[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,6,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},905669,1,"单选题","(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，编制工程量清单补充项目时，编制人应报奋案的单位是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","企业技术管理部门",false,{"key":24,"text":25,"correct":22},"B","工程所在地造价管理部门",{"key":27,"text":28,"correct":29},"C","省级或行业工程造价管理机构",true,{"key":31,"text":32,"correct":22},"D","住房和城乡建设部标准定额研究所","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},905670,"(2016年)《建设工程工程量清单计价规范》GB\u002FT50500-2013，关于项目特征，说法正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目特征是编制工程量清单的基础",{"key":24,"text":41,"correct":22},"项目特征是确定工程内容的核心",{"key":27,"text":43,"correct":29},"项目特征是项目自身价值的本质特征",{"key":31,"text":45,"correct":22},"项目特征工程结算的关键依据",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},905671,"(2018年)在我国现行的16G101 系列平法图纸中，楼层框架梁的标注代号为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"WKL",{"key":24,"text":53,"correct":29},"KL",{"key":27,"text":55,"correct":22},"KBL",{"key":31,"text":57,"correct":22},"KZL",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},905672,"(2017年)《国家建筑标准设计图集》（16G101）混凝土结构施工平面图平面整体表示方法其优点在于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"适用于所有地区现浇混凝土结构施工图设计",{"key":24,"text":65,"correct":29},"用图集表示了大量的标准结构详图",{"key":27,"text":67,"correct":22},"适当增加图纸数量，表达更为详细",{"key":31,"text":69,"correct":22},"识图简单一目了然",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},905673,"(2017年)《国家建筑标准设计图集》（16G101）平法施工图中，剪力墙上柱的标注代号为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"JLQZ",{"key":24,"text":77,"correct":22},"JLQSZ",{"key":27,"text":79,"correct":22},"LZ",{"key":31,"text":81,"correct":29},"QZ",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},905674,"(2017年)在《国家建筑标准设计图集》（16G101）梁平法施工图中，KL9（6 A）表示的含义是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"9 跨屋面框架梁，间距为6m，等截面梁",{"key":24,"text":89,"correct":22},"9 跨框支梁，间距为6m，主梁",{"key":27,"text":91,"correct":29},"9 号楼层框架梁，6 跨，一端悬挑",{"key":31,"text":93,"correct":22},"9 号框架梁，6 跨，两端悬挑",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},905675,"(2018年)BIM 技术对工程造价管理的主要作用在于（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程量清单项目划分",{"key":24,"text":101,"correct":29},"工程量计算更准确、高效",{"key":27,"text":103,"correct":22},"综合单价构成更合理",{"key":31,"text":105,"correct":22},"措施项目计算更可行",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},905676,"(2018年)在同一合同段的工程量清单中多个单位工程中具有相同项目特征的项目编码和计量单位时（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目编码不一致，计量单位不一致",{"key":24,"text":113,"correct":22},"项目编码一致，计量单位一致",{"key":27,"text":115,"correct":29},"项目编码不一致，计量单位一致",{"key":31,"text":117,"correct":22},"项目编码一致，计量单位不一致",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},905677,"（2019年）工程量清单特征描述主要说明( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"措施项目的质量安全要求",{"key":24,"text":125,"correct":29},"确定综合单价需考虑的问题",{"key":27,"text":127,"correct":22},"清单项目的计算规则",{"key":31,"text":129,"correct":22},"分部分项项目和措施项目的区别",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},905678,"（2019年）对独立柱基础底板配筋平法标注图中的“T：7C18@100\u002FC10@200”，理解正确的是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"“T”表示底板底部配筋",{"key":24,"text":137,"correct":22},"“7C18@100”表示7根HRB335级钢筋，间距100mm",{"key":27,"text":139,"correct":22},"“C10@200”表示直径为10mm的HRB335级钢筋，间距200mm",{"key":31,"text":141,"correct":29},"“7C18@100”表示7根受力筋的配置情况",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},905682,"(2013年)在计算钢筋工程量时，钢筋的容重(kg\u002Fm3)可取()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"7580",{"key":24,"text":149,"correct":22},"7800",{"key":27,"text":151,"correct":29},"7850",{"key":31,"text":153,"correct":22},"8750",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},905683,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)某建筑物首层建筑面积为2000㎡场地内有部分150mm以内的挖土用6.5T自卸汽车（斗容量4.5m3)运土，弃土共计20车，运距150m，则共平整场地的工程量应为()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"69.2㎡",{"key":24,"text":161,"correct":22},"83.3㎡",{"key":27,"text":163,"correct":22},"90㎡",{"key":31,"text":165,"correct":29},"2000㎡",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},905684,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，当建筑物外墙砖基础垫层底宽为850mm，基槽挖土深度为1600mm，设计中心线长为40000mm，土层为三类土，放坡系数为1：0.33，则此外墙基础人工挖沟槽工程量应为()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"34m3",{"key":24,"text":173,"correct":29},"54.4m3",{"key":27,"text":175,"correct":22},"88.2m3",{"key":31,"text":177,"correct":22},"113.8m3",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},905685,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于地基处理工程量计算的说法，正确的是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"换填垫层按照图示尺寸以面积计算",{"key":24,"text":185,"correct":22},"铺设土工合成材料按图示尺寸以铺设长度计算",{"key":27,"text":187,"correct":22},"强夯地基按图示处理范围和深度以体积计算",{"key":31,"text":189,"correct":29},"振冲密实不填料的按图示处理范围以面积计算",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},905686,"(2013年)据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于基坑与边坡支护工程量计算的说法，正确的是()。",[194,196,198,200],{"key":20,"text":195,"correct":29},"地下连续墙按设计图示尺寸以体积计算",{"key":24,"text":197,"correct":22},"咬合灌注桩按设计图示尺寸以体积计算",{"key":27,"text":199,"correct":22},"喷射混凝土按设计图示以体积计算",{"key":31,"text":201,"correct":22},"预制钢筋混凝土板桩按照设计图示尺寸以体积计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},905687,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于砖砌体工程量计算的说法，正确的是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"空斗墙按设计尺寸墙体外形体积计算，其中门窗洞口立边的实砌部分不计入",{"key":24,"text":209,"correct":22},"空花墙按设计尺寸以墙体外形体积计算，其中空洞部分体积应予以扣除",{"key":27,"text":211,"correct":29},"实心体柱按设计尺寸以柱体积计算，钢筋混凝土梁垫、梁头所占体积应予以扣除",{"key":31,"text":213,"correct":22},"空心砖围墙中心线长乘以高以面积计算",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},905688,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于现浇混凝土梁工程量计算的说法，正确的是()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"圈梁区分不同断面按设计中心线程度计算",{"key":24,"text":221,"correct":22},"过梁工程不单独计算，并入墙体工程量计算",{"key":27,"text":223,"correct":29},"异形梁设计图示尺寸以体积计算",{"key":31,"text":225,"correct":22},"拱形梁按设计拱形轴线长度计算",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},905689,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于现浇混凝土板工程量计算的说法，正确的是()。",[230,232,234,236],{"key":20,"text":231,"correct":29},"空心板按图示尺寸以体积计算，扣除空心所占体积",{"key":24,"text":233,"correct":22},"雨棚板从外墙内侧算至雨棚板结构外边线按面积计算",{"key":27,"text":235,"correct":22},"阳台板按墙体中心线以外部图示面积计算",{"key":31,"text":237,"correct":22},"天沟板按设计图示尺寸中心线长度计算",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},905690,"(2014年)根据《房屋建筑与装饰工程量计算规范》（GB 50584—2013）规定，关于现场混凝土柱工程量的计算，说法正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"有梁板矩形独立柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":24,"text":245,"correct":22},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":27,"text":247,"correct":22},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":31,"text":249,"correct":29},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},905691,"(2014年)已知某现浇钢筋混凝土梁长6400mm，截面为800×1200mm，设计用Φ12mm箍筋，单位理论重量为0.888kg\u002Fm，单根箍筋两个弯钩增加长度共160mm，钢筋保护层厚为25mm，箍筋间距为200mm，则10根梁的箍筋工程量为（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"1.112t",{"key":24,"text":257,"correct":22},"1.117t",{"key":27,"text":259,"correct":29},"1.146t",{"key":31,"text":261,"correct":22},"1.193t",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},905692,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50584—2013）规定，关于预制混凝土的构件工程量计算，说法正确的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":29},"预制组合屋架，按设计图示尺寸以体积计算，不扣除预埋铁件所占体积",{"key":24,"text":269,"correct":22},"预制网架板，按设计图示尺寸以体积计算，不扣除孔洞占体积",{"key":27,"text":271,"correct":22},"预制空心板，按设计图示尺寸以体积计算，不扣除空心板空洞所占体积",{"key":31,"text":273,"correct":22},"预制混凝土楼梯按设计图示尺寸以体积计算，不扣除空心踏步板空洞体积",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},905693,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于厂库房大门工程量计算，说法正确的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"防护铁丝门按设计数量以质量计算",{"key":24,"text":281,"correct":22},"金属格栅门按设计图示门框以面积计算",{"key":27,"text":283,"correct":22},"钢制花饰大门按设计图示数量以质量计算",{"key":31,"text":285,"correct":29},"全钢板大门按设计图示洞口尺寸以面积计算",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},905694,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于金属窗工程量计算，说法正确的是（）",[290,292,294,296],{"key":20,"text":291,"correct":22},"彩板钢窗按设计图示尺寸以框外围展开面积计算",{"key":24,"text":293,"correct":29},"金属纱窗按框的外围尺寸以面积计算",{"key":27,"text":295,"correct":22},"金属百叶窗按框外围尺寸以面积计算",{"key":31,"text":297,"correct":22},"金属橱窗按设计图示洞口尺寸以面积计算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},905695,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关防腐工程量计算，说法正确的是（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"隔离层平面防腐，门洞开口部分按图示面积计入",{"key":24,"text":305,"correct":22},"隔离层立面防腐，门洞口侧壁部分不计算",{"key":27,"text":307,"correct":22},"砌筑沥青浸渍砖，按图示水平投影面积计算",{"key":31,"text":309,"correct":29},"立面防腐涂料，门洞侧壁按展开面积并入墙面积内",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},905696,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关保温、隔热工程量计算，说法正确的是（）。",[314,316,318,320],{"key":20,"text":315,"correct":29},"与天棚相连的梁的保温工程量并入天棚工程量",{"key":24,"text":317,"correct":22},"与墙相连的柱的保温工程量按柱工程量计算",{"key":27,"text":319,"correct":22},"门窗洞口侧壁的保温工程量不计",{"key":31,"text":321,"correct":22},"梁保温工程量按设计图示尺寸以梁的中心线长度计算",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},905697,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于天棚装饰工程量计算，说法正确的是（）。",[326,328,330,332],{"key":20,"text":327,"correct":29},"灯带（槽）按设计图示尺寸以框外围面积计算",{"key":24,"text":329,"correct":22},"灯带（槽）按设计图示尺寸以延长米计算",{"key":27,"text":331,"correct":22},"送风口按设计图示尺寸以结构内边线面积计算",{"key":31,"text":333,"correct":22},"回风口按设计图示尺寸以面积计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},905698,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于土方的项目列项或工程量计算正确的为()。",[338,340,342,344],{"key":20,"text":339,"correct":22},"建筑物场地厚度为350mm的挖土应按平整场地项目列项",{"key":24,"text":341,"correct":22},"挖一般土方的工程量通常按开挖虚方体积计算",{"key":27,"text":343,"correct":29},"基础土方开挖需区分沟槽、基坑和一般土方项目分别列项",{"key":31,"text":345,"correct":22},"冻土开挖工程量需按虚方体积计算",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},905699,"(2015年)某管沟工程，设计管底垫层宽度为2000mm，开挖深度为2.00m，管径为1200mm，工作面宽为400mm，管道中心线长为180m，管沟土方工程量计算正确的为()。",[350,352,354,356],{"key":20,"text":351,"correct":22},"432m3",{"key":24,"text":353,"correct":22},"576m3",{"key":27,"text":355,"correct":29},"720m3",{"key":31,"text":357,"correct":22},"1008m3",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},905700,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于石方的项目列项或工程量计算正确的为()。",[362,364,366,368],{"key":20,"text":363,"correct":29},"山坡凿石按一般石方列项",{"key":24,"text":365,"correct":22},"考虑石方运输，石方体积需折算为虚方体积计算",{"key":27,"text":367,"correct":22},"管沟石方均按一般石方列项",{"key":31,"text":369,"correct":22},"基坑底面积超过120m2的按一般石方列项",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},905701,"(2015年)对某建筑地基设计要求强夯处理，处理范围为40.0m×56.0m，需要铺设400mm厚土工合成材料，并进行机械压实，根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，正确的项目列项或工程量计算是()。",[374,376,378,380],{"key":20,"text":375,"correct":22},"铺设土工合成材料的工程量为896m3",{"key":24,"text":377,"correct":29},"铺设土工合成材料的工程量为2240m2",{"key":27,"text":379,"correct":22},"强夯地基工程量按一般土方项目列项",{"key":31,"text":381,"correct":22},"强夯地基工程量为896m3",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},905702,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于基坑支护工程量计算正确的为()。",[386,388,390,392],{"key":20,"text":387,"correct":22},"地下连续墙按设计图示墙中心线长度以m计算",{"key":24,"text":389,"correct":29},"预制钢筋混凝土板桩按设计图示数量以根计算",{"key":27,"text":391,"correct":22},"钢板桩按设计图示数量以根计算",{"key":31,"text":393,"correct":22},"喷射混凝土按设计图示面积乘以喷层厚度以体积计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},905703,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于桩基础的项目列项或工程量计算正确的为()。",[398,400,402,404],{"key":20,"text":399,"correct":29},"预制钢筋混凝土管桩试验桩应在工程量清单中单独列项",{"key":24,"text":401,"correct":22},"预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目",{"key":27,"text":403,"correct":22},"现场截凿桩头工程量不单独列项，并入桩工程量计算",{"key":31,"text":405,"correct":22},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},905704,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于砖砌体工程量计算说法正确的为()。",[410,412,414,416],{"key":20,"text":411,"correct":22},"砖基础工程量中不含基础砂浆防潮层所占体积",{"key":24,"text":413,"correct":29},"使用同一种材料的基础与墙身以设计室内地面为分界",{"key":27,"text":415,"correct":22},"实心砖墙的工程量中不应计入凸出墙面的砖垛体积",{"key":31,"text":417,"correct":22},"坡屋面有屋架的外墙高由基础顶面算至屋架下弦底面",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},905705,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于石砌体工程量计算正确的为()。",[422,424,426,428],{"key":20,"text":423,"correct":22},"挡土墙按设计图示中心线长度计算",{"key":24,"text":425,"correct":22},"勒脚工程量按设计图示尺寸以延长米计算",{"key":27,"text":427,"correct":22},"石围墙内外地坪标高之差为挡土墙墙高时，墙身与基础以较低地坪标高为界",{"key":31,"text":429,"correct":29},"石护坡工程量按设计图示尺寸以体积计算",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},905706,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于现浇混凝土基础的项目列项或工程量计算正确的为()。",[434,436,438,440],{"key":20,"text":435,"correct":29},"箱式满堂基础中的墙按现浇混凝土墙列项",{"key":24,"text":437,"correct":22},"箱式满堂基础中的梁按满堂基础列项",{"key":27,"text":439,"correct":22},"框架式设备基础的基础部分按现浇混凝土墙列项",{"key":31,"text":441,"correct":22},"框架式设备基础的柱和梁按设备基础列项",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},905707,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于现浇混凝土柱的工程量计算正确的为()。",[446,448,450,452],{"key":20,"text":447,"correct":22},"有梁板的柱按设计图示截面积乘以柱基上表面或楼板上表面至上一层楼板底面之间的高度以体积计算",{"key":24,"text":449,"correct":29},"无梁板的柱按设计图示截面积乘以柱基上表面或楼板上表面至柱帽下表面之间的高度以体积计算",{"key":27,"text":451,"correct":22},"框架柱按柱基上表面至柱顶高度以米计算",{"key":31,"text":453,"correct":22},"构造柱按设计柱高以米计算",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},905708,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于土石方工程量计算，说法正确的是()。",[458,460,462,464],{"key":20,"text":459,"correct":29},"回填土方项目特征应包括填方来源及运距",{"key":24,"text":461,"correct":22},"室内回填应扣除间隔墙所占体积",{"key":27,"text":463,"correct":22},"场地回填按设计回填尺寸以面积计算",{"key":31,"text":465,"correct":22},"基础回填不扣除基础垫层所占体积",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},905709,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于地基处理，说法正确的是()。",[470,472,474,476],{"key":20,"text":471,"correct":22},"铺设木工合成材料按设计长度计算",{"key":24,"text":473,"correct":22},"强夯地基按设计图示处理范围乘以深度以体积计算",{"key":27,"text":475,"correct":29},"填料振冲桩按设计图示尺寸以体积计算",{"key":31,"text":477,"correct":22},"砂石桩按设计数量以根计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},905710,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于砌墙工程量计算，说法正确的是()。",[482,484,486,488],{"key":20,"text":483,"correct":29},"扣除凹进墙内的管槽，暖气槽所占体积",{"key":24,"text":485,"correct":22},"扣除伸人墙内的梁头、板头所占体积",{"key":27,"text":487,"correct":22},"扣除凸出墙面砖垛体积",{"key":31,"text":489,"correct":22},"扣除檩头、垫木所占体积",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},905711,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于现浇混凝土柱高计算，说法正确的是()。",[494,496,498,500],{"key":20,"text":495,"correct":22},"有梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":24,"text":497,"correct":22},"无梁板的柱高自楼板上表面至上一层楼板上表面之间的高度计算",{"key":27,"text":499,"correct":22},"框架梁柱的柱高自柱基上表面至柱顶高度减去各层板厚的高度计算",{"key":31,"text":501,"correct":29},"构造柱按全高计算",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},905712,"(2016年)后张法施工预应力混凝土，孔道长度为12.00m，采用后张混凝土自锚低合金钢筋，钢筋工程量计算的每孔钢筋长度为()m。",[506,508,510,512],{"key":20,"text":507,"correct":22},"12.00",{"key":24,"text":509,"correct":22},"12.15",{"key":27,"text":511,"correct":29},"12.35",{"key":31,"text":513,"correct":22},"13.00",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},905713,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于金属结构工程量计算，说法正确的是()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"钢桁架工程量应增加铆钉质量",{"key":24,"text":521,"correct":22},"钢桁架工程量中应扣除切边部分质量",{"key":27,"text":523,"correct":29},"钢屋架工程量中螺栓质量不另计算",{"key":31,"text":525,"correct":22},"钢屋架工程量应扣除孔眼质量",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},905714,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于门窗工程量计算，说法正确的是()。",[530,532,534,536],{"key":20,"text":531,"correct":22},"木质门带套工程量应按套外围面积计算",{"key":24,"text":533,"correct":22},"门窗工程量计量单位与项目特征描述无关",{"key":27,"text":535,"correct":22},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":31,"text":537,"correct":29},"门窗工程量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},905715,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，屋面防水工程量计算，说法正确的是()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"斜屋面卷材防水，工程量按水平投影面积计算",{"key":24,"text":545,"correct":29},"平屋面涂膜防水，工程量不扣除烟囱所占面积",{"key":27,"text":547,"correct":22},"平屋面女儿墙弯起部分卷材防水不计工程量",{"key":31,"text":549,"correct":22},"平屋面伸缩缝卷材防水不计工程量",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},905716,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于砌块墙高度计算正确的为()。",[554,556,558,560],{"key":20,"text":555,"correct":29},"外墙从基础顶面算至平屋面板底面",{"key":24,"text":557,"correct":22},"女儿墙从屋面板顶面算至压顶顶面",{"key":27,"text":559,"correct":22},"围墙从基础顶面算至混凝土压顶上表面",{"key":31,"text":561,"correct":22},"外山墙从基础顶面算至山墙最高点",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},905717,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于预制混凝土构件工程量计算，说法正确的是()。",[566,568,570,572],{"key":20,"text":567,"correct":29},"如以构件数量作为计量单位，特征描述中必须说明单件体积",{"key":24,"text":569,"correct":22},"异形柱应扣除构件内预埋件所占体积，铁件另计",{"key":27,"text":571,"correct":22},"大型板应扣除单个尺寸≤300mm×300mm的孔洞所占体积",{"key":31,"text":573,"correct":22},"空心板不扣除空洞体积",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},905718,"(2011年)根据《建设工程工程量清单计价规范》(GB50500-2008)，现浇混凝土楼梯的工程量应()。",[578,580,582,584],{"key":20,"text":579,"correct":22},"按设计图示尺寸以面积计算",{"key":24,"text":581,"correct":29},"按设计图示尺寸以水平投影面积计算",{"key":27,"text":583,"correct":22},"扣除宽度不小于300mm的楼梯井",{"key":31,"text":585,"correct":22},"包含伸入墙内部分",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},905719,"(2013年)综合脚手架的项目特征必须要描述()。",[590,592,594,596],{"key":20,"text":591,"correct":22},"建筑面积",{"key":24,"text":593,"correct":29},"檐口高度",{"key":27,"text":595,"correct":22},"场内外材料搬运",{"key":31,"text":597,"correct":22},"脚手架的木质",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},905720,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，当土方开挖底长≤3倍底宽，且底面积≥150m2，开挖尝试为0.8m时，清单项目应列为()。",[602,604,606,608],{"key":20,"text":603,"correct":22},"平整场地",{"key":24,"text":605,"correct":29},"挖一般土方",{"key":27,"text":607,"correct":22},"挖沟槽土方",{"key":31,"text":609,"correct":22},"挖基坑土方",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":31,"analysis":33},905721,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于石砌体-程量计算的说法，正确的是()。",[614,616,618,620],{"key":20,"text":615,"correct":22},"石台阶按设计图示水平投影面积计算",{"key":24,"text":617,"correct":22},"石坡道按水平投影面积乘以平均高度以体积计算",{"key":27,"text":619,"correct":22},"石地沟、明沟按设计力求水平投影面积计算",{"key":31,"text":621,"correct":29},"一般石栏杆按设计图示尺寸以长度计算",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]