[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-44":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":743},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,44,50,2410,[13,38,53,68,83,98,113,128,142,157,172,187,202,217,232,246,260,275,290,304,319,333,348,362,377,391,406,420,434,448,462,477,491,505,520,534,548,562,577,591,605,619,632,646,658,672,686,700,715,729],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},907699,2,"多选题","下列关于卷材防水屋面施工的注意事项说法正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","基层处理剂、接缝胶粘剂、密封材料等与铺贴的卷材性能应不相容",false,{"key":24,"text":25,"correct":26},"B","卷材在铺贴前应保持干燥",true,{"key":28,"text":29,"correct":26},"C","铺贴卷材前，应根据屋面特征及面积大小，合理划分施工流水段",{"key":31,"text":32,"correct":22},"D","铺贴时天沟等处应直接铺贴防水层",{"key":34,"text":35,"correct":26},"E","铺贴时卷材的接缝应用沥青玛蹄脂赶平压实","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},907700,"下列关于混凝土浇筑的说法，正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"混凝土输送宜采用泵送方式",{"key":24,"text":45,"correct":22},"混凝土浇筑前，应先在底部填以不小于50mm厚与混凝土内砂浆成分相同的水泥砂浆",{"key":28,"text":47,"correct":26},"在浇筑与柱和墙连成整体的梁和板时，应在柱和墙浇筑完毕后停歇1～1．5h，再继续浇筑",{"key":31,"text":49,"correct":26},"粗骨料粒径小于25mm时，自由倾落高度5m时，不需要加设串筒",{"key":34,"text":51,"correct":22},"有主次梁的楼板宜顺着主梁方向浇筑","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},907701,"下列关于钢筋焊接连接，叙述正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"闪光对焊不适宜于预应力钢筋焊接",{"key":24,"text":60,"correct":22},"电阻点焊主要应用于大直径钢筋的交叉焊接",{"key":28,"text":62,"correct":26},"电渣压力焊适宜于斜向钢筋的焊接",{"key":31,"text":64,"correct":26},"气压焊不仅适用于竖向钢筋的连接，也适用于各种方向位置的钢筋连接",{"key":34,"text":66,"correct":26},"电弧焊可用于钢筋和钢板的焊接","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},907702,"下列关于玻璃幕墙说法正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"玻璃幕墙是国内外目前最常用的一种幕墙",{"key":24,"text":75,"correct":22},"玻璃安装时，每块玻璃下部应不少于3块弹性定位垫块",{"key":28,"text":77,"correct":26},"弹线工作以建筑物轴线为准，依据设计要求先将骨架位置弹到主体结构上，以确定竖向杆件位置",{"key":31,"text":79,"correct":26},"玻璃幕墙与主体结构连接的钢构件一般采用三维可调连接件",{"key":34,"text":81,"correct":26},"立柱先与连接件连接，连接件再与主体结构预埋件连接并调整、固定","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},907703,"下列对于屋面保温工程的描述正确的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"板状材料保温层采用干铺法施工时，相邻板块应错缝拼接",{"key":24,"text":90,"correct":26},"纤维材料保温层施工时，应避免重压，并应采取防潮措施",{"key":28,"text":92,"correct":26},"在浇筑泡沫混凝土时，泵送时应采取低压泵送",{"key":31,"text":94,"correct":26},"当设计有隔汽层时，先施工隔汽层，然后再施工保温层",{"key":34,"text":96,"correct":22},"泡沫混凝土应分层浇筑，一次浇筑厚度不宜超过300mm","ABCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},907704,"屋面防水工程中，关于涂膜防水层的说法错误的是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"胎体增强材料宜采用无纺布或化纤无纺布",{"key":24,"text":105,"correct":26},"胎体增强材料长边搭接宽度不应小于70mm",{"key":28,"text":107,"correct":26},"胎体增强材料短边搭接宽度不应小于50mm",{"key":31,"text":109,"correct":26},"上下层胎体增强材料应相互垂直铺设",{"key":34,"text":111,"correct":22},"上下层胎体增强材料的长边搭接缝应错开，且不得小于幅宽的1／3","BCD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},907705,"为了保证填土工程的质量，不可选用的土料有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"硫酸盐含量小于5％的土",{"key":24,"text":120,"correct":26},"硫酸盐含量大于5％的土",{"key":28,"text":122,"correct":22},"碎石类土、砂土、爆破石渣",{"key":31,"text":124,"correct":22},"有机物含量小于8％的土",{"key":34,"text":126,"correct":26},"淤泥、冻土、膨胀性土及有机物含量大于8％的土","BE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":112,"analysis":37},907706,"为防止大体积混凝土结构浇筑后产生裂缝，可以采取的相应措施有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"应选用水化热高的水泥",{"key":24,"text":135,"correct":26},"掺入适量的粉煤灰",{"key":28,"text":137,"correct":26},"降低浇筑速度",{"key":31,"text":139,"correct":26},"减小浇筑层厚度",{"key":34,"text":141,"correct":22},"尽可能增加水泥用量",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},907707,"土石方工程中，下列关于填方压实施工要求的说法中不正确的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"填充的边坡坡度越小越好",{"key":24,"text":149,"correct":22},"填方宜采用同类土填筑",{"key":28,"text":151,"correct":22},"基础的结构混凝土达到一定的强度后方可填筑",{"key":31,"text":153,"correct":22},"填方按设计要求预留沉降量",{"key":34,"text":155,"correct":26},"填方由下向上一次完成","AE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},907708,"确定打桩顺序时应考虑（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"桩的直径",{"key":24,"text":164,"correct":26},"桩的密集程度",{"key":28,"text":166,"correct":26},"基础设计标高",{"key":31,"text":168,"correct":26},"土质情况",{"key":34,"text":170,"correct":26},"现场地形条件","BCDE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},907709,"当卷材防水层上有重物覆盖或基层变形较大时，优先采用的施工铺贴方法有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":26},"空铺法",{"key":24,"text":179,"correct":26},"点粘法",{"key":28,"text":181,"correct":22},"满粘法",{"key":31,"text":183,"correct":26},"条粘法",{"key":34,"text":185,"correct":26},"机械固定法","ABDE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},907710,"地下防水施工中，外贴法施工卷材防水层的主要特点有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"施工占地面积较小",{"key":24,"text":194,"correct":26},"底板与墙身接头处卷材易受损",{"key":28,"text":196,"correct":22},"结构不均匀沉降对防水层影响大",{"key":31,"text":198,"correct":26},"可及时进行漏水试验，修补方便",{"key":34,"text":200,"correct":26},"施工工期较长","BDE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":216,"analysis":37},907711,"钢筋的连接方法有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":26},"焊接连接",{"key":24,"text":209,"correct":26},"绑扎搭接连接",{"key":28,"text":211,"correct":26},"机械连接",{"key":31,"text":213,"correct":22},"化学粘结",{"key":34,"text":215,"correct":22},"铆钉连接","ABC",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":231,"analysis":37},907712,"钢筋机械连接包括（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"套筒挤压连接",{"key":24,"text":224,"correct":26},"螺纹套管连接",{"key":28,"text":226,"correct":22},"焊接",{"key":31,"text":228,"correct":22},"绑扎连接",{"key":34,"text":230,"correct":22},"对接连接","AB",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":112,"analysis":37},907713,"关于混凝土搅拌的说法，正确的有（ ）。",[236,238,240,242,244],{"key":20,"text":237,"correct":22},"轻骨料混凝土搅拌可选用自落式搅拌机",{"key":24,"text":239,"correct":26},"搅拌时间不应小于最小搅拌时问",{"key":28,"text":241,"correct":26},"选择二次投料法搅拌可提高混凝土强度",{"key":31,"text":243,"correct":26},"施工配料的主要依据是混凝土施工配合比",{"key":34,"text":245,"correct":22},"混凝土强度相同时，一次投料法比二次投料法节约水泥",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":156,"analysis":37},907714,"关于基坑土石方工程采用轻型井点降水，说法正确的是（ ）。",[250,252,254,256,258],{"key":20,"text":251,"correct":26},"U形布置不封闭段是为施工机械进出基坑留的开口",{"key":24,"text":253,"correct":22},"双排井点管适用于宽度小于6m的基坑",{"key":28,"text":255,"correct":22},"单排井点管应布置在基坑的地下水下游一侧",{"key":31,"text":257,"correct":22},"施工机械不能经U形布置的开口端进出基坑",{"key":34,"text":259,"correct":26},"环形布置适合于大面积基坑",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},907715,"关于施工缝留置，下面说法正确的是（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"无论梁板式结构还是无梁楼盖结构，柱子的施工缝位置在基础顶面均宜留置",{"key":24,"text":267,"correct":22},"单向板的施工缝位置应留置在平行于板长边的任何位置",{"key":28,"text":269,"correct":22},"有主次梁楼盖的施工缝浇筑应顺着主梁方向",{"key":31,"text":271,"correct":26},"有主次梁楼盖的施工缝留在次梁跨度的中间1／3跨度范围内",{"key":34,"text":273,"correct":26},"楼梯的施工缝位置应留置在楼梯段跨度端部1／3长度范围内","ADE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":289,"analysis":37},907716,"关于柱的吊装，以下说法正确的有（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":26},"一般中、小型柱吊装时要绑扎一点",{"key":24,"text":282,"correct":22},"旋转法起吊时柱所受震动较大",{"key":28,"text":284,"correct":22},"滑行法起吊时柱子不受震动",{"key":31,"text":286,"correct":26},"一般在起重机场地受限时才采用滑行法起吊",{"key":34,"text":288,"correct":22},"应优先选用滑行法起吊","AD",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":274,"analysis":37},907717,"后张法适宜用于（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":26},"现场生产的大型预应力构件",{"key":24,"text":297,"correct":22},"中小型构件",{"key":28,"text":299,"correct":22},"预应力桥跨结构",{"key":31,"text":301,"correct":26},"特种结构",{"key":34,"text":303,"correct":26},"构筑物",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":318,"analysis":37},907718,"混凝土施工缝正确的留设位置是（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":26},"柱子应留在基础顶面",{"key":24,"text":311,"correct":22},"带牛腿的柱面留在牛腿上面",{"key":28,"text":313,"correct":26},"留在牛腿下面",{"key":31,"text":315,"correct":22},"单向板留在平行于长边的任何位置",{"key":34,"text":317,"correct":26},"单向板留在平行于短边的任何位置","ACE",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":36,"analysis":37},907719,"剪力墙和筒体体系的高层建筑混凝土工程的施工模板通常采用（ ）。",[323,325,327,329,331],{"key":20,"text":324,"correct":22},"台模",{"key":24,"text":326,"correct":26},"大模板",{"key":28,"text":328,"correct":26},"滑升模板",{"key":31,"text":330,"correct":22},"压型钢板永久式模板",{"key":34,"text":332,"correct":26},"爬升模板",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":347,"analysis":37},907720,"静力压桩接桩时，通常采用的方法是（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"桩接柱法",{"key":24,"text":340,"correct":26},"焊接法",{"key":28,"text":342,"correct":22},"整浇法",{"key":31,"text":344,"correct":26},"硫黄胶泥锚接",{"key":34,"text":346,"correct":22},"钢筋绑扎法","BD",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":156,"analysis":37},907721,"关于轻型井点降水施工的说法，正确的有（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":26},"轻型井点一般可采用单排或双排布置",{"key":24,"text":355,"correct":22},"当有土方机械频繁进出基坑时，井点宜采用环形布置",{"key":28,"text":357,"correct":22},"由于轻型井点需埋入地下蓄水层，一般不宜双排布置",{"key":31,"text":359,"correct":22},"槽宽＞6m，且降水深度超过5m时适宜采用单排井点",{"key":34,"text":361,"correct":26},"为了更好地集中排水，井点管应布置在地下水上游一侧",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":376,"analysis":37},907722,"钢筋验收时，对有抗震设防要求的结构，当设计无具体要求时，下列说法正确的有（ ）。",[366,368,370,372,374],{"key":20,"text":367,"correct":22},"钢筋的抗拉强度实测值与屈服强度实测值的比值不应小于1.15",{"key":24,"text":369,"correct":26},"钢筋的屈服强度实测值与屈服强度标准值的比值不应大于1.30",{"key":28,"text":371,"correct":26},"钢筋的最大力下总伸长率不应小于9%",{"key":31,"text":373,"correct":22},"三级抗震等级纵向受力钢筋可采用HPB400",{"key":34,"text":375,"correct":22},"三级抗震等级纵向受力钢筋不可采用HRB335E","BC",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":52,"analysis":37},907723,"土石方工程机械化施工说法正确的有（ ）。",[381,383,385,387,389],{"key":20,"text":382,"correct":26},"土方运距在30~60m,最好采用推土机施工",{"key":24,"text":384,"correct":22},"面积较大的场地平整，推土机台数不宜小于四台",{"key":28,"text":386,"correct":26},"土方运距在200~350时适宜采用铲运机施工",{"key":31,"text":388,"correct":26},"开挖大型基坑时适宜采用拉铲挖掘机",{"key":34,"text":390,"correct":22},"抓铲挖掘机和拉铲挖掘机均不宜用于水下挖土",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":405,"analysis":37},907724,"土方开挖的降水深度约16m，土体渗透系数50m\u002Fd，可采用的降水方式有（ ）。",[395,397,399,401,403],{"key":20,"text":396,"correct":22},"轻型井点降水",{"key":24,"text":398,"correct":22},"喷射井点降水",{"key":28,"text":400,"correct":26},"管井井点降水",{"key":31,"text":402,"correct":26},"深井井点降水",{"key":34,"text":404,"correct":22},"电渗井点降水","CD",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":82,"analysis":37},907725,"构造柱与墙体的连接符合的规定有（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":26},"墙体应砌成马牙槎，马牙槎应先退后进，对称砌筑",{"key":24,"text":413,"correct":22},"拉结钢筋应沿墙高每隔500mm设1φ6",{"key":28,"text":415,"correct":26},"拉结钢筋伸人墙内不宜小于600mm",{"key":31,"text":417,"correct":26},"钢筋的竖向移位不应超过100mm",{"key":34,"text":419,"correct":26},"施工中不得任意弯折拉结钢筋",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":274,"analysis":37},907726,"关于先张法预应力混凝土施工，说法正确的有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":26},"先支设底模再安装骨架，张拉钢筋后再支设侧模",{"key":24,"text":427,"correct":22},"先安装骨架再张拉钢筋然后支设底模和侧模",{"key":28,"text":429,"correct":22},"先支设侧模和骨架，再安装底模后张拉钢筋",{"key":31,"text":431,"correct":26},"混凝土宜采用自然养护和湿热养护",{"key":34,"text":433,"correct":26},"预应力钢筋需待混凝土达到一定的强度值方可放张",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":156,"analysis":37},907727,"关于土桩和灰土桩的说法，正确的有（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":26},"土桩和灰土桩挤密地基是由桩间挤密土和填夯的桩体组成",{"key":24,"text":441,"correct":22},"用于处理地下水位以下，深度5-15m的湿陷性黄土",{"key":28,"text":443,"correct":22},"土桩主要用于提高人工填土地基的承载力",{"key":31,"text":445,"correct":22},"灰木桩主要用于消除湿陷性黄土地基的湿陷性",{"key":34,"text":447,"correct":26},"不宜用于含水量超过25%的人工填土地基",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":97,"analysis":37},907728,"模板及支撑支设时应符合的要求有（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":26},"保证形状、尺寸、位置正确",{"key":24,"text":455,"correct":26},"要有足够的稳定性、刚度和强度",{"key":28,"text":457,"correct":26},"拆装方便，多次周转",{"key":31,"text":459,"correct":26},"接缝严密",{"key":34,"text":461,"correct":22},"不吸水",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":476,"analysis":37},907733,"桥梁承载结构施工方法中，转体施工的主要特点有（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":26},"不影响通航或桥下交通",{"key":24,"text":469,"correct":26},"高空作业少，施工工艺简单",{"key":28,"text":471,"correct":26},"可利用地形，方便预制构件",{"key":31,"text":473,"correct":22},"施工设备种类多，装置复杂",{"key":34,"text":475,"correct":26},"节约木材，节省施工用料","ABCE",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":476,"analysis":37},907734,"采用爆破作业方式进行路基石方施工，选择清方机械时应考虑的因素有（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":26},"爆破岩石块度大小",{"key":24,"text":484,"correct":26},"工期要求的生产能力",{"key":28,"text":486,"correct":26},"爆破岩堆的大小",{"key":31,"text":488,"correct":22},"爆破起爆方式",{"key":34,"text":490,"correct":26},"工程单价",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":171,"analysis":37},907735,"采用移动模架施工桥梁承载结构，其主要优点有（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"施工设备少，装置简单，易于操作",{"key":24,"text":498,"correct":26},"无须地面支架，不影响交通",{"key":28,"text":500,"correct":26},"机械化程度高，降低劳动强度",{"key":31,"text":502,"correct":26},"上下部结构可平行作业，缩短工期",{"key":34,"text":504,"correct":26},"模架可周转使用，可在预制场生产",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":519,"analysis":37},907736,"在道路路堤工程施工中，路堤所用填料应优先选用（ ）。",[509,511,513,515,517],{"key":20,"text":510,"correct":22},"粉性土",{"key":24,"text":512,"correct":22},"重黏土",{"key":28,"text":514,"correct":22},"亚黏土",{"key":31,"text":516,"correct":26},"粗砂",{"key":34,"text":518,"correct":26},"碎石","DE",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":112,"analysis":37},907737,"路基石方爆破开挖时，选择清方机械主要考虑的因素有（ ）。",[524,526,528,530,532],{"key":20,"text":525,"correct":22},"场内道路条件",{"key":24,"text":527,"correct":26},"进场道路条件",{"key":28,"text":529,"correct":26},"一次爆破石方量",{"key":31,"text":531,"correct":26},"循环周转准备时间",{"key":34,"text":533,"correct":22},"当地气候条件",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":112,"analysis":37},907738,"热拌沥青混合料路面的施工过程主要包括（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"沥青表面处治",{"key":24,"text":541,"correct":26},"混合料压实成型",{"key":28,"text":543,"correct":26},"混合料拌制、运输",{"key":31,"text":545,"correct":26},"混合料摊铺",{"key":34,"text":547,"correct":22},"嵌缝料摊铺",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":186,"analysis":37},907739,"关于路基石方施工，说法正确的有（ ）。",[552,554,556,558,560],{"key":20,"text":553,"correct":26},"爆破作业时，炮眼的方向和深度直接影响爆破效果",{"key":24,"text":555,"correct":26},"选择清方机械应考虑爆破时机械撤离和再次进入的方便性",{"key":28,"text":557,"correct":22},"为了确保炮眼堵塞效果通常用铁棒将堵塞物捣实",{"key":31,"text":559,"correct":26},"运距较远时通常选择挖掘机配自卸汽车进行清方",{"key":34,"text":561,"correct":26},"装药方式的选择与爆破方法和施工要求有关",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":576,"analysis":37},907740,"下列有关基底填筑的要求，表述正确有（ ）。",[566,568,570,572,574],{"key":20,"text":567,"correct":26},"基底应在填筑前压实",{"key":24,"text":569,"correct":26},"基底换填时，应分层压实",{"key":28,"text":571,"correct":22},"基底换填时，深度不应小于20cm",{"key":31,"text":573,"correct":22},"高速公路路堤基底的压实度不小于87％",{"key":34,"text":575,"correct":26},"当路堤填土高度小于路床厚度时，基底的压实度不宜小于路床的压实度标准","ABE",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":405,"analysis":37},907741,"道路工程施工中压实黏性土壤路基时，可选用的压实机械有（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"平地机",{"key":24,"text":584,"correct":22},"光轮压路机",{"key":28,"text":586,"correct":26},"轮胎压路机",{"key":31,"text":588,"correct":26},"夯实机械",{"key":34,"text":590,"correct":22},"沥青混凝土摊铺机",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":231,"analysis":37},907742,"关于装配式墩台施工方法应用的说法，正确的有（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":26},"适用于跨越平缓无漂流物的河沟、河滩等桥梁",{"key":24,"text":598,"correct":26},"工地干扰多的地区优先采用",{"key":28,"text":600,"correct":22},"施工场地开阔的地区优先采用",{"key":31,"text":602,"correct":22},"水量供应充足的地区优先采用",{"key":34,"text":604,"correct":22},"砂石供应充足的地区优先采用",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":347,"analysis":37},907743,"混凝土拱涵和石砌拱涵施工应符合的要求有（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"用混凝土块砌筑拱圈，灰缝宽度宜为1cm",{"key":24,"text":612,"correct":26},"涵洞孔径在3m以上，宜用18～32kg型轻便轨",{"key":28,"text":614,"correct":22},"预制拱圈强度达到设计强度的100％时方可安装",{"key":31,"text":616,"correct":26},"拱圈浇灌混凝土不能一次完成时可按基础沉降缝分节进行",{"key":34,"text":618,"correct":22},"拆除拱圈支架后，拱圈中砂浆强度达到设计强度的70％时，方可填土",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":347,"analysis":37},907744,"沥青混凝土路面的初压和终压可选用的压路机械有（ ）。",[623,624,626,628,630],{"key":20,"text":584,"correct":22},{"key":24,"text":625,"correct":26},"钢筒式压路机",{"key":28,"text":627,"correct":22},"振动压路机",{"key":31,"text":629,"correct":26},"关闭振动装置的振动压路机",{"key":34,"text":631,"correct":22},"手扶振动压路机",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":376,"analysis":37},907745,"桥梁承载结构的施工方法中，施工时不影响桥下交通的有（ ）。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"预制安装法",{"key":24,"text":639,"correct":26},"悬臂施工法",{"key":28,"text":641,"correct":26},"转体施工法",{"key":31,"text":643,"correct":22},"顶推施工法",{"key":34,"text":645,"correct":22},"横移施工法",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":657,"analysis":37},907746,"以下材料可以优先采用作为路堤填料的有（ ）。",[650,651,653,654,655],{"key":20,"text":518,"correct":26},{"key":24,"text":652,"correct":26},"砾石",{"key":28,"text":510,"correct":22},{"key":31,"text":516,"correct":26},{"key":34,"text":656,"correct":22},"黏性土","ABD",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":171,"analysis":37},907747,"气动夯管锤施工的特点是（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"适应所有地层",{"key":24,"text":665,"correct":26},"铺管精度高",{"key":28,"text":667,"correct":26},"对地表不隆起不塌陷",{"key":31,"text":669,"correct":26},"必须是钢管",{"key":34,"text":671,"correct":26},"φ500钢管可铺管长为50m",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":36,"analysis":37},907748,"气动夯管锤铺管施工的特点是（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"适于在岩层中铺管",{"key":24,"text":679,"correct":26},"适于在土层中铺管",{"key":28,"text":681,"correct":26},"适于在含卵石的土层中铺管",{"key":31,"text":683,"correct":22},"铺管方向不好掌握",{"key":34,"text":685,"correct":26},"对地表无隆起或沉降",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":405,"analysis":37},907749,"地下管线工程施工时，常用的造价较低，进度较快，非开挖的施工技术有（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"气压室法",{"key":24,"text":693,"correct":22},"冻结法",{"key":28,"text":695,"correct":26},"长距离顶管法",{"key":31,"text":697,"correct":26},"气动夯锤铺管法",{"key":34,"text":699,"correct":22},"逆作法",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":714,"analysis":37},907750,"冻结排桩法深基坑支护技术的主要特点有（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":26},"适用于大体积深基坑施工",{"key":24,"text":707,"correct":22},"适用于含水量少的地基基础施工",{"key":28,"text":709,"correct":26},"适用于软土地基基础施工",{"key":31,"text":711,"correct":22},"适用于地下水含量少的地基基础施工",{"key":34,"text":713,"correct":22},"适用于工期要求较紧的基础施工","AC",{"id":716,"libraryId":5,"type":15,"typeLabel":16,"stem":717,"options":718,"answer":36,"analysis":37},907751,"下列关于隧道工程锚杆施工，说法正确的是（ ）。",[719,721,723,725,727],{"key":20,"text":720,"correct":22},"孔道长度应比锚杆长4～5cm",{"key":24,"text":722,"correct":26},"水泥砂浆锚杆的砂浆强度等级不低于M20",{"key":28,"text":724,"correct":26},"锚杆一般采用HPB300钢筋",{"key":31,"text":726,"correct":22},"早强药包内锚头锚杆施工，药包直径宜较钻孔直径小10mm左右",{"key":34,"text":728,"correct":26},"安装管缝式锚杆时，吹孔机风压不得小于0．4MPa",{"id":730,"libraryId":5,"type":15,"typeLabel":16,"stem":731,"options":732,"answer":186,"analysis":37},907752,"关于地下连续墙施工，说法正确的有（ ）。",[733,735,737,739,741],{"key":20,"text":734,"correct":26},"机械化程度高",{"key":24,"text":736,"correct":26},"强度大、挡土效果好",{"key":28,"text":738,"correct":22},"必须放坡开挖、施工土方量大",{"key":31,"text":740,"correct":26},"相邻段接头部位容易出现质量问题",{"key":34,"text":742,"correct":26},"作业现场易出现污染",[744,748,751,754,757,760],{"id":745,"name":746,"category":7,"favorite":747},1,"领导干部任职前廉政法规知识测试题",92,{"id":749,"name":750,"category":7,"favorite":745},595,"建筑结构与设备",{"id":752,"name":753,"category":7,"favorite":745},715,"招标采购专业知识与法律法规",{"id":755,"name":756,"category":7,"favorite":745},848,"市政方向-通用基础",{"id":758,"name":759,"category":7,"favorite":8},534,"BIM工程师",{"id":761,"name":759,"category":7,"favorite":8},535]