[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908595":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},908595,587,1,"单选题","根据《招标投标法实施条例》，潜在投标人或者其他利害关系人对资格预审文件有异议，应当在提交资格预审申请文件截止时间（ ）日前提出。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2",true,{"key":16,"text":17,"correct":18},"B","3",false,{"key":20,"text":21,"correct":18},"C","5",{"key":23,"text":24,"correct":18},"D","10","本题考查的是招标。潜在投标人或者其他利害关系人对资格预审文件有异议，应当在提交资格预审申请文件截止时间 2 日前提出；对招标文件有异议，应当在投标截止时间 10 日前提出。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]