[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908522":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},908522,587,1,"单选题","(2015年)根据《建设项目工程总承包合同（示范文本）》，发包人经查收到承包人递交的每月付款申请报告之日起的( )以内审查并支付。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","30",false,{"key":16,"text":17,"correct":18},"B","25",true,{"key":20,"text":21,"correct":14},"C","15",{"key":23,"text":24,"correct":14},"D","10","本题考查的是施工合同示范文本。工程进度款的支付不论采用哪种方式，发包人应在收到承包人提交的每月付款申请报告或提交的每期付款申请报告之日起的25日内审查并支付。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]