[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908835":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},908835,587,1,"单选题","工程项目的多次计价有其各不相同的计价依据，每次计价的精确度要求也各不相同，由此决定了计价方法的多样性。下列属于投资估算的方法是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备系数法和生产能力指数估算法",true,{"key":16,"text":17,"correct":18},"B","单价法和实物法",false,{"key":20,"text":21,"correct":18},"C","设备系数法和单价法",{"key":23,"text":24,"correct":18},"D","实物法和生产能力指数估算法","2020版教材P3 本题考查的是工程造价及其计价特征。工程计价的多样性-工程项目的多次计价有其各不相同的计价依据，每次计价的精确度要求也各不相同，由此决定了计价方法的多样性。例如，投资估算方法有设备系数法、生产能力指数估算法等；概预算方法有单价法和实物法等。不同方法有不同的适用条件，计价时应根据具体情况加以选择。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]