[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-909080":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},909080,587,1,"单选题","下列几种工程项目组织管理模式中，工程造价控制难度较大的模式是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","总分包模式",false,{"key":16,"text":17,"correct":14},"B","EPC承包模式",{"key":19,"text":20,"correct":21},"C","平行承包模式",true,{"key":23,"text":24,"correct":14},"D","CM承包模式","2020版教材P78 本题考查的是工程项目发承包模式。平行承包模式工程造价控制难度大。一是由于总合同价不易短期确定，从而影响工程造价控制的实施；二是由于工程招标任务量大，需控制多项合同价格，从而增加了工程造价控制的难度。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]