[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,35,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,501,513,525,537,545,557,569,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},907205,1,"单选题","（2018年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50864-2013），斜屋面的卷材防水工程量应（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","按设计图示尺寸以水平投影面积计算",false,{"key":24,"text":25,"correct":26},"B","按设计图示尺寸以斜面积计算",true,{"key":28,"text":29,"correct":22},"C","扣除房上烟囱、风帽底座所面积",{"key":31,"text":32,"correct":22},"D","扣除屋面小气窗、斜沟所占面积","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},907206,"（2018年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），石材踢脚线工程量应（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"不予计算",{"key":24,"text":41,"correct":22},"并入地面面层工程量",{"key":28,"text":43,"correct":22},"按设计图示尺寸以长度计算",{"key":31,"text":45,"correct":26},"按设计图示长度乘以高度以面积计算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},907207,"（2018年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），天棚抹灰工程量计算正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"扣除检查口和管道所占面积",{"key":24,"text":53,"correct":22},"板式楼梯底面抹灰按水平投影面积计算",{"key":28,"text":55,"correct":22},"扣除间壁墙、垛和柱所面积",{"key":31,"text":57,"correct":26},"锯齿形楼梯底板抹灰按展开面积计算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},907208,"（2014年真题）某建筑工程挖土方工程量需要通过现场签证核定，已知用斗容量为1.5m3的轮胎式装载机运土500车，则挖土工程量应为（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"501.92m3",{"key":24,"text":65,"correct":26},"576.92m3",{"key":28,"text":67,"correct":22},"623.15m3",{"key":31,"text":69,"correct":22},"750m3",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},907209,"（2017年真题）根据《混凝土结构工程施工规范》（GB50666-2011），一般构件的箍筋加工时，应使（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"弯钩的弯折角度不小于45°",{"key":24,"text":77,"correct":26},"弯钩的弯折角度不小于90°",{"key":28,"text":79,"correct":22},"弯折后平直段长度不小于2.5d",{"key":31,"text":81,"correct":22},"弯折后平直段长度不小于3d",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},907210,"（2017年真题）根据《混凝土结构设计规范》（GB50010-2010），设计使用年限为50年的二b环境类别条件下，混凝土梁柱最外层钢筋保护层最小厚度应为（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"25mm",{"key":24,"text":89,"correct":26},"35mm",{"key":28,"text":91,"correct":22},"40mm",{"key":31,"text":93,"correct":22},"50mm",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},907211,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），屋面防水及其他工程量计算正确的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"屋面卷材防水按设计图尺寸以面积计算，防水搭接及附加层用量按设计尺寸计算",{"key":24,"text":101,"correct":22},"屋面排水管设计未标注尺寸，考虑弯折处的增加以长度计算",{"key":28,"text":103,"correct":26},"屋面铁皮天沟按设计图示尺寸以展开面积计算",{"key":31,"text":105,"correct":22},"屋面变形缝按设计尺寸以铺设面积计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},907212,"（2019年真题）但据《屋建筑与装饰工程工程量计算规范》（GB50854-2013）,压型钢板楼板清单工程量计算应（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"按设计图示数量计算,以\"t\"计量",{"key":24,"text":113,"correct":22},"按设计图示规格计算、以\"块\"计量",{"key":28,"text":115,"correct":22},"不扣除孔洞部分",{"key":31,"text":117,"correct":26},"按设计图示以铺设水平投影面积计算,以\"m2\"计量",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},907213,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,打预制钢筋混凝土方桩清单工程量计算正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"打桩按打入实体长度（不包括桩尖）计算,以\"m\"计量",{"key":24,"text":125,"correct":26},"截桩头按设计桩截面乘以桩头长度以体积计算,以\"m3\"计量",{"key":28,"text":127,"correct":22},"接桩按接头数量计算,以\"个\"计量",{"key":31,"text":129,"correct":22},"送桩按送入长度计算,以\"m\"计量",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},907214,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），钢筋工程量计算正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"钢筋机械连接需单独列项计算工程量",{"key":24,"text":137,"correct":22},"设计未标明连接的均按每12m计算1个接头",{"key":28,"text":139,"correct":22},"框架梁贯通钢筋长度不含两端锚固长度",{"key":31,"text":141,"correct":22},"框架梁贯通钢筋长度不含搭接长度",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},907215,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,关于钢网架清单项,下列说法正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"钢网架项目特征中应明确探伤和防火要求",{"key":24,"text":149,"correct":22},"钢网架铆钉应按设计图示个数以数量计量",{"key":28,"text":151,"correct":22},"钢网架中螺栓按个数以数量计量.",{"key":31,"text":153,"correct":22},"钢网架按设计图示尺寸扣除孔眼部分以质量计量",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},907216,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,混凝土构件拆除清单工程量计算正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"可按拆除构件的虚方工程量计算,以\"m3\"计量",{"key":24,"text":161,"correct":26},"可按拆除部位的面积计算,以\"m2\"计量",{"key":28,"text":163,"correct":22},"可按拆除构件的运输工程量计算,以\"m3\"计量",{"key":31,"text":165,"correct":22},"按拆除构件的质量计算,以\"t\"计量",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},907217,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,金属结构钢管柱清单工程量计算时,不予计量的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"节点板",{"key":24,"text":173,"correct":26},"螺栓",{"key":28,"text":175,"correct":22},"加强环",{"key":31,"text":177,"correct":22},"牛腿",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},907218,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,金属门清单工程量计算正确的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"门锁、拉手按金属门五金一并计算,不单列项",{"key":24,"text":185,"correct":22},"按设计图示洞口尺寸以质量计算",{"key":28,"text":187,"correct":22},"按设计门框或扇外围图示尺寸以质量计算",{"key":31,"text":189,"correct":22},"钢质防火门和防盗门不按金属门列项",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},907219,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,砌块墙清单工程量计算正确的是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"墙体内拉结筋不另列项计算",{"key":24,"text":197,"correct":22},"压砌钢筋网片不另列项计算",{"key":28,"text":199,"correct":26},"勾缝应列入工作内容",{"key":31,"text":201,"correct":22},"垂直灰缝灌细石混凝土工程量不另列项计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},907220,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,现浇混凝土构件清单工程量计算正确的是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"建筑物散水工程量并入地坪不单独计算",{"key":24,"text":209,"correct":22},"室外台阶工程量并入室外楼梯工程量",{"key":28,"text":211,"correct":26},"压顶工程量可按设计图示尺寸以体积计算,以\"m3\"计量",{"key":31,"text":213,"correct":22},"室外坡道工程量不单独计算",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},907221,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,现浇混凝土肢剪力墙工程量计算正确的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"短肢剪力墙按现浇混凝土异形墙列项",{"key":24,"text":221,"correct":22},"各肢截面高度与厚度之比大于5时按现浇混凝土矩形柱列项",{"key":28,"text":223,"correct":22},"各肢截面高度与厚度之比小于4时按现浇混凝土墙列项",{"key":31,"text":225,"correct":26},"各肢截面高度与厚度之比为4.5时,按短肢剪力墙列项",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},907222,"（2019年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,以\"樘\"计的金属橱窗项目特征中必须描述（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"洞口尺寸",{"key":24,"text":233,"correct":22},"玻璃面积",{"key":28,"text":235,"correct":22},"窗设计数量",{"key":31,"text":237,"correct":26},"框外围展开面积",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},907223,"（2019年真题）关于混凝土保护层厚度,下列说法正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"现浇混凝土柱中钢筋的混凝土保护层厚度指纵向主筋至混凝土外表面的距离",{"key":24,"text":245,"correct":22},"基础中钢筋的混凝土保护层厚度应从垫层顶面算起,且不应小于30mm",{"key":28,"text":247,"correct":22},"混凝土保护层厚度与混凝土结构设计使用年限无关",{"key":31,"text":249,"correct":26},"混凝土构件中受力钢筋的保护层厚度不应小于钢筋的公称直径",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},907224,"（2019年真题）某建筑物砂土场地,设计开挖面积为20m×7m,自然地面标高为-0.2m,设计室外地坪标高为-0.3m,设计开挖底面标高为-1.2m。根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,土方工程清单工程量计算应（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"执行挖一般土方项目,工程量为140m3",{"key":24,"text":257,"correct":22},"执行挖一般土方项目,工程量为126m3",{"key":28,"text":259,"correct":26},"执行挖基坑土方项目,工程量为140m3",{"key":31,"text":261,"correct":22},"执行挖基坑土方项目,工程量为126m3",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},907225,"（2019年真题）某较为平整的软岩施工场地,设计长度为30m,宽为10m,开挖深度为0.8m。根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,开挖石方清单工程量为（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"沟槽石方工程量300m2",{"key":24,"text":269,"correct":22},"基坑石方工程量240m3",{"key":28,"text":271,"correct":22},"管沟石方工程量30m",{"key":31,"text":273,"correct":26},"一般石方工程量240m3",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},907226,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》(GB 50854-2013)某钢筋混凝土粱长为12000mm。设计保护层厚为25mm，钢筋为A10@300，则该梁所配钢筋数量应为（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"40根",{"key":24,"text":281,"correct":26},"41根",{"key":28,"text":283,"correct":22},"42根",{"key":31,"text":285,"correct":22},"300根",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},907227,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），挖480mm宽的钢筋混凝土直埋管道沟槽，每侧工作面宽度应为（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"200mm",{"key":24,"text":293,"correct":22},"250mm",{"key":28,"text":295,"correct":26},"400mm",{"key":31,"text":297,"correct":22},"500mm",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},907228,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），屋面防水工程量计算正确的为（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"斜屋面按水平投影面积计算",{"key":24,"text":305,"correct":22},"女儿墙处弯起部分应单独列项计算",{"key":28,"text":307,"correct":26},"防水卷材搭接用量不另行计算",{"key":31,"text":309,"correct":22},"屋面伸缩缝弯起部分单独列项计算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},907229,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），打桩项目工作内容应包括（）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"送桩",{"key":24,"text":317,"correct":22},"承载力检测",{"key":28,"text":319,"correct":22},"桩身完整性检测",{"key":31,"text":321,"correct":22},"截（凿）桩头",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},907230,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），地下连续墙项目工程量计算，说法正确的为（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"工程量按设计图示围护结构展开面积计算",{"key":24,"text":329,"correct":22},"工程量按连续墙中心线长度乘以高度以面积计算",{"key":28,"text":331,"correct":22},"钢筋网的制作及安装不另计算",{"key":31,"text":333,"correct":26},"工程量按设计图示墙中心线长乘以厚度乘以槽深以体积计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},907231,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），地基处理的换填垫层项目特征中，应说明材料种类及配比、压实系数和（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"基坑深度",{"key":24,"text":341,"correct":22},"基底土分类",{"key":28,"text":343,"correct":22},"边坡支护形式",{"key":31,"text":345,"correct":26},"掺加剂品种",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},907232,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），幕墙工程工程计算正确的为（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"应扣除与带骨架幕墙同种材质的窗所占面积",{"key":24,"text":353,"correct":22},"带肋全玻幕墙玻璃肋工程量应单独计算",{"key":28,"text":355,"correct":22},"带骨架幕墙按图示框内围尺寸以面积计算",{"key":31,"text":357,"correct":26},"带肋全玻幕墙按展开面积计算",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},907233,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），墙面抹灰工程量计算正确的为（）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"墙面抹灰中墙面勾缝不单独列项",{"key":24,"text":365,"correct":22},"有吊顶天棚的内墙面抹灰抹至吊顶以上部分应另行计算",{"key":28,"text":367,"correct":26},"墙面水刷石按墙面装饰抹灰编码列项",{"key":31,"text":369,"correct":22},"墙面抹石膏灰浆按墙面装饰抹灰编码列项",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},907234,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），与墙相连的墙间柱保温隔热工程量计算正确的为（）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"按设计图示尺寸以“㎡”单独计算",{"key":24,"text":377,"correct":22},"按设计图示尺寸以“m”单独计算",{"key":28,"text":379,"correct":26},"不单独计算，并入保温墙体工程量内",{"key":31,"text":381,"correct":22},"按计算图示柱展开面积“㎡”单独计算",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},907235,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），石砌体工程量计算正确的为（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"石台阶项目包括石梯带和石梯膀",{"key":24,"text":389,"correct":26},"石坡道按设计图示尺寸以水平投影面积计算",{"key":28,"text":391,"correct":22},"石护坡按设计图示尺寸以垂直投影面积计算",{"key":31,"text":393,"correct":22},"石挡土墙按设计图示尺寸以挡土面积计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},907236,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），对于砌块墙砌筑，下列说法正确的是（）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"砌块上、下错缝不满足搭砌要求时应加两根Φ8钢筋拉结",{"key":24,"text":401,"correct":22},"错缝搭接拉结钢筋工程量不计",{"key":28,"text":403,"correct":22},"垂直灰缝灌注混凝土工程量不计",{"key":31,"text":405,"correct":26},"垂直灰缝宽大于30mm时应采用C20细石混凝土灌实",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},907237,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），建筑基础与墙体均为砖砌体，且有地下室，则基础与墙体的划分界限为（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"室内地坪设计标高",{"key":24,"text":413,"correct":22},"室外地面设计标高",{"key":28,"text":415,"correct":26},"地下室地面设计标高",{"key":31,"text":417,"correct":22},"自然地面标高",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},907238,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），木门综合单价计算不包括（）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"折页、插销安装",{"key":24,"text":425,"correct":22},"门碰珠、弓背拉手安装",{"key":28,"text":427,"correct":22},"弹簧折页安装",{"key":31,"text":429,"correct":26},"门锁安装",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},907239,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），预制混凝土三角形屋架应（）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"按组合屋架列项",{"key":24,"text":437,"correct":22},"按薄腹屋架列项",{"key":28,"text":439,"correct":22},"按天窗屋架列项",{"key":31,"text":441,"correct":26},"按折线形屋架列项",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},907240,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），现浇混凝土构件工程量计算正确的为（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"坡道按设计图示尺寸以“m3”计算",{"key":24,"text":449,"correct":26},"架空式台阶按现浇楼梯计算",{"key":28,"text":451,"correct":22},"室外地坪按设计图示面积乘以厚度以“m3”计算",{"key":31,"text":453,"correct":22},"地沟按设计图示结构截面积乘以中心线长度以“m3”计算",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},907241,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），现浇混凝土雨篷工程量计算正确的为（）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"并入墙体工程量，不单独列项",{"key":24,"text":461,"correct":22},"按水平投影面积计算",{"key":28,"text":463,"correct":26},"按设计图示尺寸以墙外部分体积计算",{"key":31,"text":465,"correct":22},"扣除伸出墙外的牛腿体积",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},907242,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），现浇混凝土过梁工程量计算正确的是（）。",[470,472,474,476],{"key":20,"text":471,"correct":26},"伸入墙内的梁头计入梁体积",{"key":24,"text":473,"correct":22},"墙内部分的梁垫按其他构件项目列项",{"key":28,"text":475,"correct":22},"梁内钢筋所占体积予以扣除",{"key":31,"text":477,"correct":22},"按设计图示中心线计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},907243,"（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），天棚工程量计算正确的为（）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"采光天棚工程量按框外围展开面积计算",{"key":24,"text":485,"correct":22},"采光天棚工程量按设计图示尺寸以水平投影面积计算",{"key":28,"text":487,"correct":22},"采光天棚骨架并入天棚工程量，不单独计算",{"key":31,"text":489,"correct":22},"顶龙骨安装单独列项计算工程量",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},907244,"（2017年真题）根据《建筑工程建筑面积规范》（GB-T50353-2013），形成建筑空间，结构净高2.18m部位的坡屋顶，其建筑面积（）。",[494,495,497,499],{"key":20,"text":39,"correct":22},{"key":24,"text":496,"correct":22},"按1\u002F2面积计算",{"key":28,"text":498,"correct":26},"按全面积计算",{"key":31,"text":500,"correct":22},"视使用性质确定",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},907245,"（2017年真题）根据《建筑工程建筑面积规范》（GB-T50353-2013），建筑物间有两侧护栏的架空走廊，其建筑面积（）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"按护栏外围水平面积的1\u002F2计算",{"key":24,"text":508,"correct":26},"按结构底板水平投影面积的1\u002F2计算",{"key":28,"text":510,"correct":22},"按护栏外围水平面积计算全面积",{"key":31,"text":512,"correct":22},"按结构底板水平投影面积计算全面积",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},907246,"（2017年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013），围护结构不垂直于水平面结构净高2.15m楼层部位，其建筑面积应（）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"按顶板水平投影面积的1\u002F2计算",{"key":24,"text":520,"correct":22},"按顶板水平投影面积计算全面积",{"key":28,"text":522,"correct":22},"按底板外墙外围水平面积的1\u002F2计算",{"key":31,"text":524,"correct":26},"按底板外墙外围水平面积计算全面积",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":28,"analysis":33},907247,"（2017年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）,建筑物室外楼梯，其建筑面积（）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"按水平投影面积计算全面积",{"key":24,"text":532,"correct":22},"按结构外围面积计算全面积",{"key":28,"text":534,"correct":26},"依附于自然层按水平投影面积的1\u002F2计算",{"key":31,"text":536,"correct":22},"依附于自然层按结构外层面积的1\u002F2计算",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},907248,"（2016年真题）根据《建筑工程新面积计算规范》（GB50500-2013），关于建筑面积计算说法正确的是（）。A以幕墙作为围护结构的建筑物按幕墙外边线计算建筑面积B高低跨内相连通时变形缝计入高跨面积内C.多层建筑首层按照勒脚外围水平面积计算D.建筑物变形缝所占面积按自然层扣除",[541,542,543,544],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},907249,"（2016年真题）根据《建筑工程新面积计算舰范》（GB50500-2013），关于大型体育场看台下部设计利用部位建筑面积计算，说法正确的是（）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"层高\u003C2.10m,不计算建筑面积",{"key":24,"text":552,"correct":22},"层高>2.10m，且设计加以利用计算1\u002F2面积",{"key":28,"text":554,"correct":26},"1.20m\u003C净高\u003C2.10m时，计算1\u002F2面积",{"key":31,"text":556,"correct":22},"层高≥1.20m计算全面积",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},907250,"（2016年真题）根据《建筑工程新面积计算规范》（GB50500-2013），关于建筑物外有永久顶盖无围护结构的走廊，建筑面积计算说法正确的是（）。",[561,563,565,567],{"key":20,"text":562,"correct":26},"按结构底板水平面积的1\u002F2计算",{"key":24,"text":564,"correct":22},"按顶盖水平设计面积计算",{"key":28,"text":566,"correct":22},"层高超过2.1m的计算全面积",{"key":31,"text":568,"correct":22},"层高不超过2m的不计箄建筑面积",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},907251,"（2016年真题）根据《建筑工程新面积计算规范》（GB50500-2013），关于无永久顶盖的室外顶层楼梯，其建筑面积计算说法正确的是（）。 A.按水平投影面积计算B按水平投影面积的1\u002F2计算 C.不计算建筑面积 D.层高2.20m以上按水平投影面积计算",[573,574,575,576],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},907252,"（2015年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）规定，建筑物的建筑面积应按自然层外墙结构外围水平面积之和计算。以下说法正确的是（）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"建筑物高度为2.00m部分，应计算全面积",{"key":24,"text":584,"correct":22},"建筑物高度为1.80m部分不计算面积",{"key":28,"text":586,"correct":22},"建筑物高度为l.20m部分不计算面积",{"key":31,"text":588,"correct":26},"建筑物高度为2.10m部分应计算1\u002F2面积",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},907253,"（2015年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）规定，地下室、半地下室建筑面积计算正确的是（）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"层高不足1.80m者不计算面积",{"key":24,"text":596,"correct":26},"层高为2.10m的部位计算l\u002F2面积",{"key":28,"text":598,"correct":22},"层高为2.10m的部位应计算全面积",{"key":31,"text":600,"correct":22},"层高为2.10m以上的部位应计算全面积",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":28,"analysis":33},907254,"（2015年真题）根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）规定，建筑物大厅内的层高在2.20m及以上的回（走）廊，建筑面积计算正确的是（）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"按回（走）廊水平投影面积并入大厅建筑面积",{"key":24,"text":608,"correct":22},"不单独计算建筑面积",{"key":28,"text":610,"correct":26},"按结构底板水平投影面积计算",{"key":31,"text":612,"correct":22},"按结构底板水平面积的1／2计算",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]