[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908309":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},908309,587,1,"单选题","(2018年)以产量表示的项目盈亏平衡点与项目投资效果的关系是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","盈亏平衡点越低，项目盈利能力越低",false,{"key":16,"text":17,"correct":18},"B","盈亏平衡点越低，项目抗风险能力越强",true,{"key":20,"text":21,"correct":14},"C","盈亏平衡点越高，项目风险越小",{"key":23,"text":24,"correct":14},"D","盈亏平衡点越高，项目产品单位成本越高","盈亏平衡点反映了项目对市场变化的适应能力和抗风险能力。盈亏平衡点越低，达到此点的盈亏平衡产量和收益或成本也就越少，项目投产后盈利的可能性越大，适应市场变化的能力越强，抗风险能力也越强。盈亏平衡分析虽然能够度量项目风险的大小，但并不能揭示产生项目风险的根源。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]