[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908518":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},908518,587,1,"单选题","(2013年)根据《建设项目工程总承包合同（示范文本）》，合同一方收到另一方关于合同价格调整的通知后，应当在收到通知后的()日内以确认或提出修改意见。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","10",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":21},"C","15",true,{"key":23,"text":24,"correct":14},"D","18","该题主要考察的是：合同价格调整。《建设项目工程总承包合同示范文本（试行）》通用条款中规定，一方收到另一方通知后15日内不予确认，也未能提出修改意见的，视为已经同意该项价格的调整。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]