[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-908060":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},908060,587,1,"单选题","(2009年)根据《招标投标法》，招标人对已发出的招标文件进行修改的，应当在招标文件要求提交投标文件截止时间至少()日前，通知所有招标文件收受人。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","15",true,{"key":16,"text":17,"correct":18},"B","20",false,{"key":20,"text":21,"correct":18},"C","30",{"key":23,"text":24,"correct":18},"D","60","招标人对已发出的招标文件进行必要的澄清或者修改的， 应当在招标文件要求提交投标文件截止时间至少15日前， 以书面形式通知所有招标文件收受人。该澄清或者修改的内容为招标文件的组成部分。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程造价管理","建筑工程",0]