[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,7,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,417,429,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},905722,1,"单选题","(2013年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854—2013），关于金属结构工程量计算的说法，正确的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","钢吊车梁工程量包括制动梁、制动桁架工程量",true,{"key":24,"text":25,"correct":26},"B","钢管柱按设计图示尺寸以质量计算，扣除加强环、内衬管工程量",false,{"key":28,"text":29,"correct":26},"C","空腹钢柱按设计图示尺寸以长度计算",{"key":31,"text":32,"correct":26},"D","实腹钢柱按图示尺寸的长度计算，牛腿和悬臂梁质量另计","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},905723,"(2014年)某建筑工程挖土方工程量需要通过现场签证核定，已知用斗容量为1.5m3的轮胎式转载机运土500车，则挖土工程量应为（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"501.92m3",{"key":24,"text":41,"correct":22},"576.92m3",{"key":28,"text":43,"correct":26},"623.15m3",{"key":31,"text":45,"correct":26},"750m3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},905724,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于金属结构工程量计算，说法正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"钢管柱牛腿工程量列入其他项目中",{"key":24,"text":53,"correct":22},"钢网架按设计图示尺寸以质量计算",{"key":28,"text":55,"correct":26},"金属结构工程量应扣除孔眼、切边质量",{"key":31,"text":57,"correct":26},"金属结构工程量应增加铆钉、螺栓质量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},905725,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关木结构工程量计算，说法正确的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"木屋架的跨度应与墙或柱的支撑点间的距离计算",{"key":24,"text":65,"correct":26},"木屋架的马尾、折角工程量不予计算",{"key":28,"text":67,"correct":22},"钢木屋架钢拉杆、连接螺栓不单独列项计算",{"key":31,"text":69,"correct":26},"木柱区分不同规格以高度计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},905726,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关楼地面防水防潮工程量计算，说法正确的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"按设计图示尺寸以面积计算",{"key":24,"text":77,"correct":26},"按主墙间净面积计算，搭接和反边部分不计",{"key":28,"text":79,"correct":26},"反边高度≤300mm部分不计算",{"key":31,"text":81,"correct":26},"反边高度＞300mm部分计入楼地面防水",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},905727,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于屋面防水工程量计算，说法正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"斜屋面卷材防水按水平投影面积计算",{"key":24,"text":89,"correct":26},"女儿墙、伸缩缝等处卷材防水弯起部分不计",{"key":28,"text":91,"correct":26},"屋面排水管按设计图示数量以根计算",{"key":31,"text":93,"correct":22},"屋面变形缝按设计图示尺寸以长度计算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},905728,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于地基处理工程量计算正确的为()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"振冲桩（填料）按设计图示处理范围以面积计算",{"key":24,"text":101,"correct":26},"砂石桩按设计图示尺寸以桩长（不包括桩尖）计算",{"key":28,"text":103,"correct":26},"水泥粉煤灰碎石桩按设计图示尺寸以体积计算",{"key":31,"text":105,"correct":22},"深层搅拌桩按设计图示尺寸以桩长计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},905729,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于现浇混凝土板的工程量计算正确的为()。",[110,112,114,116],{"key":20,"text":111,"correct":26},"栏板按设计图示尺寸以面积计算",{"key":24,"text":113,"correct":26},"雨篷按设计外墙中心线外图示体积计算",{"key":28,"text":115,"correct":26},"阳台板按设计外墙中心线外图示面积计算",{"key":31,"text":117,"correct":22},"散水按设计图示尺寸以面积计算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},905730,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，若开挖设计长为20m,宽为6m，深度为0.8的土方工程，在清单中列项应为()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"平整场地",{"key":24,"text":125,"correct":22},"挖沟槽",{"key":28,"text":127,"correct":26},"挖基坑",{"key":31,"text":129,"correct":26},"挖一般土方",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},905731,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于管沟石方工程量计算，说法正确的是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"按设计图示尺寸以管道中心线长度计算",{"key":24,"text":137,"correct":26},"按设计图示尺寸以截面积计算",{"key":28,"text":139,"correct":26},"有管沟设计时按管底以上部分体积计算",{"key":31,"text":141,"correct":26},"无管沟设计时按延长米计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},905732,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，墙面抹灰工程量的计算，说法正确的是()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"墙面抹灰工程量应扣除墙与构件交接处面积",{"key":24,"text":149,"correct":22},"有墙裙的内墙抹灰按主墙间净长乘以墙裙顶至天棚底高度以面积计算",{"key":28,"text":151,"correct":26},"内墙抹灰不单独计算",{"key":31,"text":153,"correct":26},"外墙抹灰按外墙展开面积计算",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},905733,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于涂料工程量的计算，说法正确的是()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"木材构件喷刷防火涂料按设计图示以面积计算",{"key":24,"text":161,"correct":26},"金属构件刷防火涂料按构件单面外围面积计算",{"key":28,"text":163,"correct":26},"空花格、栏杆刷涂料按设计图示尺寸以双面面积计算",{"key":31,"text":165,"correct":26},"线条刷涂料按设计展开面积计算",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},905734,"(2017年)根据《混凝士结构设计规范》(GB50010-2010)。设计使用年限为50年的二b环境类别条件下,混凝土梁柱最外层钢筋保护层最小厚度应为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"25min",{"key":24,"text":173,"correct":22},"35min",{"key":28,"text":175,"correct":26},"40min",{"key":31,"text":177,"correct":26},"50min",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},905735,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013),现浇混凝土墙工程量（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"扣除突出墙面部分体积",{"key":24,"text":185,"correct":26},"不扣除面积为0.33㎡孔洞体积",{"key":28,"text":187,"correct":22},"墙垛并入墙体体积内",{"key":31,"text":189,"correct":26},"扣除预埋铁件体积",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},905736,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT 50854-2013），打桩工程量计算正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"打预制钢筋混凝土方桩，按设计图示尺寸桩长以米计算，送桩工程量另计",{"key":24,"text":197,"correct":22},"打预制钢筋混凝土管桩，按设计图示数量以根计算，截桩头工程量另计",{"key":28,"text":199,"correct":26},"钢管桩按设计图示截面积乘以桩长，以实体积计算",{"key":31,"text":201,"correct":26},"钢板桩按不同板幅以设计长度计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},905737,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT 50854-2013）,地基处理工程量计算正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"换填垫层按设计图示尺寸以体积计算",{"key":24,"text":209,"correct":26},"强夯地基按设计图示处理范围乘以处理深度以体积计算",{"key":28,"text":211,"correct":26},"填料振冲桩以填料体积计算",{"key":31,"text":213,"correct":26},"水泥粉煤碎石桩按设计图示尺寸以体积计算",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},905738,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT50854-2013），某建筑物场地土方工程，设计基础长27m，宽为8m，周边开挖深度均为2m，实际开挖后场内堆土量为570m3，则土方工程量为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"平整场地216m3",{"key":24,"text":221,"correct":26},"沟槽土方655m3",{"key":28,"text":223,"correct":26},"基坑土方528m3",{"key":31,"text":225,"correct":22},"一般土方438m3",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},905739,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013),砌筑工程垫层工程量应( )。",[230,232,234,236],{"key":20,"text":231,"correct":26},"按基坑(槽)底设计图示尺寸以面积计算",{"key":24,"text":233,"correct":26},"按垫层设计宽度乘以中心线长度以面积计算",{"key":28,"text":235,"correct":22},"按设计图示尺寸以体积计算",{"key":31,"text":237,"correct":26},"按实际铺设垫层面积计算",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},905740,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，屋面防水及其他工程量计算正确的是( )。",[242,244,246,248],{"key":20,"text":243,"correct":26},"屋面卷材防水按设计示尺寸以面积计算，防水搭接及附加层用量按设计尺寸计算",{"key":24,"text":245,"correct":26},"屋面排水管设计未标注尺寸,考虑弯折处的增加以长度计算",{"key":28,"text":247,"correct":22},"屋面铁皮天沟按设计图示尺寸以展开面积计算",{"key":31,"text":249,"correct":26},"屋面变形缝按设计尺寸以铺设面积计算",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},905741,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013),砖基础工程量计算正确的是( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"外墙基础断面积(含大放脚)乘以外墙中心线长度以体积计算",{"key":24,"text":257,"correct":26},"內墙基础断面积(大放脚部分扣除)乘以內墙净长线以体积计算",{"key":28,"text":259,"correct":26},"地圈梁部分体积并入基础计算",{"key":31,"text":261,"correct":26},"靠墙暖气沟挑檐体积并入基础计算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},905742,"(2017年)根据《房屋建筑与装饰工程计算规范》(GB50854-2013)，现浇混凝土工程量计算正确的是( )。",[266,268,270,272],{"key":20,"text":267,"correct":26},"雨篷与圈梁连接时其工程量以梁中心为分界线",{"key":24,"text":269,"correct":22},"阳台梁与圈梁连接部分并入圈梁工程量",{"key":28,"text":271,"correct":26},"挑檐板按设计图示水平投影面积计算",{"key":31,"text":273,"correct":26},"空心板按设计图示尺寸以体积计算,空心部分不予扣除",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},905743,"(2017年)根据《混凝士结构设计规范》(GB50010-2010)。设计使用年限为50 年的二b 环境类别条件下,混凝土梁柱最外层钢筋保护层最小厚度应为( )。",[278,280,282,284],{"key":20,"text":279,"correct":26},"25mm",{"key":24,"text":281,"correct":22},"35mm",{"key":28,"text":283,"correct":26},"40mm",{"key":31,"text":285,"correct":26},"50mm",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},905744,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，球型节点钢网架工程量（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"按设计图示尺寸以质量计算",{"key":24,"text":293,"correct":26},"按设讨图示尺寸以榀计算",{"key":28,"text":295,"correct":26},"按设计图示尺寸以铺设水平投影面积计算",{"key":31,"text":297,"correct":26},"按设计图示构件尺寸以总长度计算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},905745,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），石材踢脚线工程量应（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"不予计算",{"key":24,"text":305,"correct":26},"并入地面面层工程量",{"key":28,"text":307,"correct":26},"按设计图示尺寸以长度计算",{"key":31,"text":309,"correct":22},"按设计图示长度乘以高度以面积计算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},905746,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，斜屋面的卷材防水工程量应（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"按设计图示尺寸以水平投影面积计算",{"key":24,"text":317,"correct":22},"按设计图示尺寸以斜面积计算",{"key":28,"text":319,"correct":26},"扣除房上烟囱、风帽底座所面积",{"key":31,"text":321,"correct":26},"扣除屋面小气窗、斜沟所占面积",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},905747,"(2018年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，钢筋工程中钢筋网片工程量（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"不单独计算",{"key":24,"text":329,"correct":26},"按设计图示以数量计算",{"key":28,"text":331,"correct":22},"按设计图是面积乘以单位理论质量计算",{"key":31,"text":333,"correct":26},"按设让图不寸以片计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},905748,"(2018年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，砌筑工程量计算正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"砖地沟按设计图示尺寸以水平投影面积计算",{"key":24,"text":341,"correct":26},"砖地坪按设计图示尺寸以体积计算",{"key":28,"text":343,"correct":26},"石挡土墙按设计图示尺寸以面积计算",{"key":31,"text":345,"correct":22},"石坡道按设计图示尺寸以面积计算",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},905749,"(2018年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，石方工程量计算正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":26},"挖基坑石方按设计图示尺寸基础底面面积乘以埋置深度以体积计算",{"key":24,"text":353,"correct":26},"挖沟槽石方按设计图示以沟槽中心线长度计算",{"key":28,"text":355,"correct":26},"挖一般石方按设计图示开挖范围的水平投影面积计算",{"key":31,"text":357,"correct":22},"挖管沟石方按设计图示以管道中心线长度计算",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},905750,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），门窗工程量计算正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"木门框按设计图示洞口尺寸以面积计算",{"key":24,"text":365,"correct":26},"金属纱窗按设计图示洞口尺寸以面积计算",{"key":28,"text":367,"correct":26},"石材窗台板按设计图示以水平投影面积计算",{"key":31,"text":369,"correct":22},"木门的门锁安装按设计图示数量计算",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},905751,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，天棚抹灰工程量计算正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"扣除检查口和管道所占面积",{"key":24,"text":377,"correct":26},"板式楼梯底面抹灰按水平投影面积计算",{"key":28,"text":379,"correct":26},"扣除间壁墙、垛和柱所面积",{"key":31,"text":381,"correct":22},"锯齿形楼梯底板抹灰按展开面积计算",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},905752,"(2018年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，预制混凝土构件工程量计算正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"过梁按照设计图示尺寸以中心线长度计算",{"key":24,"text":389,"correct":26},"平板按照设计图示以水平投影面积计算",{"key":28,"text":391,"correct":22},"楼梯按照设计图示尺寸以体积计算",{"key":31,"text":393,"correct":26},"井盖板按设计图示尺寸以面积计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},905753,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，钢屋架工程量计算应( )。",[398,400,402,404],{"key":20,"text":399,"correct":22},"不扣除孔眼的质量",{"key":24,"text":401,"correct":26},"按设计用量计算螺栓质量",{"key":28,"text":403,"correct":26},"按设计用量计算铆钉质量",{"key":31,"text":405,"correct":26},"按设计用量计算焊条质量",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},905754,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，钢木屋架工程应（ ）。",[410,412,413,415],{"key":20,"text":411,"correct":22},"按设计图示数量以榀计算",{"key":24,"text":235,"correct":26},{"key":28,"text":414,"correct":26},"按设计图示尺寸以下弦中心线的长度计算",{"key":31,"text":416,"correct":26},"按设计图示尺寸以上部屋面斜面面积计算",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},905755,"(2018年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，钻孔压浆桩的工程量应（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"按设计图示尺寸以桩长计算",{"key":24,"text":424,"correct":26},"按设计图示以注浆体积计算",{"key":28,"text":426,"correct":26},"以钻孔深度（含空桩长度） 计算",{"key":31,"text":428,"correct":26},"按设计图示尺寸以体积让算",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":28,"analysis":33},905756,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，压型钢板楼板工程量应（ ）。",[433,434,436,437],{"key":20,"text":235,"correct":26},{"key":24,"text":435,"correct":26},"扣除所有柱垛及孔洞所占面积",{"key":28,"text":295,"correct":22},{"key":31,"text":291,"correct":26},{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},905758,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GE50854-2013),实心砖墙工程量计算正确的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"凸出墙面的砖垛单独列项",{"key":24,"text":445,"correct":22},"框架梁间內墙按梁间墙体积计算",{"key":28,"text":447,"correct":26},"围墙扣除柱所占体积",{"key":31,"text":449,"correct":26},"平屋顶外墙算至钢筋混凝土板顶面",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},905759,"（2019年）某建筑物砂土场地，设计开挖面积为20m×7m，自然地面标高为-0.2m，设计室外地坪高为-0.3m，设计开挖底面标高为-1.2m。根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），土方工程清单工程量计算应( )。",[454,456,458,460],{"key":20,"text":455,"correct":26},"执行挖一般土方项目，工程量为140m3",{"key":24,"text":457,"correct":26},"执行挖一般土方项目，工程量为126m3",{"key":28,"text":459,"correct":22},"执行挖基坑土方项目，工程量为140m3",{"key":31,"text":461,"correct":26},"执行挖基坑土方项目，工程量为126m3",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},905760,"（2019年）某较为平整的软岩施工场地，设计长度为30m，宽为10m，开挖深度为0.8m，根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），开挖石方清单工程量为( )。",[466,468,470,472],{"key":20,"text":467,"correct":26},"沟槽石方工程量300m2",{"key":24,"text":469,"correct":26},"基坑石方工程量240m3",{"key":28,"text":471,"correct":26},"管沟石方工程量30m",{"key":31,"text":473,"correct":22},"一般石方工程量240m3",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},905761,"（2019年）根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），打预制钢筋混凝土土方桩清单工程量计算正常的是( )。",[478,480,482,484],{"key":20,"text":479,"correct":26},"打桩按打入实体长度（不包括桩尖）计算，以“m”计算",{"key":24,"text":481,"correct":22},"截桩头按设计桩截面乘以桩头长度计算，以“m3”计算",{"key":28,"text":483,"correct":26},"接桩按接头数量计算，以“个”计量",{"key":31,"text":485,"correct":26},"送桩按送入长度计算，以“m”计算",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},905762,"（2019年）根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），砌块墙清单工程量计算正确的是( )。",[490,492,494,496],{"key":20,"text":491,"correct":26},"墙体内拉结筋不另列项计算",{"key":24,"text":493,"correct":26},"压砌钢筋网片不另列项计算",{"key":28,"text":495,"correct":22},"勾缝应列入工作内容",{"key":31,"text":497,"correct":26},"垂直灰缝灌细石混凝土工程量不另列项计算",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},905763,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，现浇混凝土短肢剪力墙工程量计算正确的是( )。",[502,504,506,508],{"key":20,"text":503,"correct":26},"短肢剪力墙按现浇混凝土异形墙列项",{"key":24,"text":505,"correct":26},"各肢截面高度与厚度之比大于5时按现浇混凝土矩形柱列项",{"key":28,"text":507,"correct":26},"各肢截面高度与厚度之比小于4时按现浇混凝土墙列项",{"key":31,"text":509,"correct":22},"各肢截面高度与厚度之比为4.5时，按短肢剪力墙列项",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},905764,"（2019年）根据《房屋建筑与装德江程工程量计算规范》(GB508542013)现浇混凝土构件清单工程量计算正确的是( )。",[514,516,518,520],{"key":20,"text":515,"correct":26},"建筑物散水工程量并入地坪不单独计算",{"key":24,"text":517,"correct":26},"室外台阶工程量并入室外楼梯工程量",{"key":28,"text":519,"correct":22},"压顶工程量可按设计图示尺寸以体积计算，以\"m3\"计量",{"key":31,"text":521,"correct":26},"室外坡道工程量不单独计算",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},905765,"（2019年）关于混凝土保护层厚度正剧说法正确的是( )。",[526,528,530,532],{"key":20,"text":527,"correct":26},"现浇混凝土柱中钢筋的混凝土保护层厚度指纵向主筋至混凝土外表面的距离",{"key":24,"text":529,"correct":26},"基础中钢筋的混凝土保护层厚度应从垫层顶面算起，且不应小于30mm",{"key":28,"text":531,"correct":26},"混凝土保护层厚度与混凝土结构设计使用年限无关",{"key":31,"text":533,"correct":22},"混凝土构件中受力钢筋的保护层厚度不应小于钢筋的公称直径",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},905766,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，钢筋工程量计算正确的是( )。",[538,540,542,544],{"key":20,"text":539,"correct":22},"钢筋机械连接需单独列项计算工程量",{"key":24,"text":541,"correct":26},"设计未标明连接的均按每12m计算1个接头",{"key":28,"text":543,"correct":26},"框架梁贯通钢筋长度不含两端锚固长度",{"key":31,"text":545,"correct":26},"框架梁贯通钢筋长度不含搭接长度",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},905767,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于钢网架清单项，下列说法正确的是( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"钢网架项目特征中应明确探伤和防火要求",{"key":24,"text":553,"correct":26},"钢网架铆钉应按设计图示个数以数量计量",{"key":28,"text":555,"correct":26},"钢网架中螺栓按个数以数量计量",{"key":31,"text":557,"correct":26},"钢网架按设计图示尺寸扣除孔眼部分以质量计量",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},905768,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，金属结构钢管柱清单工程量计算时，不予计量的是( )。",[562,564,566,568],{"key":20,"text":563,"correct":26},"节点板",{"key":24,"text":565,"correct":22},"螺栓",{"key":28,"text":567,"correct":26},"加强环",{"key":31,"text":569,"correct":26},"牛腿",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},905769,"（2019年）根据《屋建筑与装饰工程工程量计算规范》(GB508542013)，压型钢板楼板清单工程量计算应( )。",[574,576,578,580],{"key":20,"text":575,"correct":26},"按设计图示数量计算，以\"t”计量",{"key":24,"text":577,"correct":26},"按设计图示规格计算，以\"块”计量",{"key":28,"text":579,"correct":26},"不扣除孔洞部分",{"key":31,"text":581,"correct":22},"按设计图示以铺设水平影面积计算，以\"m2\"计量",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},905770,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》（GB508542013)，金属门清单工程量计算正确的是( )。",[586,588,590,592],{"key":20,"text":587,"correct":22},"门锁、拉手按金属门五金一并计算，不单列项",{"key":24,"text":589,"correct":26},"按设计图示洞口尺寸以质量计算",{"key":28,"text":591,"correct":26},"按设计门框或扇外围图示尺寸以质量计算",{"key":31,"text":593,"correct":26},"钢质防火和防盗门不按金属门列项",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":31,"analysis":33},905771,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，以\"樘”计的金属橱窗项目特征中必须描述( )。",[598,600,602,604],{"key":20,"text":599,"correct":26},"洞口尺寸",{"key":24,"text":601,"correct":26},"玻璃面积",{"key":28,"text":603,"correct":26},"窗设计数量",{"key":31,"text":605,"correct":22},"框外围展开面积",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},905772,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB508542013)，混凝土构件拆除清单工程量计算正确的是( )。",[610,612,614,616],{"key":20,"text":611,"correct":26},"按拆除构件的虚方工程量计算，以“m3”计量",{"key":24,"text":613,"correct":22},"可按拆除部位的面积计算，“m2”计量",{"key":28,"text":615,"correct":26},"可按拆除构件的运输工程量计算，以“m3”计量",{"key":31,"text":617,"correct":26},"按拆除构件的质量计算，以“t”计量",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]