[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908432":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},908432,587,1,"单选题","(2010年)下列关于建筑工程一切险赔偿处理的说法中，正确的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","被保险人的索赔期限，从损失发生之日起，不超过1年",false,{"key":16,"text":17,"correct":14},"B","保险的赔偿必须采用现金支付方式",{"key":19,"text":20,"correct":21},"C","保险人对保险财产造成的损失赔付后，保险金额应相应减少",true,{"key":23,"text":24,"correct":14},"D","被保险人为减少损失而采取措施所发生的全部费用，保险人应予赔偿","选项A，被保险人的索赔期限，从损失发生之日起，不得超过两年；选项B，保险人可有三种赔偿方式，即以现金支付赔款、修复或重置、赔付修理费用；选项D，被保险人为减少损失而采取必要措施所产生的合理费用，保险人可予赔偿，但本项费用与物质损失赔偿金额之和以受损的被保险财产的保险金额为限。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]