[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908165":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},908165,587,1,"单选题","(2014年)下列工程项目目标控制方法中，可用来掌握产品质量波动情况及质量特征的分布规律，以便对质量状况进行分析判断的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","直方图法",true,{"key":16,"text":17,"correct":18},"B","鱼刺图法",false,{"key":20,"text":21,"correct":18},"C","控制图法",{"key":23,"text":24,"correct":18},"D","S曲线法","该题主要考察的是：工程项目目标控制的主要方法，直方图是以直方图形的高度表示一定范围内数值所发生的频数，据此可掌握产品质量的波动情况，了解质量特征的分布规律，以便对质量状况进行分析判断。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]