[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,33,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},907105,1,"单选题","（2014年真题）城市建筑的基础工程，采用地下连续墙施工的主要优点在于（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","开挖基坑的土方外运方便",false,{"key":24,"text":25,"correct":22},"B","墙段之间接头质量易控制，施工方便",{"key":27,"text":28,"correct":22},"C","施工技术简单，便于管理",{"key":30,"text":31,"correct":32},"D","施工振动小，周边干扰小",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},907106,"（2014年真题）地下连续墙混凝土浇灌应满足以下要求（）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"水泥用量不宜小于400kg\u002Fm3",{"key":24,"text":41,"correct":22},"导管内径约为粗骨料粒径的3倍",{"key":27,"text":43,"correct":22},"混凝土水灰比不应小于0.6",{"key":30,"text":45,"correct":22},"混凝土强度等级不高于C20",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},907107,"（2014年真题）隧道工程喷射混凝土施工，说法正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工作风压应随输送管距增加而降低",{"key":24,"text":53,"correct":22},"喷嘴与作业面的距离应小于0.5m",{"key":27,"text":55,"correct":32},"喷嘴水压通常应比工作风压大",{"key":30,"text":57,"correct":22},"喷射混凝土骨料含水率应大于8%",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},907108,"（2013年真题）水泥土挡墙式深基坑支护方式不宜用于（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"基坑侧壁安全等级宜为一级",{"key":24,"text":65,"correct":22},"施工范围内地基承载力小于150kPa",{"key":27,"text":67,"correct":22},"基坑深度小于6m",{"key":30,"text":69,"correct":22},"基坑周围工作面较宽",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},907109,"（2013年真题）适用深埋于岩体的长隧洞施工的方法是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"顶管法",{"key":24,"text":77,"correct":32},"TBM法",{"key":27,"text":79,"correct":22},"盾构法",{"key":30,"text":81,"correct":22},"明挖法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},907110,"（2013年真题）地下工程的早强水泥砂浆锚杆用树脂药包的，正常温度下需要搅拌的时间为（）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"30s",{"key":24,"text":89,"correct":22},"45～60s",{"key":27,"text":91,"correct":22},"3min",{"key":30,"text":93,"correct":22},"5min",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},907111,"（2013年真题）沉井的排水挖土下沉法适用于（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"透水性较好的土层",{"key":24,"text":101,"correct":22},"涌水量较大的土层",{"key":27,"text":103,"correct":32},"排水时不至于产生流砂的土层",{"key":30,"text":105,"correct":22},"地下水较丰富的土层",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},907112,"（2018年真题）用于隧道钻爆法开挖，效率较高且比较先进的钻孔机械是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"气腿风钻",{"key":24,"text":113,"correct":22},"潜孔钻",{"key":27,"text":115,"correct":32},"钻车",{"key":30,"text":117,"correct":22},"手风钻",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},907113,"（2018年真题）用于隧道喷锚支护的锚杆,其安设方向一般应垂直于（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"开挖面",{"key":24,"text":125,"correct":22},"断层面",{"key":27,"text":127,"correct":22},"裂隙面",{"key":30,"text":129,"correct":32},"岩层面",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},907114,"（2015年真题）对地下工程喷射混凝土施工说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"喷嘴处水压应比工作风压大",{"key":24,"text":137,"correct":22},"工作风压随送风距离增加而调低",{"key":27,"text":139,"correct":22},"骨料回弹率与一次喷射厚度成正此",{"key":30,"text":141,"correct":22},"喷嘴与作业面之间的距离越小，回弹率越低",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},907115,"（2019年真题）关于深基坑土方开挖采用冻结排桩法支护技术,下列说法正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"冻结管应置于排桩外侧",{"key":24,"text":149,"correct":22},"卸压孔应置于冻结管和排桩之间",{"key":27,"text":151,"correct":22},"冻结墙的主要作用是支撑土体",{"key":30,"text":153,"correct":22},"排桩的主要作用是隔水",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},907116,"（2019年真题）关于深基坑土方开挖采用型钢水泥土复合搅拌桩支护技术,下列说法正确（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"搅拌水泥土终凝后方可加设横向型钢",{"key":24,"text":161,"correct":32},"型钢的作用是增强搅拌桩的抗剪能力",{"key":27,"text":163,"correct":22},"水泥土作为承受弯矩的主要结构",{"key":30,"text":165,"correct":22},"型钢应加设在水泥土墙的内侧",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},907117,"（2019年真题）关于隧道工程采用掘进机施工,下列说法正确的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":32},"全断面掘进机的突出优点是可实现一次成型",{"key":24,"text":173,"correct":22},"独臂钻适宜于围岩不稳定的岩层开挖",{"key":27,"text":175,"correct":22},"天井钻开挖是沿着导向孔从上往下钻进",{"key":30,"text":177,"correct":22},"带盾构的掘进机主要用于特别完整岩层的开挖",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},907118,"（2020年真题）冻结排桩法施工技术主要适用于（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"基岩比较坚硬、完整的深基坑施工",{"key":24,"text":185,"correct":22},"表土覆盖比较浅的一般基坑施工",{"key":27,"text":187,"correct":32},"地下水丰富的深基坑施工",{"key":30,"text":189,"correct":22},"岩土体自支撑能力较强的浅基坑施工",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},907119,"（2017年真题）《国家建筑标准设计图集》（16G101）混凝土结构施工平面图平面整体表示方法其优点在于（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"适用于所有地区现浇混凝土结构施工图设计",{"key":24,"text":197,"correct":32},"用图集表示了大量的标准结构详图",{"key":27,"text":199,"correct":22},"适当增加图纸数量，表达更为详细",{"key":30,"text":201,"correct":22},"识图简单一目了然",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},907120,"（2017年真题）《国家建筑标准设计图集》（16G101）平法施工图中，剪力墙上柱的标注代号为（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"JLQZ",{"key":24,"text":209,"correct":22},"GLQSZ",{"key":27,"text":211,"correct":22},"LZ",{"key":30,"text":213,"correct":32},"QZ",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},907121,"（2017年真题）在《国家建筑标准设计图集》（16G101）梁平法施工图中，KL9（6 A）表示的含义是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"9跨屋面框架梁，间距为6m，等截面梁",{"key":24,"text":221,"correct":22},"9跨框支梁，间距为6m，主梁",{"key":27,"text":223,"correct":32},"9号楼层框架梁，6跨，一端悬挑",{"key":30,"text":225,"correct":22},"9号框架梁，6跨，两端悬挑",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},907122,"（2016年真题）《建设工程工程量清单计价规范》（GB50500-2013），关于项目特征，说法正确的是（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目特征是编制工程量清单的基础",{"key":24,"text":233,"correct":22},"顶目特征是确定工程内容的核心",{"key":27,"text":235,"correct":32},"项目特征是项目自身价值的本质特征",{"key":30,"text":237,"correct":22},"项目特征工程结算的关键依据",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},907123,"（2014年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，以下说法正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"分部分项工程量清单与定额所采用的计量单位相同",{"key":24,"text":245,"correct":22},"同一建设项目的多个单位工程的相同项目可采用不同的计量单位分别计量",{"key":27,"text":247,"correct":22},"以“m”、“m2”、“m3”等为单位的应按四舍五入的原则取整",{"key":30,"text":249,"correct":32},"项目特征反映了分部分项和措施项目自身价值的本质特征",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},907124,"（2013年真题）根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），编制工程量清单补充项目时，编制人应报备案的单位是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"企业技术管理部门",{"key":24,"text":257,"correct":22},"工程所在地造价管理部门",{"key":27,"text":259,"correct":32},"省级或行业工程造价管理机构",{"key":30,"text":261,"correct":22},"住房和城乡建设部标准定额研究所",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},907125,"（2018年真题）在同一合同段的工程量清单中，多个单位工程中具有相同项目特征的项目编码和计量单位时（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"项目编码不一致，计量单位不一致",{"key":24,"text":269,"correct":22},"项目编码一致，计量单位一致",{"key":27,"text":271,"correct":32},"项目编码不一致，计量单位一致",{"key":30,"text":273,"correct":22},"项目编码一致，计量单位不一致",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},907126,"（2018年真题）在我国现行的16G101系列平法图纸中，楼层框架梁的标注代号为（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"WKL",{"key":24,"text":281,"correct":32},"KL",{"key":27,"text":283,"correct":22},"KBL",{"key":30,"text":285,"correct":22},"KZL",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},907127,"（2018年真题）BIM技术对工程造价管理的主要作用在于（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"工程量清单项目划分",{"key":24,"text":293,"correct":32},"工程量计算更准确、高效",{"key":27,"text":295,"correct":22},"综合单价构成更合理",{"key":30,"text":297,"correct":22},"措施项目计算更可行",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},907128,"（2019年真题）对独立柱基础底板配筋平法标注图中的\"T:7C18@100\u002FC10@200\",理解正确的是（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"\"T\"表示底板底部配筋",{"key":24,"text":305,"correct":22},"\"7C18@100\"表示7根HRB335级钢筋,间距100mm",{"key":27,"text":307,"correct":22},"\"C10@200\"表示直径为10mm的HRB335级钢筋,间距200mm",{"key":30,"text":309,"correct":32},"\"7C18@100\"表示7根受力筋的配置情况",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},907129,"（2019年真题）工程量清单特征描述主要说明（）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"措施项目的质量安全要求",{"key":24,"text":317,"correct":32},"确定综合单价需考虑的问题",{"key":27,"text":319,"correct":22},"清单项目的计算规则",{"key":30,"text":321,"correct":22},"分部分项项目和措施项目的区别",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},907130,"（2020年真题）有梁楼盖平法施工图中标注的XB2 h=120\u002F80；Xcφ8@150；Ycφ8@200；T：Xφ8@150理解正确的是（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"XB2表示“2块楼面板”",{"key":24,"text":329,"correct":32},"“B：Xc中8@150”表示“板下部配X向构造筋中8@150”",{"key":27,"text":331,"correct":22},"Y8@200表示“板上部配构造筋中8@200”",{"key":30,"text":333,"correct":22},"X8@150表示“竖向和X向配贯通纵筋8@150”",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},907131,"（2020年真题）工程计量单位正确的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"换土垫层以“㎡”为计量单位",{"key":24,"text":341,"correct":22},"砌块墙以“㎡”为计量单位",{"key":27,"text":343,"correct":32},"混凝土以“m3”为计量单位",{"key":30,"text":345,"correct":22},"墙面抹灰以“m3”为计量单位",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},907132,"（2020年真题）工程量清单项目中的钢筋工程量应是（）。",[350,352,354,356],{"key":20,"text":351,"correct":32},"设计图示钢筋长度的钢筋净重量",{"key":24,"text":353,"correct":22},"不计入搭接和锚固钢筋的用量",{"key":27,"text":355,"correct":22},"设计图示钢筋总消耗量",{"key":30,"text":357,"correct":22},"计入施工余量的钢筋用量",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},907133,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT50854-2013）,某建筑物场地土方工程，设计基础长27m，宽为8m，周边开挖深度均为2m，实际开挖后场内堆土量为570m3，则土方工程量为（）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"平整场地216m3",{"key":24,"text":365,"correct":22},"沟槽土方655m3",{"key":27,"text":367,"correct":22},"基坑土方528m3",{"key":30,"text":369,"correct":32},"一般土方438m3",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},907134,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT50854-2013）,地基处理工程量计算正确的是（）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"换填垫层按设计图示尺寸以体积计算",{"key":24,"text":377,"correct":22},"强夯地基按设计图示处理范围乘以处理深度以体积计算",{"key":27,"text":379,"correct":22},"填料振冲桩以填料体积计算",{"key":30,"text":381,"correct":22},"水泥粉煤灰碎石桩按设计图示尺寸以体积计算",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},907135,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB\u002FT50854-2013）,打桩工程量计算正确的是（）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"打预制钢筋混凝土方桩，按设计图示尺寸桩长以米计算，送桩工程量另计",{"key":24,"text":389,"correct":32},"打预制钢筋混凝土管桩，按设计图示数量以根计算，截桩头工程量另计",{"key":27,"text":391,"correct":22},"钢管桩按设计图示截面积乘以桩长，以实体积计算",{"key":30,"text":393,"correct":22},"钢板桩按不同板幅以设计长度计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},907136,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），砖基础工程量计算正确的是（）。",[398,400,402,404],{"key":20,"text":399,"correct":32},"外墙基础断面积（含大放脚）乘以外墙中心线长度以体积计算",{"key":24,"text":401,"correct":22},"内墙基础断面积（大放脚部分扣除）乘以内墙净长线以体积计算",{"key":27,"text":403,"correct":22},"地圈梁部分体积并入基础计算",{"key":30,"text":405,"correct":22},"靠墙暖气沟挑檐体积并入基础计算",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},907137,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），实心砖墙工程量计算正确的是（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"凸出墙面的砖垛单独列项",{"key":24,"text":413,"correct":32},"框架梁间内墙按梁间墙体积计算",{"key":27,"text":415,"correct":22},"围墙扣除柱所占体积",{"key":30,"text":417,"correct":22},"平屋顶外墙算至钢筋混凝土板顶面",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},907138,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），砌筑工程垫层工程量应（）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"按基坑（槽）底设计图示尺寸以面积计算",{"key":24,"text":425,"correct":22},"按垫层设计宽度乘以中心线长度以面积计算",{"key":27,"text":427,"correct":32},"按设计图示尺寸以体积计算",{"key":30,"text":429,"correct":22},"按实际铺设垫层面积计算",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},907139,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），混凝土框架柱工程量应（）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"按设计图示尺寸扣除板厚所占部分以体积计算",{"key":24,"text":437,"correct":22},"区别不同截面以长度计算",{"key":27,"text":439,"correct":32},"按设计图示尺寸不扣除梁所占部分以体积计算",{"key":30,"text":441,"correct":22},"按柱基上表面至梁底面部分以体积计算",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},907140,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），现浇混凝土墙工程量应（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"扣除突出墙面部分体积",{"key":24,"text":449,"correct":22},"不扣除面积为0.33m2孔洞体积",{"key":27,"text":451,"correct":32},"不计伸入墙内的梁头体积",{"key":30,"text":453,"correct":22},"扣除预埋铁件体积",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},907141,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），现浇混凝土工程量计算正确的是（）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"雨蓬与圈梁连接时其工程量以梁中心为分界线",{"key":24,"text":461,"correct":32},"阳台梁与围梁连接部分并入圈梁工程量",{"key":27,"text":463,"correct":22},"挑檐板按设计图示水平投影面积计算",{"key":30,"text":465,"correct":22},"空心板按设计图示尺寸以体积计算，空心部分不予扣除",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},907142,"（2017年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），球型节点钢网架工程量（）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"按设计图示尺寸以质量计算",{"key":24,"text":473,"correct":22},"按设计图示尺寸以榀计算",{"key":27,"text":475,"correct":22},"按设计图示尺寸以铺设水平投影面积计算",{"key":30,"text":477,"correct":22},"按设计图示构件尺寸以总长度计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},907143,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），在三类土中挖基坑不放坡的坑深可达（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"1.2m",{"key":24,"text":485,"correct":22},"1.3m",{"key":27,"text":487,"correct":32},"1.5m",{"key":30,"text":489,"correct":22},"2.0m",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},907144,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），若开挖设计长为20m，宽为6m，深度为0.8m的土方工程，在清单中列顶应为（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"平整场地",{"key":24,"text":497,"correct":32},"挖沟槽",{"key":27,"text":499,"correct":22},"挖基坑",{"key":30,"text":501,"correct":22},"挖一般土方",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},907145,"（2016年真题）根据《房屋建筑与装饰工程量计量规范》（GB50854—2013），关于管沟石方工程量计算，说法正确的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":32},"按设计图示尺寸以管道中心线长度计算",{"key":24,"text":509,"correct":22},"按设计图示尺寸以截面积计算",{"key":27,"text":511,"correct":22},"有管沟设计时按管底以上部分体积计算",{"key":30,"text":513,"correct":22},"无管沟设计时按延长米计算",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},907146,"（2016年真题）根据《房屋建筑与装饰工程量计量规范》（GB50854—2013），关于土石方回填工程量计算，说法正确的是（）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"回填土方项目特征应包括填方来源及运距",{"key":24,"text":521,"correct":22},"室内回填应扣除间隔墙所占体积",{"key":27,"text":523,"correct":22},"场地回填按设计回填尺寸以面积计算",{"key":30,"text":525,"correct":22},"基础回填不扣除基础垫层所所占面积",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},907147,"（2016年真题）根据《房屋建筑与装饰工程量计量规范》（GB50854—2013），关于地基处理，说法正确的是（）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"铺设土工合成材料按设计长度计算",{"key":24,"text":533,"correct":22},"强夯地基按设计图示处理范围乘以深度以体积计算",{"key":27,"text":535,"correct":32},"填料振冲桩按设计图示尺寸以体积计算",{"key":30,"text":537,"correct":22},"砂石桩按设计数量以根计算",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},907148,"（2016年真题）根据《房屋建筑与装饰工程量计量规范》（GB50854—2013），关于砌墙工程量计算，说法正确的是（）。",[542,544,546,548],{"key":20,"text":543,"correct":32},"扣除凹进墙内的管槽、暖气槽所占体积",{"key":24,"text":545,"correct":22},"扣除伸入墙内的梁头、板头所占体积",{"key":27,"text":547,"correct":22},"扣除凸出墙面砌垛体积",{"key":30,"text":549,"correct":22},"扣除檁头、垫木所占体积",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":30,"analysis":33},907149,"（2016年真题）根据《房屋建筑与装饰工程量计量规范》（GB50854—2013），关于现浇混凝土柱高计算，说法正确的是（）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"有梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":24,"text":557,"correct":22},"无梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":27,"text":559,"correct":22},"框架柱的柱高自柱基上表面至柱顶高度减去各层板厚的高度计算",{"key":30,"text":561,"correct":32},"构造柱按全高计算",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},907150,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于预制混凝土构件工程量计算，说法正确的是（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"如以构件数量作为计量单位，特征描述中必须说明单件体积",{"key":24,"text":569,"correct":22},"异形柱应扣除构件内预埋铁件所占体积，铁件另计",{"key":27,"text":571,"correct":32},"大型板应扣除单个尺寸≤300mmx300mm的孔洞所占体积",{"key":30,"text":573,"correct":22},"空心板不扣除空洞体积",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},907151,"（2016年真题）后张法施工预应力混壤土，孔道长度为12.00m，采用后张混凝土自锚低合金钢筋。钢筋工程量计算的每孔钢筋长度为（）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"12.00m",{"key":24,"text":581,"correct":22},"12.15m",{"key":27,"text":583,"correct":32},"12.35m",{"key":30,"text":585,"correct":22},"13.00m",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":27,"analysis":33},907152,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）。关于金属结构工程量计算，说法正确的是（）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"钢桁架工程量应增加铆钉质量",{"key":24,"text":593,"correct":22},"钢桁架工程量中应扣除切边部分质量",{"key":27,"text":595,"correct":32},"钢屋架工程量中螺栓质量不另计算",{"key":30,"text":597,"correct":22},"钢屋架工程量中应扣除孔眼质量",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},907153,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）。关于门窗工程量计算，说法正确的是（）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"本质门带套工程量应按套外围面积计算",{"key":24,"text":605,"correct":22},"门窗工程量计量单位与顶目特征描述无关",{"key":27,"text":607,"correct":22},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":30,"text":609,"correct":32},"门窗工作量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":24,"analysis":33},907154,"（2016年真题）根据《房屋建筑与装饰工程工程量计算规范》（G850854-2013），屋面防水工程量计算，说法正确的是（）。 A.斜屋面卷材防水，工程量按水平投影面积计算 B.平屋面涂膜防水，工程量不扣除烟囱所占面积C平屋面女儿墙弯起部分卷材防水不计工程量 D.平屋面伸缩缝卷材防水不计工程量",[614,615,616,617],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]