[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908364":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},908364,587,1,"单选题","(2011年)在寿命周期成本分析中，对于不直接表现为量化成本的隐性成本，正确的处理方法是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不予计算和评价",false,{"key":16,"text":17,"correct":18},"B","采用一定方法使其转化为可直接计量的成本",true,{"key":20,"text":21,"correct":14},"C","将其作为可直接计量成本的风险看待",{"key":23,"text":24,"correct":14},"D","将其按可直接计量成本的1.5～2倍计算","在工程寿命周期成本中，环境成本和社会成本都是隐性成本，它们不直接表现为量化成本，而必须借助于其他方法转化为可直接计量的成本，这就使得它们比经济成本更难以计量",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]