",{"key":19,"text":20,"correct":21},"C","排列图法",true,{"key":23,"text":24,"correct":14},"D","S曲线法","2020版教材P103 本题考查的是工程项目目标控制的内容、措施和方法。排列图又叫主次因素分析图，是用来寻找影响工程(产品)质量主要因素的一种有效工具。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]