[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908238":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},908238,587,1,"单选题","（2019年）根据《标准设计施工总承包招标文件》(2012年版)，合同文件包括下列内容：①发包人要求，②中标通知书，③承包人建议，仅就上述三项内容而言，合同文件优先解释顺序为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","①②③",false,{"key":16,"text":17,"correct":18},"B","②①③",true,{"key":20,"text":21,"correct":14},"C","③①②",{"key":23,"text":24,"correct":14},"D","③②①","组成合同的各项文件应互相解释、互为说明。除专用合同条款另有约定外，解释合同文件的优先顺序如下：(1) 合同协议书；(2) 中标通知书(3) 投标函及投标函附录；(4) 专用合同条款；(5) 通用合同条款；(5) 技术标准和要求；(7) 图纸；(8) 已标价工程量清单；(9) 其他合同文件。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]