[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908289":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},908289,587,1,"单选题","(2015年)某投资方案计算期现金流量见下表，该投资方案的静态投资回收期为( )年。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2.143",false,{"key":16,"text":17,"correct":18},"B","3.125",true,{"key":20,"text":21,"correct":14},"C","3.143",{"key":23,"text":24,"correct":14},"D","4.125","本题考查的是经济效果评价的内容及指标体系。4-1+100\u002F800=3.125年。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]