[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,48,50,2410,[13,38,53,68,83,98,113,128,142,157,171,185,200,215,229,243,258,273,288,302,316,330,345,359,373,387,401,416,430,445,459,473,488,502,516,530,545,559,573,587,601,616,630,642,656,670,683,697,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},907908,2,"多选题","（2016年真题）关于路基石方施工，说法正确的有（）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","爆破作业时，炮眼的方向和深度和直接影响爆破效果",true,{"key":24,"text":25,"correct":22},"B","选择清方机械应考虑爆破前后机械撤离和再次进入的方便性",{"key":27,"text":28,"correct":29},"C","为了确保炮眼堵塞效果通常用铁棒将堵塞物塞实",false,{"key":31,"text":32,"correct":22},"D","运距较远时通常选择挖掘机配自卸汽车进行清方",{"key":34,"text":35,"correct":22},"E","装药方式的选择与爆破方法和施工要求有关","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},907909,"（2015年真题）路基石方爆破开挖时，选择清方机械主要考虑的因素有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"场内道路条件",{"key":24,"text":45,"correct":22},"进场道路条件",{"key":27,"text":47,"correct":22},"一次爆破石方量",{"key":31,"text":49,"correct":22},"循环周转准备时间",{"key":34,"text":51,"correct":29},"当地气候条件","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},907910,"（2014年真题）压实黏性土壤路基时，可选用的压实机械有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"平地机",{"key":24,"text":60,"correct":29},"光轮压路机",{"key":27,"text":62,"correct":22},"轮胎压路机",{"key":31,"text":64,"correct":22},"振动压路机",{"key":34,"text":66,"correct":22},"夯实机械","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},907911,"（2014年真题）采用移动模架施工桥梁承载结构，其主要优点有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"施工设备少，装置简单，易于操作",{"key":24,"text":75,"correct":22},"无需地面支架，不影响交通",{"key":27,"text":77,"correct":22},"机械化程度高，降低劳动强度",{"key":31,"text":79,"correct":22},"上下部结构可平行作业，缩短工期",{"key":34,"text":81,"correct":22},"模架可周转使用，可在预制场生产","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},907912,"（2013年真题）采用爆破作业方式进行路基石方施工，选择清方机械时应考虑的因素有（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"爆破岩石块度大小",{"key":24,"text":90,"correct":22},"工程要求的生产能力",{"key":27,"text":92,"correct":22},"机械进出现场条件",{"key":31,"text":94,"correct":29},"爆破起爆方式",{"key":34,"text":96,"correct":29},"凿孔机械功率","ABC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},907913,"（2013年真题）混凝土拱涵和石砌拱涵施工应符合的要求有（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"涵洞孔径在3m以上，宜用18～32kg型轻便轨",{"key":24,"text":105,"correct":22},"用混凝土块砌筑拱圈，灰缝宽度宜为20mm",{"key":27,"text":107,"correct":22},"预制拱圈强度达到设计强度的70%时方可安装",{"key":31,"text":109,"correct":29},"拱圈浇灌混凝土不能一次完成时可沿水平分段进行",{"key":34,"text":111,"correct":22},"拆除拱圈支架后，拱圈中砂浆强度达到设计强度的100%时，方可填土。","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},907914,"（2018年真题）软土路基处治的换填法主要有（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"开挖换填法",{"key":24,"text":120,"correct":29},"垂直排水固结法",{"key":27,"text":122,"correct":22},"抛石挤淤法",{"key":31,"text":124,"correct":29},"稳定剂处置法",{"key":34,"text":126,"correct":22},"爆破排淤法","ACE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":36,"analysis":37},907915,"（2018年真题）填石路堤施工的填筑方法主要有（）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"竖向填筑法",{"key":24,"text":135,"correct":22},"分层压实法",{"key":27,"text":137,"correct":29},"振冲置换法",{"key":31,"text":139,"correct":22},"冲击压实法",{"key":34,"text":141,"correct":22},"强力夯实法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},907916,"（2019年真题）关于道路工程压实机械的应用,下列说法正确的有（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"重型光轮压路机主要用于最终压实路基和其他基础层",{"key":24,"text":149,"correct":22},"轮胎压路机适用于压实砾石、碎石路面",{"key":27,"text":151,"correct":22},"新型振动压路机可以压实平、斜面作业面",{"key":31,"text":153,"correct":22},"夯实机械适用于黏性土壤和非黏性土壤的夯实作业",{"key":34,"text":155,"correct":29},"手扶式振动压路机适用于城市主干道的路面压实作业","ABCD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":67,"analysis":37},907917,"（2019年真题）桥梁上部结构转体法施工的主要特点有（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"构件须在预制厂标准加工制作",{"key":24,"text":164,"correct":29},"施工设备和工序较复杂",{"key":27,"text":166,"correct":22},"适宜于大跨及特大桥施工",{"key":31,"text":168,"correct":22},"施工期间对桥下交通影响小",{"key":34,"text":170,"correct":22},"可以跨越通车线路进行施工",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":97,"analysis":37},907918,"（2020年真题）大跨径连续桥梁上部结构悬臂拼装法施工的主要特点有（）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"施工速度较快",{"key":24,"text":178,"correct":22},"可实现桥梁上、下部结构平行作业",{"key":27,"text":180,"correct":22},"一般不影响桥下交通",{"key":31,"text":182,"correct":29},"施工较复杂，穿插施工较频繁",{"key":34,"text":184,"correct":29},"结构整体性较差",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},907919,"（2017年真题）地下连续墙开挖,对确定单元槽段长度因素说法正确的有（）。",[189,191,193,195,197],{"key":20,"text":190,"correct":29},"土层不稳定时,应增大槽段长度",{"key":24,"text":192,"correct":22},"附近有较大地面荷载时,可减少槽段长度",{"key":27,"text":194,"correct":29},"防水要求高时可减少槽段长度",{"key":31,"text":196,"correct":22},"混凝土供应充足时可选用较大槽段",{"key":34,"text":198,"correct":22},"现场起重能力强可选用较大槽段","BDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},907920,"（2017年真题）地下工程喷射混凝土施工时,正确的工艺要求有（）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"喷射作业区段宽以1.5~2.0m为宜",{"key":24,"text":207,"correct":29},"喷射顺序应先喷墙后喷拱",{"key":27,"text":209,"correct":22},"喷管风压随水平输送距离增大而提高",{"key":31,"text":211,"correct":29},"工作风压通常应比水压大",{"key":34,"text":213,"correct":29},"为减少浆液浪费一次喷射厚度不宜太厚","AC",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":52,"analysis":37},907921,"（2016年真题）关于隧道工程喷射混凝土施工，说法正确的有（）。",[219,221,223,225,227],{"key":20,"text":220,"correct":29},"喷射作业混凝土利用率高",{"key":24,"text":222,"correct":22},"喷射作业区段宽度一般以1.5-2.0m为宜",{"key":27,"text":224,"correct":22},"喷射顺序应先墙后拱",{"key":31,"text":226,"correct":22},"喷射工作风压应随风管长度增加而增加",{"key":34,"text":228,"correct":29},"为了确保喷射效果风压通常应大于水压",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":36,"analysis":37},907922,"（2016年真题）关于地下连续墙施工，说法正确的有（）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"机械化程度高",{"key":24,"text":236,"correct":22},"强度大、挡土效果好",{"key":27,"text":238,"correct":29},"必须放坡开挖、施工土方量大",{"key":31,"text":240,"correct":22},"相邻段接头部位容易出现质量问题",{"key":34,"text":242,"correct":22},"作业现场易出现污染",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},907923,"（2015年真题）以下关于早强水泥砂浆锚杆施工说法正确的是（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"快硬水泥卷在使用前需用清水浸泡",{"key":24,"text":250,"correct":29},"早强药包使用时严禁与水接触或受潮",{"key":27,"text":252,"correct":29},"早强药包的主要作用为封堵孔口",{"key":31,"text":254,"correct":29},"快硬水泥卷的直径应比钻孔直径大20mm左右",{"key":34,"text":256,"correct":22},"快硬水泥卷的长度与锚固长度相关","AE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},907924,"（2014年真题）关于隧道工程锚杆施工，说法正确的是（）。",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"水泥砂浆锚杆的砂浆强度等级不低于M20",{"key":24,"text":265,"correct":29},"孔道长度应比锚杆长4~5cm",{"key":27,"text":267,"correct":22},"锚杆一般采用A3钢筋",{"key":31,"text":269,"correct":22},"早强药包内锚头锚杆施工，水泥药卷直径应比钻孔直径小20mm左右",{"key":34,"text":271,"correct":29},"安装管缝式锚杆时，吹孔机风压不得小于0.4MP","ACD",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},907925,"（2013年真题）冻结排桩法深基坑支护技术的主要特点有（）。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"适用于大体积深基坑施工",{"key":24,"text":280,"correct":22},"适用于含水量高的地基基础施工",{"key":27,"text":282,"correct":29},"不宜用于软土地基基础施工",{"key":31,"text":284,"correct":22},"适用于地下水丰富的地基基础施工",{"key":34,"text":286,"correct":29},"适用于工期要求较紧的基础施工","ABD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":127,"analysis":37},907926,"（2018年真题）深基坑土方开挖工艺主要分为（）。",[292,294,296,298,300],{"key":20,"text":293,"correct":22},"放坡挖土",{"key":24,"text":295,"correct":29},"导墙式开挖",{"key":27,"text":297,"correct":22},"中心岛式挖土",{"key":31,"text":299,"correct":29},"护壁式开挖",{"key":34,"text":301,"correct":22},"盆式挖土",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":67,"analysis":37},907927,"（2019年真题）关于路基石方爆破施工,下列说法正确的有（）。",[306,308,310,312,314],{"key":20,"text":307,"correct":29},"光面爆破主要是通过加大装药量来实现",{"key":24,"text":309,"correct":29},"预裂爆破主要是为了增大一次性爆破石方量",{"key":27,"text":311,"correct":22},"微差爆破相邻两药包起爆时差可以为50ms",{"key":31,"text":313,"correct":22},"定向爆破可有效提高石方的堆积效果",{"key":34,"text":315,"correct":22},"洞室爆破可减少清方工程量",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":257,"analysis":37},907928,"（2019年真题）关于隧道工程喷射混凝土支护,下列说法正确的有（）。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"拱形断面隧道开挖后先喷墙后喷拱",{"key":24,"text":323,"correct":29},"拱形断面隧道开挖后直墙部分先从墙顶喷至墙脚",{"key":27,"text":325,"correct":29},"湿喷法施工骨料回弹比干喷法大",{"key":31,"text":327,"correct":29},"干喷法比湿喷法施工粉尘少",{"key":34,"text":329,"correct":22},"封拱区应沿轴线由前向后喷射",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},907929,"（2017年真题）根据《国家建筑标准设计图集》（16G101）平法施工图注写方式，含义正确的有（）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"LZ 表示梁上柱",{"key":24,"text":337,"correct":29},"梁300&times;700Y400&times;300表示梁规格为300&times;700，水平加长腋长、宽分别为400、300",{"key":27,"text":339,"correct":22},"XL300&times;600\u002F400表示根部和端部不同高的悬挑梁",{"key":31,"text":341,"correct":22},"&Phi;10@120（4）\u002F150（2）表示&Phi;10的钢筋加密区间120、4肢箍，非加密区间距150、2肢箍",{"key":34,"text":343,"correct":22},"KL3（2A）400&times;600表示3号楼层框架梁，2跨，一端悬挑","ACDE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":272,"analysis":37},907930,"（2018年真题）工程量清单中关于项目特征描述的重要意义在于（）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"项目特征是区分具体清单项目的依据",{"key":24,"text":352,"correct":29},"项目特征是确定计量单位的重要依据",{"key":27,"text":354,"correct":22},"项目特征是确定综合单价的前提",{"key":31,"text":356,"correct":22},"项目特征是履行合同义务的基础",{"key":34,"text":358,"correct":29},"项目特征是确定工程量计算规则的关键",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":97,"analysis":37},907932,"（2019年真题）工程量计算规范中\"工作内容\"的作用有（）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"给出了具体施工作业内容",{"key":24,"text":366,"correct":22},"体现了施工作业和操作程序",{"key":27,"text":368,"correct":22},"是进行清单项目组价基础",{"key":31,"text":370,"correct":29},"可以按工作内容计算工程成本",{"key":34,"text":372,"correct":29},"反映了清单项目的质量和安全要求",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":97,"analysis":37},907933,"（2020年真题）工程量清单要素中的项目特征，其主要作用体现在（）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"提供确定综合单价和依据",{"key":24,"text":380,"correct":22},"描述特有属性",{"key":27,"text":382,"correct":22},"明确质量要求",{"key":31,"text":384,"correct":29},"明确安全要求",{"key":34,"text":386,"correct":29},"确定措施项目",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":199,"analysis":37},907934,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,石方工程量计算正确的有（）。",[391,393,395,397,399],{"key":20,"text":392,"correct":29},"挖一般石方按设计图示尺寸以建筑物首层面积计算",{"key":24,"text":394,"correct":22},"挖沟槽石方按沟槽设计底面积乘以挖石深度以体积计算",{"key":27,"text":396,"correct":29},"挖基坑石方按基坑底面积乘以自然地面测量标高至设计地坪标高的平均厚度以体积计算",{"key":31,"text":398,"correct":22},"挖管沟石方按设计图示以管道中心线长度以米计算",{"key":34,"text":400,"correct":22},"挖管沟石方按设计图示截面积乘以长度以体积计算",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},907935,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,现浇混凝土构件工程量计算正确的有（）。",[405,407,409,411,413],{"key":20,"text":406,"correct":29},"构造柱按柱断面尺寸乘以全高以体积计算,嵌入墙体部分不计",{"key":24,"text":408,"correct":29},"框架柱工程量按柱基上表面至柱顶以高度计算",{"key":27,"text":410,"correct":22},"粱按设计图示尺寸以体积计算,主粱与次粱交接处按主梁体积计算",{"key":31,"text":412,"correct":29},"混凝土弧形墙按垂直投影面积乘以墙厚以体积计算",{"key":34,"text":414,"correct":22},"挑檐板按设计图示尺寸以体积计算","CE",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":82,"analysis":37},907936,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,措施项目工程量计算正确的是（）。",[420,422,424,426,428],{"key":20,"text":421,"correct":29},"里脚手架按建筑面积计算",{"key":24,"text":423,"correct":22},"满堂脚手架按搭设水平投影面积计算",{"key":27,"text":425,"correct":22},"混凝土墙模板按模板与墙接触面积计算",{"key":31,"text":427,"correct":22},"混凝土构造柱模板按图示外露部分计算模板面积",{"key":34,"text":429,"correct":22},"超高施工增加费包括人工、机械降效，供水加压以及通信联络设备费用",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":444,"analysis":37},907937,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于土方工程量计算与项目列项，说法正确的有（）。",[434,436,438,440,442],{"key":20,"text":435,"correct":29},"建筑物场地挖、填度≤±300mm的挖土应按一般土方项目编码列顶计算",{"key":24,"text":437,"correct":22},"平整场地工程量按设计图示尺寸以建筑物首层建筑面积计算",{"key":27,"text":439,"correct":22},"挖一般土方应按设计图示尺寸以挖掘前天然密实体积计算",{"key":31,"text":441,"correct":29},"挖沟槽土方工程量按沟槽设计图示中心线长度计算",{"key":34,"text":443,"correct":22},"挖基坑土方工程量按设计图示尺寸以体积计算","BCE",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":272,"analysis":37},907938,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于综合脚手架，说法正确的有（）。",[449,451,453,455,457],{"key":20,"text":450,"correct":22},"工程量按建筑面积计算",{"key":24,"text":452,"correct":29},"用于屋顶加层时应说明加层高度",{"key":27,"text":454,"correct":22},"项目特征应说明建筑结构形式和檐口高度",{"key":31,"text":456,"correct":22},"同一建筑物有不同的檐高时，分别按不同檐高列顶",{"key":34,"text":458,"correct":29},"项目特征必须说明脚手架材料",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":444,"analysis":37},907939,"（2016年真题）根据《房屋建筑与装饰工程工程量计算靓范》（GB50854-2013），关于装饰工程量计算，说法正确的有（）。",[463,465,467,469,471],{"key":20,"text":464,"correct":29},"自流坪地面按图示尺寸以面积计算",{"key":24,"text":466,"correct":22},"整体层按设计图示尺寸以面积计算",{"key":27,"text":468,"correct":22},"块料踢脚线可按延长米计算",{"key":31,"text":470,"correct":29},"石材台阶面装饰设计图示以台阶最上踏步外沿以外水平投影面积计算",{"key":34,"text":472,"correct":22},"塑料板楼地面按设计图示尺寸以面积计算",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},907940,"（2015年真题）某坡地建筑基础，设计基底垫层宽为8.0m，基础中心线长为22.0m，开挖深度为1.6m，地基为中等风化软岩，根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于基础石方的项目列项或工程量计算正确的为（）。",[477,479,481,483,485],{"key":20,"text":478,"correct":29},"按挖沟槽石方列项",{"key":24,"text":480,"correct":29},"按挖基坑石方列项",{"key":27,"text":482,"correct":22},"按挖一般石方列项",{"key":31,"text":484,"correct":22},"工程量为286.1m3",{"key":34,"text":486,"correct":29},"工程量为22.0m","CD",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":199,"analysis":37},907941,"（2015年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于现浇混凝土构件工程量计算正确的为（）。",[492,494,496,498,500],{"key":20,"text":493,"correct":29},"电缆沟、地沟按设计图示尺寸以面积计算",{"key":24,"text":495,"correct":22},"台阶按设计图示尺寸以水平投影面积或体积计算",{"key":27,"text":497,"correct":29},"压顶按设计图示尺寸以水平投影面积计算",{"key":31,"text":499,"correct":22},"扶手按设计图示尺寸以体积计算",{"key":34,"text":501,"correct":22},"检查井按设计图示尺寸以体积计算",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":156,"analysis":37},907942,"（2015年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于钢筋保护层或工程量计算正确的是（）。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"Φ20mm钢筋一个半圆弯钩的增加长度为125mm",{"key":24,"text":509,"correct":22},"Φ16mm钢筋—个90°弯钩的增加长度为56mm",{"key":27,"text":511,"correct":22},"Φ20mm钢筋弯起45°，弯起高度为450mm，一侧弯起增加的长度为186.3mm",{"key":31,"text":513,"correct":22},"通常情况下混凝土板的钢筋保护层厚度不小于15mm",{"key":34,"text":515,"correct":29},"箍筋根数：构件长度\u002F箍筋间距+1",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":97,"analysis":37},907943,"（2015年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于金属结构工程量计算正确的为（）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"钢吊车梁工程量应计入制动板、制动梁、制动桁架和车挡的工程量",{"key":24,"text":523,"correct":22},"钢梁工程量中不计算铆钉、螺栓工程量",{"key":27,"text":525,"correct":22},"压型钢板墙板工程量不计算包角、包边",{"key":31,"text":527,"correct":29},"钢板天沟按设计图示尺寸以长度计算",{"key":34,"text":529,"correct":29},"成品雨篷按设计图示尺寸以质量计算",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":544,"analysis":37},907944,"（2014年真题）关于现浇混凝土墙工程量计算，说法正确的有（）。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"一般的短肢剪力墙，按设计图示尺寸以体积计算",{"key":24,"text":537,"correct":22},"直形墙、挡土墙按设计图示尺寸以体积计算",{"key":27,"text":539,"correct":29},"弧形墙按墙厚不同以展开面积计算",{"key":31,"text":541,"correct":29},"墙体工程量应扣除预埋铁件所占体积",{"key":34,"text":543,"correct":29},"墙垛及突出墙面部分的体积不计算","AB",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":112,"analysis":37},907945,"（2014年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50584-2013）规定，以下关于措施项目工程量计算，说法正确的有（）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"垂直运输费用，按施工工期日历天数计算",{"key":24,"text":552,"correct":22},"大型机械设备进出场及安拆，按使用数量计算",{"key":27,"text":554,"correct":22},"施工降水成井，按设计图示尺寸以钻孔深度计算",{"key":31,"text":556,"correct":29},"超高施工增加，按建筑物总建筑面积计算",{"key":34,"text":558,"correct":22},"雨棚混凝土模板及支架，按外挑部分水平投影面积计算",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":272,"analysis":37},907946,"（2013年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于油漆工程量计算的说法，正确的有（）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"金属门油漆按设计图示洞口尺寸以面积计算",{"key":24,"text":566,"correct":29},"封檐板油漆按设计图示尺寸以面积计算",{"key":27,"text":568,"correct":22},"门窗套油漆按设计图示尺寸以面积计算",{"key":31,"text":570,"correct":22},"木隔断油漆按设计图示尺寸以单面外围面积计算",{"key":34,"text":572,"correct":29},"窗帘盒油漆按设计图示尺寸以面积计算",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":36,"analysis":37},907947,"（2013年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），下列脚手架中以㎡为计算单位的有（）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"整体提升架",{"key":24,"text":580,"correct":22},"外装饰吊篮",{"key":27,"text":582,"correct":29},"挑脚手架",{"key":31,"text":584,"correct":22},"悬空脚手架",{"key":34,"text":586,"correct":22},"满堂脚手架",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":487,"analysis":37},907948,"（2018年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），墙面防水工程量计算正确的有（）。",[591,593,595,597,599],{"key":20,"text":592,"correct":29},"墙面涂膜防水按设计图示尺寸以质量计算",{"key":24,"text":594,"correct":29},"墙面砂浆防水按设计图示尺寸以体积计算",{"key":27,"text":596,"correct":22},"墙面变形缝按设计图示尺寸以长度计算",{"key":31,"text":598,"correct":22},"墙面卷材防水按设计图示尺寸以面积计算",{"key":34,"text":600,"correct":29},"墙面防水搭接用量按设计图示尺寸以面积计算",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":615,"analysis":37},907949,"（2018年真题）根据《房屋建筑与装命工程程量计算规范》（GB50854-2013），楼地面装饰工程量计算正确的有（）。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"现浇水磨石楼地面按设计图示尺寸以面积计算",{"key":24,"text":608,"correct":29},"细石混凝土楼地面按设计图示尺寸以体积计算",{"key":27,"text":610,"correct":29},"块料台阶面按设计图示尺寸以展开面积计算",{"key":31,"text":612,"correct":22},"金属踢脚线按延长米计算",{"key":34,"text":614,"correct":22},"石材楼地面按设计图示尺寸以面积计算","ADE",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":82,"analysis":37},907950,"（2018年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），措施项目工程量计算有（）。",[620,622,624,626,628],{"key":20,"text":621,"correct":29},"垂直运输按使用机械设备数量计算",{"key":24,"text":623,"correct":22},"悬空脚手架按搭设的水平投影面积计算",{"key":27,"text":625,"correct":22},"排水、降水工程量，按排水、降水日历天数计算",{"key":31,"text":627,"correct":22},"整体提升架按所服务对象的垂直投影面积计算",{"key":34,"text":629,"correct":22},"超高施工增加按建筑物超高部分的建筑面积计算",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":641,"analysis":37},907951,"（2014年真题）某工程石方清单为暂估项目，施工过程中需要通过现场签证确认实际完成工作量，挖方全部外运。已知开挖范围为底长25m，底宽9m，使用斗容量为10m3的汽车平装外运55车，则关于石方清单列项和工程量，说法正确的有（）。",[634,635,636,637,639],{"key":20,"text":482,"correct":22},{"key":24,"text":478,"correct":29},{"key":27,"text":480,"correct":29},{"key":31,"text":638,"correct":22},"工程量357.14m3",{"key":34,"text":640,"correct":29},"工程量550.00m3","AD",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":36,"analysis":37},907952,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,非标准图设计木屋架项目特征中应描述（）。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"跨度",{"key":24,"text":649,"correct":22},"材料品种及规格",{"key":27,"text":651,"correct":29},"运输和吊装要求",{"key":31,"text":653,"correct":22},"刨光要求",{"key":34,"text":655,"correct":22},"防护材料种类",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":615,"analysis":37},907953,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,屋面及防水清单工程量计算正确的有（）。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"屋面排水管按檐口至设计室外散水上表面垂直距离计算",{"key":24,"text":663,"correct":29},"斜屋面卷材防水按屋面水平投影面积计算",{"key":27,"text":665,"correct":29},"屋面排气管按设计图示以数量计算",{"key":31,"text":667,"correct":22},"屋面檐沟防水按设计图示尺寸以展开面积计算",{"key":34,"text":669,"correct":22},"屋面变形缝按设计图示以长度计算",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":127,"analysis":37},907954,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,现浇混凝土板清单工程量计算正确的有（）。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"压形钢板混凝土楼板扣除钢板所占体积",{"key":24,"text":677,"correct":29},"空心板不扣除空心部分体积",{"key":27,"text":679,"correct":22},"雨蓬反挑檐的体积并入雨篷内一并计算",{"key":31,"text":681,"correct":29},"悬挑板不包括伸出墙外的牛腿体积",{"key":34,"text":414,"correct":22},{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":97,"analysis":37},907955,"（2020年真题）根据《房屋建筑与装饰工程工程量》计算规范（GB50854-2013），土方工程工程量计算正确的为（）。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"建筑场地厚度≤土300m的挖、填、运、找平，均按平整场地计算",{"key":24,"text":690,"correct":22},"设计底宽≤7m，底长>3倍底宽的土方开挖，按挖沟槽土方计算",{"key":27,"text":692,"correct":22},"设计底宽>7m，底长>3倍底宽的土方开挖，按一般土方计算",{"key":31,"text":694,"correct":29},"设计底宽≤7m，底长\u003C3倍底宽的土方开挖，按挖基坑土方计算",{"key":34,"text":696,"correct":29},"土方工程量均按设计尺寸以体积计算",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":127,"analysis":37},907956,"（2020年真题）根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），关于墙面变形缝、防水、防潮工程量计算正确的为（）。",[701,702,704,706,708],{"key":20,"text":598,"correct":22},{"key":24,"text":703,"correct":29},"墙面防水搭接及附加层用量应另行计算",{"key":27,"text":705,"correct":22},"墙面砂浆防水项目中钢丝网不另行计算",{"key":31,"text":707,"correct":29},"墙面变形缝按设计图示立面投影面积计算",{"key":34,"text":709,"correct":22},"墙面变形缝若做双面，按设计图示长度尺寸乘以2计算",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":67,"analysis":37},907957,"（2020年真题）根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），关于柱面抹灰工程量计算正确的为（）。",[714,716,718,720,722],{"key":20,"text":715,"correct":29},"柱面勾缝忽略不计",{"key":24,"text":717,"correct":29},"柱面抹麻刀石灰浆按柱面装饰抹灰编码列项",{"key":27,"text":719,"correct":22},"柱面一般抹灰按设计断面周长乘以高度以面积计算",{"key":31,"text":721,"correct":22},"柱面勾缝按设计断面周长乘以高度以面积计算",{"key":34,"text":723,"correct":22},"柱面砂浆找平按设计断面周长乘以高度以面积计算",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":214,"analysis":37},907959,"（2017年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）,不计算建筑面积的有（）。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"建筑物首层地面有围护设施的露台",{"key":24,"text":731,"correct":29},"兼顾消防与建筑物相同的室外钢楼梯",{"key":27,"text":733,"correct":22},"与建筑物相连的室外台阶",{"key":31,"text":735,"correct":29},"与室內相通的变形缝",{"key":34,"text":737,"correct":29},"形成建筑空间,结构净高1.50m的坡屋顶",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]