[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,38,50,2410,[13,38,53,67,81,96,111,126,141,156,170,184,199,213,227,242,256,271,285,299,314,328,343,357,371,386,401,410,425,439,454,468,482,496,511,525,539,554,568,583,597,611,626,640,654,668,682,696,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},907371,2,"多选题","（2019年）关于道路工程压实机械的应用，下列说法正确的有( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","重型光轮压路机主要用于最终压实路基和其他基础层",true,{"key":24,"text":25,"correct":22},"B","轮胎压路机适用于压实砾石、碎石路面",{"key":27,"text":28,"correct":29},"C","新型振动压路机可以压实平、斜面作业面",false,{"key":31,"text":32,"correct":22},"D","夯实机械适用于黏性土壤和非黏性土壤的夯实作业",{"key":34,"text":35,"correct":29},"E","手扶式振动压路机适用于城市主干道的路面压实作业","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},907372,"（2019年）桥梁上部结构转体法施工的主要特点有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"构件须在预制厂标准加工制作",{"key":24,"text":45,"correct":29},"施工设备和工序较复杂",{"key":27,"text":47,"correct":22},"适宜于大跨及特大桥施工",{"key":31,"text":49,"correct":22},"施工期间对桥下交通影响小",{"key":34,"text":51,"correct":22},"可以跨越通车线路进行施工","CDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},907373,"（2019年）关于路基石方爆破施工，下列说法正确的有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"光面爆破主要是通过加大装药量来实现",{"key":24,"text":60,"correct":29},"预裂爆破主要是为了增大一次性爆破石方量",{"key":27,"text":62,"correct":22},"微差爆破相邻两药包起爆时差可以为50ms",{"key":31,"text":64,"correct":22},"定向爆破可有效提高石方的堆积效果",{"key":34,"text":66,"correct":22},"洞室爆破可减小清方工程量",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":36,"analysis":37},907375,"(2013年)冻结排桩法深基坑支护技术的主要特点有()。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"适用于大体积深基坑施工",{"key":24,"text":74,"correct":22},"适用于含水量高的地基基础施工",{"key":27,"text":76,"correct":29},"不宜用于软土地基基础施工",{"key":31,"text":78,"correct":22},"适用于地下水丰富的地基基础施工",{"key":34,"text":80,"correct":29},"适用于工期要求较紧的基础施工",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},907376,"(2016年)关于地下连续墙施工，说法正确的有()。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"机械化程度高",{"key":24,"text":88,"correct":22},"强度大，挡土效果好",{"key":27,"text":90,"correct":29},"必须放坡开挖，施工土方量大",{"key":31,"text":92,"correct":22},"相邻段接头部位容易出现质量问题",{"key":34,"text":94,"correct":22},"作业现场容易出现污染","ABDE",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},907377,"(2014年)关于隧道工程锚杆施工，说法正确的是（）。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"水泥砂浆锚杆的砂浆强度等级不低于M20",{"key":24,"text":103,"correct":29},"孔道长度应比锚杆长4~5cm",{"key":27,"text":105,"correct":22},"锚杆一般用HPB300钢筋",{"key":31,"text":107,"correct":22},"早强药包内锚头锚杆施工，水泥药卷直径应比钻孔直径小20mm左右",{"key":34,"text":109,"correct":29},"安装管缝式锚杆时，吹孔机风压不得小于0.4MP","ACD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},907378,"(2015年)以下关于早强水泥砂浆锚杆施工说法正确的是()。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"快硬水泥卷在使用前需用清水浸泡",{"key":24,"text":118,"correct":29},"早强药包使用时严禁与水接触或受潮",{"key":27,"text":120,"correct":29},"早强药包的主要作用为封堵孔口",{"key":31,"text":122,"correct":29},"快硬水泥卷的直径应比钻孔直径大20mm左右",{"key":34,"text":124,"correct":22},"快硬水泥卷的长度与锚固长度相关","AE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},907379,"（2017年）地下连续墙开挖,对确定单元槽段长度因素说法正确的有( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":29},"土层不稳定时,应增大槽段长度",{"key":24,"text":133,"correct":22},"附近有较大地面荷载时,可减少槽段长度",{"key":27,"text":135,"correct":29},"防水要求高时可减少槽段长度",{"key":31,"text":137,"correct":22},"混凝土供应充足时可选用较大槽段",{"key":34,"text":139,"correct":22},"现场起重能力强可选用较大槽段","BDE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},907380,"(2017年)地下工程喷射混凝土施工时，正确的工艺要求有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"喷射作业区段宽以1.5~2.0m 为宜",{"key":24,"text":148,"correct":22},"喷射顺序应先喷墙后喷拱",{"key":27,"text":150,"correct":22},"喷管风压随水平输送距离大而提高",{"key":31,"text":152,"correct":29},"工作风压通常应比水压大",{"key":34,"text":154,"correct":29},"为减少浆液浪费一次喷射厚度不宜太厚","ABC",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":125,"analysis":37},907381,"（2019年）关于隧道工程喷射混凝土支护，下列说法正确的有( )。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"拱形断面隧道开挖后先喷墙后喷拱",{"key":24,"text":163,"correct":29},"拱形断面隧道开挖后直墙部分先从墙顶喷至墙脚",{"key":27,"text":165,"correct":29},"湿喷法施工骨料回弹比干喷法大",{"key":31,"text":167,"correct":29},"干喷法比湿喷法施工粉尘少",{"key":34,"text":169,"correct":22},"封拱区应沿轴线由前向后喷射",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":155,"analysis":37},907383,"(2013年)建设工程工程量清单中，项目特征描述的意义有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"体现对分部分项项目质量的要求",{"key":24,"text":177,"correct":22},"体现履行合同义务的相应要求",{"key":27,"text":179,"correct":22},"为承包人确定综合单价提供依据",{"key":31,"text":181,"correct":29},"对承包人施工组织管理提出要求",{"key":34,"text":183,"correct":29},"对承包人的施工作业提出具体要求",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},907384,"(2017年)根据《国家建筑标准设计图集》(16G101)平法施工图注写方式，含义正确的有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"LZ 表示梁上柱",{"key":24,"text":191,"correct":29},"梁 300&times;700Y400&times;300 表示梁规格为 300&times;700,水平加长腋长、宽分别为 400、300",{"key":27,"text":193,"correct":22},"XL300&times;600\u002F400 表示根部和端部不同高的悬挑梁",{"key":31,"text":195,"correct":22},"&phi;10@120(4)\u002F150(2)表示&phi;10 的钢筋加密区间距 120、4 肢箍,非加密区间距 150\u002F2 肢箍",{"key":34,"text":197,"correct":22},"KL3(2A)400&times;600 表示 3 号楼层框架梁,2 跨,一端悬挑","ACDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":155,"analysis":37},907385,"（2019年）工程量计算规范中\"工作内容\"的作用有( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"给出了具体施工作业内容",{"key":24,"text":206,"correct":22},"体现了施工作业和操作程序",{"key":27,"text":208,"correct":22},"是进行清单项目组价基础",{"key":31,"text":210,"correct":29},"可以按工作内容计算工程成本",{"key":34,"text":212,"correct":29},"反映了清单项目的质量和安全要求",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":110,"analysis":37},907386,"(2018年)工程量清单中关于项目特征描述的重要意义在于（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"项目特征是区分具体清单项目的依据",{"key":24,"text":220,"correct":29},"项目特征是确定计量单位的重要依据",{"key":27,"text":222,"correct":22},"项目特征是确定综合单价的前提",{"key":31,"text":224,"correct":22},"项目特征是履行合同义务的基础",{"key":34,"text":226,"correct":29},"项目特征是确定工程量计算规则的关键",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},907388,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，关于管沟土方工程量计算的说法，正确的有()。",[231,233,235,237,239],{"key":20,"text":232,"correct":29},"按管沟宽乘以深度再乘以管道中心线长度计算",{"key":24,"text":234,"correct":22},"按设计管道中心线长度计算",{"key":27,"text":236,"correct":22},"按设计管底垫层面积乘以深度计算",{"key":31,"text":238,"correct":22},"按管道外径水平投影面积乘以深度计算",{"key":34,"text":240,"correct":29},"按管沟开挖断面乘以管道中心线长度计算","BCD",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":95,"analysis":37},907389,"(2013年)根据《房屋建筑与装饰工程工程量计算规范》(CB50854-2013)，下列脚手架中以m2为计算单位的有()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"整体提升架",{"key":24,"text":249,"correct":22},"外装饰吊篮",{"key":27,"text":251,"correct":29},"挑脚手架",{"key":31,"text":253,"correct":22},"悬空脚手架",{"key":34,"text":255,"correct":22},"满堂脚手架",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},907390,"(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，以下关于措施项目工程量计算，说法正确的有（）",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"垂直运输费用，按施工工期日历天数计算",{"key":24,"text":263,"correct":22},"大型机械设备进出场及安拆，按使用数量计算",{"key":27,"text":265,"correct":22},"施工降水成井，按设计图示尺寸以钻孔深度计算",{"key":31,"text":267,"correct":29},"超高施工增加，按建筑物总建筑面积计算",{"key":34,"text":269,"correct":22},"雨篷混凝土模板及支架，按外挑部分水平投影面积计算","ABCE",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":140,"analysis":37},907391,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于现浇混凝土构件工程量计算正确的为()。",[275,277,279,281,283],{"key":20,"text":276,"correct":29},"电缆沟、地沟按设计图示尺寸以面积计算",{"key":24,"text":278,"correct":22},"台阶按设计图示尺寸以水平投影面积或体积计算",{"key":27,"text":280,"correct":29},"压顶按设计图示尺寸以水平投影面积计算",{"key":31,"text":282,"correct":22},"扶手按设计图示尺寸以体积计算",{"key":34,"text":284,"correct":22},"检查井按设计图示尺寸以体积计算",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":155,"analysis":37},907392,"(2015年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)规定，关于金属结构工程量计算正确的为()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"钢吊车梁工程量应计入制动板、制动梁、制动桁架和车挡的工作量",{"key":24,"text":292,"correct":22},"钢梁工程量中不计算铆钉、螺栓工程量",{"key":27,"text":294,"correct":22},"压型钢板墙板工程量不计算包角、包边",{"key":31,"text":296,"correct":29},"钢板天沟按设计图示尺寸以长度计算",{"key":34,"text":298,"correct":29},"成品雨篷按设计图示尺寸以质量计算",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},907393,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于土方工程量计算与项目列项，说法正确的有()。",[303,305,307,309,311],{"key":20,"text":304,"correct":29},"建筑物场地挖、填厚度≤±300mm的挖土应按一般土方项目编码列项",{"key":24,"text":306,"correct":22},"平整场地工程量按设计图示尺寸以建筑物首层建筑面积计算",{"key":27,"text":308,"correct":22},"挖一般土方应按设计图示尺寸以挖掘前天然密实体积计算",{"key":31,"text":310,"correct":29},"挖沟槽土方工程量按沟槽设计图示中心线长度计算",{"key":34,"text":312,"correct":22},"挖基坑土方工程量按设计图示尺寸以体积计算","BCE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":110,"analysis":37},907394,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于综合脚架，说法正确的有()。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"工程量按建筑面积计算",{"key":24,"text":321,"correct":29},"用于房屋加层时应说明加层高度",{"key":27,"text":323,"correct":22},"项目特征应说明建筑结构形式和檐口高度",{"key":31,"text":325,"correct":22},"同一建筑物有不同的檐高时，分别按不同檐高列项",{"key":34,"text":327,"correct":29},"项目特征必须说明脚手架材质",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},907395,"(2014年)关于现浇混凝土墙工程量计算，说法正确的有（）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"一般的短肢剪力墙，按设计图示尺寸以体积计算",{"key":24,"text":335,"correct":22},"直形墙、挡土墙按设计图示尺寸以体积计算",{"key":27,"text":337,"correct":29},"弧形墙按墙厚不同以展开面积计算",{"key":31,"text":339,"correct":29},"墙体工程量应扣除预埋铁件所占体积",{"key":34,"text":341,"correct":29},"墙垛及突出墙面部分的体积不计算","AB",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":140,"analysis":37},907396,"（2017年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013),石方工程量计算正确的有( )。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"挖一般石方按设计图示尺寸以建筑物首层面积计算",{"key":24,"text":350,"correct":22},"挖沟槽石方按沟槽设计底面积乘以挖石深度以体积计算",{"key":27,"text":352,"correct":29},"挖基坑石方按基坑底面积乘以自然地面测量标高至设计地坪标高的平均厚度以体积计算",{"key":31,"text":354,"correct":22},"挖管沟石方按设计图示以管道中心线长度以米计算",{"key":34,"text":356,"correct":22},"挖管沟石方按设计图示截面积乘以长度以体积计算",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":270,"analysis":37},907397,"(2016年)根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于楼地面装饰工程量计算，说法正确的有()。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"自流坪地面按图示尺寸以面积计算",{"key":24,"text":364,"correct":22},"整体面层按设计图示尺寸以面积计算",{"key":27,"text":366,"correct":22},"块料踢脚线可按延长米计算",{"key":31,"text":368,"correct":29},"石材台阶面装饰按设计图示以台阶最上踏步外延以外水平投影面积计算",{"key":34,"text":370,"correct":22},"塑料板楼地面按设计图示尺寸以面积计算",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},907398,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），措施项目工程量计算正确的是（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":29},"里脚手架按建筑面积计算",{"key":24,"text":378,"correct":22},"满堂脚手架按搭设水平投影面积计算",{"key":27,"text":380,"correct":22},"混凝土墙模板按模板与墙接触面积计算",{"key":31,"text":382,"correct":22},"混凝土构造柱模板按图示外露部分计算模板面积",{"key":34,"text":384,"correct":22},"超高施工增加费包括人工、机械降效，供水加压以及通信联络设备费用","BCDE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},907399,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），楼地面装饰工程量计算正确的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"现浇水磨石楼地面按设计图示尺寸以面积计算",{"key":24,"text":393,"correct":29},"细石混凝土楼地面按设计图示尺寸以体积计算",{"key":27,"text":395,"correct":29},"块料台阶面按设计图示尺寸以展开面积计算",{"key":31,"text":397,"correct":22},"金属踢脚线按延长米计算",{"key":34,"text":399,"correct":22},"石材楼地面按设计图示尺寸以面积计算","ADE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":140,"analysis":37},907400,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，石方工程量计算正确的有（ ）。",[405,406,407,408,409],{"key":20,"text":348,"correct":29},{"key":24,"text":350,"correct":22},{"key":27,"text":352,"correct":29},{"key":31,"text":354,"correct":22},{"key":34,"text":356,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},907401,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，墙面防水工程量计算确的有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":29},"墙面涂膜防水按设计图示尺寸以质量计算",{"key":24,"text":417,"correct":29},"墙面砂浆防水按设计图示尺寸以体积计算",{"key":27,"text":419,"correct":22},"墙面变形缝按设计图示尺寸以长度计算",{"key":31,"text":421,"correct":22},"墙面卷材防水按设计图示尺寸以面积计算",{"key":34,"text":423,"correct":29},"墙面防水搭接用量按设计图示尺寸以面积计算","CD",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":385,"analysis":37},907402,"(2018年)根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），措施项目工程量计算有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":29},"垂直运输按使用机械设备数量计算",{"key":24,"text":432,"correct":22},"悬空脚手架按搭设的水平投影面积计算、",{"key":27,"text":434,"correct":22},"排水、降水工程量，按排水、降水日历天数计算",{"key":31,"text":436,"correct":22},"整体提升架按所服务对象的垂直投影面积计算",{"key":34,"text":438,"correct":22},"超高施工增加按建筑物超高部分的建筑面积计算",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":453,"analysis":37},907403,"(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，现浇混凝土构件工程量计算正确的有（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":29},"构造柱按柱断面尺寸乘以全高以体积计算，嵌入墙体部分不计",{"key":24,"text":446,"correct":29},"框架柱工程量按柱基上表面至柱顶以高度计算",{"key":27,"text":448,"correct":22},"梁按设计图示尺寸以体积计算，主梁与次梁交接处按主梁体积计算",{"key":31,"text":450,"correct":29},"混凝土弧形墙按垂直投影面积乘以墙厚以体积计算",{"key":34,"text":452,"correct":22},"挑檐板按设计图示尺寸以体积计算","CE",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":95,"analysis":37},907404,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，非标准图设计木屋架项目特征中应描述( )。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"跨度",{"key":24,"text":461,"correct":22},"材料品种及规格",{"key":27,"text":463,"correct":29},"运输和吊装要求",{"key":31,"text":465,"correct":22},"刨光要求",{"key":34,"text":467,"correct":22},"防护材料种类",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":481,"analysis":37},907405,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013)，现浇混凝土板清单工程量计算正确的有( )。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"压形钢板混凝土楼板扣除钢板所占体积",{"key":24,"text":475,"correct":29},"空心板不扣除空心部分体积",{"key":27,"text":477,"correct":22},"雨蓬反挑檐的体积并入雨篷内一并计算",{"key":31,"text":479,"correct":29},"悬挑板不包括伸出墙外的牛腿体积",{"key":34,"text":452,"correct":22},"ACE",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":400,"analysis":37},907406,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013)，屋面及防水清单工程量计算正确的有( )。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"屋面排水管按檐口至设计室外散水上表面垂直距离计算",{"key":24,"text":489,"correct":29},"斜屋面卷材防水按屋面水平投影面积计算",{"key":27,"text":491,"correct":29},"屋面排气管按设计图示以数量计算",{"key":31,"text":493,"correct":22},"屋面檐沟防水按设计图示尺寸以展开面积计算",{"key":34,"text":495,"correct":22},"屋面变形缝按设计图示以长度计算",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":510,"analysis":37},907411,"(2014年)关于建筑面积计算，说法正确的有（）。",[500,502,504,506,508],{"key":20,"text":501,"correct":29},"露天游泳池按设计图示外围水平投影面积的1\u002F2计算",{"key":24,"text":503,"correct":29},"建筑物内的储水罐平台按平台投影面积计算",{"key":27,"text":505,"correct":29},"有永久顶盖的室外楼梯，按楼梯水平投影面积计算",{"key":31,"text":507,"correct":22},"建筑物主体结构内的阳台按其结构外围水平面积计算",{"key":34,"text":509,"correct":22},"宽度超过2.10m的雨篷按结构板的水平投影面积1\u002F2计算","DE",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":110,"analysis":37},907413,"(2016年)根据《建筑工程建筑面积计算规范》GB\u002FT50353-2013，应计算1\u002F2建筑面积的有()。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"高度不足2.20m的单层建筑物",{"key":24,"text":518,"correct":29},"净高不足1.20m的坡屋顶部分",{"key":27,"text":520,"correct":22},"层高不足2.20m地下室",{"key":31,"text":522,"correct":22},"有永久顶盖无围护结构建筑物",{"key":34,"text":524,"correct":29},"外挑宽度不足2.10m的雨篷",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":52,"analysis":37},907414,"(2015年)根据《建筑工程建筑面积计算规范》(GB\u002FT50353-2013)规定，关于建筑面积计算正确的为()。",[529,531,533,535,537],{"key":20,"text":530,"correct":29},"过街楼底层的建筑物通道按通道底板水平面积计算",{"key":24,"text":532,"correct":29},"建筑物露台按围护结构外围水平面积计算",{"key":27,"text":534,"correct":22},"挑出宽度1.80m的无柱雨篷不计算",{"key":31,"text":536,"correct":22},"建筑物室外台阶不计算",{"key":34,"text":538,"correct":22},"挑出宽度超过1.00m的空调室外机搁板不计算",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":553,"analysis":37},907415,"(2014年)以下有关建筑面积指标的计算，正确有（）。",[543,545,547,549,551],{"key":20,"text":544,"correct":29},"建筑容积率=底层建筑面积\u002F建筑占地面积×100%",{"key":24,"text":546,"correct":22},"建筑容积率=建筑总面积\u002F建筑占地面积×100%",{"key":27,"text":548,"correct":29},"建筑密度=建筑总面积\u002F建筑占地面积×100%",{"key":31,"text":550,"correct":22},"建筑密度=建筑底层面积\u002F建筑占地总面积×100%",{"key":34,"text":552,"correct":29},"建筑容积率=建筑占地面积\u002F建筑总面积×100%","BD",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":155,"analysis":37},907416,"(2016年)根据《建筑工程建筑面积计算规范》GB\u002FT50353-2013，不计算建筑面积的有()。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"建筑物室外台阶",{"key":24,"text":561,"correct":22},"空调室外机搁板",{"key":27,"text":563,"correct":22},"屋顶可上人露台",{"key":31,"text":565,"correct":29},"与建筑物不相连的有顶盖车厢",{"key":34,"text":567,"correct":29},"建筑物内的变形缝",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},907417,"（2017年）根据《建筑工程建筑面积计算规范》(GB\u002FT50353-2013),不计算建筑面积的有( )。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"建筑物首层地面有围护设施的露台",{"key":24,"text":575,"correct":29},"兼顾消防与建筑物相同的室外钢楼梯",{"key":27,"text":577,"correct":22},"与建筑物相连的室外台阶",{"key":31,"text":579,"correct":29},"与室內相通的变形缝",{"key":34,"text":581,"correct":29},"形成建筑空间,结构净高1.50m 的坡屋顶","AC",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":52,"analysis":37},907418,"(2013年)根据《建筑工程建筑面积计算规范》(GB\u002FT50353)，下列建筑中不应计算建筑面积的有()。",[587,589,591,593,595],{"key":20,"text":588,"correct":29},"单层建筑利用坡屋顶净高不足2.10m部分",{"key":24,"text":590,"correct":29},"单层建筑物内局部楼层的二层部分",{"key":27,"text":592,"correct":22},"多层建筑设计利用坡屋顶内净高不足1.20m部分",{"key":31,"text":594,"correct":22},"外挑宽度大于1.2m但不足2.10m的雨篷",{"key":34,"text":596,"correct":22},"建筑物室外台阶所占面积",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":313,"analysis":37},907419,"(2018年)根据《建筑工程建筑面积计算范》(GB\u002F503532013)，不计算建筑面积的有（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":29},"结构层高为2.10m 的门斗",{"key":24,"text":604,"correct":22},"建筑物内的大型上料平台",{"key":27,"text":606,"correct":22},"无围护结构的观光电梯",{"key":31,"text":608,"correct":29},"有围护结构的舞台灯光控制室",{"key":34,"text":610,"correct":22},"过街楼底层的开放公共空间",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":37},907420,"（2019年）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013)，不计算建筑面积的有( )。",[615,617,619,621,623],{"key":20,"text":616,"correct":29},"结构层高2.0m的管道层",{"key":24,"text":618,"correct":22},"层高为3.3m的建筑物通道",{"key":27,"text":620,"correct":29},"有顶盖但无围护结构的车棚",{"key":31,"text":622,"correct":29},"建筑物顶部有围护结构，层高2.0m的水箱间",{"key":34,"text":624,"correct":22},"有围护结构的专用消防钢楼梯","BE",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":241,"analysis":37},907422,"基础设计时，必须以地下水位100%计算浮托力的底层有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":29},"节理不发育的岩石",{"key":24,"text":633,"correct":22},"节理发育的岩石",{"key":27,"text":635,"correct":22},"碎石土",{"key":31,"text":637,"correct":22},"粉土",{"key":34,"text":639,"correct":29},"粘土",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":553,"analysis":37},907423,"加固不满足承载力要求的砂砾地层，常用的措施有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":29},"喷混凝土",{"key":24,"text":647,"correct":22},"沉井",{"key":27,"text":649,"correct":29},"黏土灌浆",{"key":31,"text":651,"correct":22},"灌注桩",{"key":34,"text":653,"correct":29},"碎石置换",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":95,"analysis":37},907424,"对不满足承载力要求的松散土层，如砂和砂砾石地层等，可采用（ ）等措施处理。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"地下连续墙",{"key":24,"text":661,"correct":22},"沉井加固",{"key":27,"text":663,"correct":29},"振冲置换",{"key":31,"text":665,"correct":22},"预制桩加固",{"key":34,"text":667,"correct":22},"固结灌浆加固",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":385,"analysis":37},907425,"滑坡的发生与水有很大关系，下列说法正确的是（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"在滑坡体的上部，均可刷方减重",{"key":24,"text":675,"correct":22},"渗水降低滑动控制面的摩擦系数",{"key":27,"text":677,"correct":22},"渗水降低滑动控制面的黏聚力",{"key":31,"text":679,"correct":22},"在滑坡体上方修筑截水设施",{"key":34,"text":681,"correct":22},"在滑坡体坡脚采用挡土墙",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":400,"analysis":37},907427,"影响岩石边坡稳定的主要地质因素有（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"地质构造",{"key":24,"text":689,"correct":29},"岩石的成因",{"key":27,"text":691,"correct":29},"岩石的成分",{"key":31,"text":693,"correct":22},"岩体结构",{"key":34,"text":695,"correct":22},"地下水",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":125,"analysis":37},907428,"整个土体构成上的不均匀性包括（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"层理",{"key":24,"text":703,"correct":29},"松散",{"key":27,"text":705,"correct":29},"团聚",{"key":31,"text":707,"correct":29},"絮凝",{"key":34,"text":709,"correct":22},"结核",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":241,"analysis":37},907429,"常见的沉积岩有（ ）。",[714,716,718,720,722],{"key":20,"text":715,"correct":29},"辉绿岩",{"key":24,"text":717,"correct":22},"泥岩",{"key":27,"text":719,"correct":22},"石灰岩",{"key":31,"text":721,"correct":22},"白云岩",{"key":34,"text":723,"correct":29},"大理岩",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":738,"analysis":37},907430,"以下矿物可用玻璃刻划的有（ ）。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"方解石",{"key":24,"text":731,"correct":22},"滑石",{"key":27,"text":733,"correct":29},"刚玉",{"key":31,"text":735,"correct":29},"石英",{"key":34,"text":737,"correct":22},"石膏","ABE",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]